Letter Sequence Request |
|---|
TAC:MD6311, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Approved, Closed) TAC:MD8314, Elimination of Requirements for a Post Accident Sampling System (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement
Results
Other: CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12, CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13, ML080860026, ML080860040, ML081700293, ML082410088, ML083460177, ML090480486, ML101200204, ML101260469, ML101600477, ML101680561, ML102170077, ML103010299, ML11213A130, ML11362A056, ML12234A688, ML13023A315, ML13213A194
|
MONTHYEARML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists Project stage: Request ML0732401242007-11-26026 November 2007 Summary of Meeting with Tennessee Valley Authority on Use of Eagle 21 at Watts Bar Unit 2 Project stage: Meeting ML0733900862007-12-0404 December 2007 Risk Informed Inservice Inspection Program Project stage: Request ML0734400222007-12-0505 December 2007 Westinghouse Eagle - 21 Process Protection System Project stage: Request ML0801705432008-01-0303 January 2008 Summary of December 12, 2007, Meeting with Tennessee Valley Authority on Reconstruction of the Licensing Basis for Watts Bar Unit 2 Project stage: Meeting ML0735209712008-01-0303 January 2008 Summary of Meeting with Tennessee Valley Authority on Reconstitution of the Licensing Basis for Watts Bar, Unit 2 Project stage: Meeting ML0803204432008-01-29029 January 2008 Regulatory Framework for the Completion of Construction and Licensing Activities Project stage: Request ML0803701852008-02-0101 February 2008 Request to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-520-2, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction Project stage: Other ML0733300822008-02-15015 February 2008 IMC 2517, Watts Bar Unit 2 Construction Inspection Program Project stage: Request ML0807702372008-03-13013 March 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Restructured Tables Project stage: Request ML0812105062008-05-0707 May 2008 Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) Project stage: RAI ML0808600262008-05-0808 May 2008 Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0808600402008-05-0808 May 2008 Enclosure 1- Watts Bar Nuclear Plant, Unit 2 - Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0810101162008-05-0808 May 2008 Review Topics for Safety Evaluation, Attachment 1 Project stage: Approval ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0813008092008-05-22022 May 2008 Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants Project stage: RAI ML0814901102008-05-28028 May 2008 Status of Generic Communications for Review (Tac No. MD8314) Project stage: Other ML0814901182008-05-28028 May 2008 NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 Project stage: Other ML0817002932008-06-16016 June 2008 Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 Project stage: Other ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML0818504592008-07-0202 July 2008 Response to Request for Additional Information Project stage: Response to RAI ML0821402382008-07-29029 July 2008 Generic Communications Status, Revision 1 Project stage: Other ML0824100882008-08-25025 August 2008 Westinghouse Eagle-21 Process Protection System Project stage: Other ML0827500192008-09-26026 September 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues Project stage: Other ML0825603732008-10-0202 October 2008 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates Project stage: Other ML0834601772008-12-0909 December 2008 Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) Project stage: Other ML0904804362009-02-23023 February 2009 Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities Project stage: Meeting ML0904804662009-02-23023 February 2009 NRR - Public Meeting WBN2 Status 12-11-08 Project stage: Meeting ML0904804712009-02-23023 February 2009 Region II - December 2008 Public Meeting with Notes Project stage: Meeting ML0904804862009-02-23023 February 2009 TVA December 11, 2008 - Public MtgR1 Project stage: Other ML1012002042010-04-20020 April 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1012604692010-04-29029 April 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 2, and Status of Generic Communications for Unit 2 - Revision 2 Project stage: Other ML1016004772010-06-0303 June 2010 Final Safety Analysis Report (FSAR) - Response to Preliminary Requests for Additional Information Project stage: Other ML1015903722010-06-0303 June 2010 Information Regarding Buried Piping/Cable Project stage: Request ML1016805612010-06-17017 June 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1017602222010-06-25025 June 2010 Request to Use ASME Boiler and Pressure Vessel Code, Code Case N-520-3, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction, Section III, Division 1 Project stage: Other ML1020404822010-06-30030 June 2010 WNA-DS-01667-WBT-NP, Rev. 1, Rras Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - Design Specification Project stage: Request ML1020404842010-06-30030 June 2010 Enclosure 5, WNA-DS-01617-WBT-NP, Rev. 1, Rras Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification Project stage: Request ML1021700772010-07-30030 July 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 Project stage: Other ML1022403822010-08-11011 August 2010 NRC August 3-4, 2010 Instrumentation and Controls Meeting - Request for Additional Information Project stage: Meeting ML1022900752010-08-16016 August 2010 Unit 2 - Change to Developmental TS Section 4.2.2, Control Rod Assemblies Project stage: Request ML1022801282010-08-16016 August 2010 OL - FW: 7-30-10_GL 95-07 RAI Response to NRC Project stage: Request ML1027005272010-09-29029 September 2010 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certification Project stage: Other ML1027404372010-10-12012 October 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Responses to the NRC Requests for Additional Information (Rais) for General Letter 2004-02 Project stage: RAI ML1030102992010-10-28028 October 2010 – Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 4, and Status of Generic Communications for Unit 2 - Revision 4 Project stage: Other ML1032100192010-10-31031 October 2010 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System (Nonproprietary), WNA-AR-001 80-WBT-NP, Revision 0, Dated October 2010. Attachment 2 Project stage: Request ML1031403142010-11-0101 November 2010 OL - TVA Letter to NRC_10-29-10_WBN U2 FSAR 101 Project stage: Request ML1032001462010-11-0909 November 2010 Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information Project stage: Response to RAI ML1032106442010-11-17017 November 2010 Revision of Commitment for Implementation of the Maintenance Rule Project stage: Request ML1106910592010-12-16016 December 2010 Request for Comments Project stage: Request 2008-08-25
[Table View] |
Text
February 25, 2011 MEMORANDUM TO:
Stephen J. Campbell, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing FROM:
Justin C. Poole, Project Manager /RA/
Watts Bar Special Projects Branch Division of Operating Reactor Licensing
SUBJECT:
FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)
DATE & TIME:
Friday, March 11, 2011 8:30 a.m. - 11:30 a.m.
PURPOSE:
To discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North Room O9-B06 11555 Rockville Pike, Rockville, Maryland CATEGORY 1:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). TVA licensing staff will be participating.
NRC TVA S. Campbell, NRR R. Mathew, NRR G. Arent et al.
L. Raghavan, NRR M. McConnell, NRR W. Crouch P. Milano, NRR et al.
J. Poole, NRR Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings@ (67 FR 36920), May 28, 2002.
S. Campbell Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before March 9, 2011, 2:30 p.m.
(Eastern Time) to get the telephone number and the pass code.
MEETING CONTACTS:
Justin Poole, NRR Patrick Milano, NRR 301-415-2048 301-415-1457 Justin.Poole@nrc.gov Patrick.Milano@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify one of the NRC meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket No. 50-391
Enclosure:
Agenda cc w/encl: Distribution via Listserv
ML110560465 OFFICE DORL/LPWB/PM DORL/LPWB/LA DORL/LPWB/BC NAME JPoole BClayton SCampbell DATE 2/ 25 /11 2/ 25 /11 2/ 25 /11
AGENDA U.S. NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH TENNESSEE VALLEY AUTHORITY WATTS BAR UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMITTALS March 11, 2011 8:30 a.m. - 9:00 a.m.
Introductions (NRC) 9:00 a.m. - 10:15 a.m.
Discussions on the Final Safety Analysis Report Submittals 10:15 a.m. - 10:20 a.m.
Break 10:20 a.m. - 11:20 a.m.
Discussions on the Final Safety Analysis Report Submittals 11:20 a.m. - 11:30 a.m.
Public Comments Enclosure