Submittal of 10 CFR 50.59 & 10 CFR 72.48 Changes, Tests & Experiments Summary Report Since June 12, 2008
ML101470055
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/24/2010
From: Krich R
Tennessee Valley Authority
To:
Document Control Desk, NRC/NMSS/SFPO, Office of Nuclear Reactor Regulation
References
Download: ML101470055 (13)


Text

Tennessee Valley Authority 1101 Market Street, LP 3R Chattanooga, Tennessee 37402-2801 R. M. Krich Vice President Nuclear Licensing May 24, 2010 10 CFR 50.4 10 CFR 50.59 10 CFR 72.4 10 CFR 72.48 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034

Subject:

10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report In accordance with 10 CFR 50.59(d)(2) and 10 CFR 72.48, the summary reports for evaluations of changes, tests, and experiments are required to be submitted at intervals not to exceed 24 months. The previous summary report for evaluations of changes, tests, and experiments performed in accordance with 10 CFR 50.59 and 10 CFR 72.48 was submitted on June 12, 2008. As such, the summary report for the evaluations that have occurred since June 12, 2008 are required to be submitted by June 12, 2010.

The enclosure to this letter provides the summary report of the implemented safety evaluations, performed in accordance with 10 CFR 50.59 and 10 CFR 72.48, that have occurred since the previous submittal dated June 12, 2008.

printed on recycled paper *, I -NI1*A

U.S. Nuclear Regulatory Commission Page 2 May 24, 2010 There are no commitments contained in this letter. If you have any questions, please contact J. W. Proffitt at (423) 843-6651.

Respectfuly R. M. Krich

Enclosure:

10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report cc (Enclosure):

NRC Regional Administrator- Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant

ENCLOSURE SEQUOYAH NUCLEAR PLANT 10 CFR 50.59 AND 10 CFR 72.48 CHANGES, TESTS, AND EXPERIMENTS

SUMMARY

REPORT E-1

DCN [ DESCRIPTION I SAFETY ANALYSIS D-22239-A This design change replaces the obsolete steam generator level The new digital DCS system replaces function-for-function control system (SGLCS) electronics with a digital distributed the old analog SGLCS with reliability improvements. The control system (DCS) manufactured by INVENSYS for Sequoyah new DCS provides redundant inputs, redundant processors, Unit 2. The components impacted directly with this modification networks and power supplies. The new system is are the electronic controls for the main feedwater pumps and the designated as "Quality Related" and is designed to meet electronic controls for the main and bypass feedwater control Quality Related requirements. The reliability of the new valves. The new system is composed of redundant fault tolerant system is superior to the old analog system. The processors, redundant input process signals, redundant power modification does not negatively impact any system, supplies (both sources and direct current [DC] supplies), structure or component (SSC) that is important to safety nor redundant switched control networks, and redundant operator does it impact the consequences or the frequency of their display units. occurrence. The new DCS does not cause a new type of malfunction or accident to be created. The new DCS The old analog equipment located in the auxiliary instrument room reduces the likelihood of SGLCS failures and their was replaced with DCS components which include field control consequences by providing a more reliable and redundant processors (FCPs), fieldbus modules (FBMs), fieldbus control system.

communications modules (FCMs), base plates, and cables. Also a new engineering work station (EWS) rack and master DCS rack The potential credible failure modes that have been identified were installed containing central processing units, monitor, printer, in the screening review are:

keyboard, mouse, and keyboard-video-mouse (ICVM) switches.

Failure of all feedwater regulating valves to close with the In the main control room, several instruments were removed MFPs slowing to their minimum speed.

and/or relocated on Control Panel No. M-3 to make room for two operator display units (flat screens). Old manual/auto stations for Control Group 1 failing low with both MFPs slowing to the main feedwater (MFW) regulating valve and bypass valves, their minimum speed with its associated controls valves and the main feed pump (MFP) speed controls were replaced by closed.

new manual/auto stations. New alarms for the DCS were added to the annunciator panel on Control Panel M-3. Input/output Control Group 1 failing high causing its associated equipment (FBMs, FCMs, base plates, and power supplies) were regulating valves to fail open and the MFP speed added to Control Panel M-1 1 to service the equipment in Panel increasing to the maximum RPM.

M-3.

These failure modes have been evaluated using methods Two new transmitters were added to each main steam header and and acceptance criteria contained in the current Updated feedwater header that provides redundant inputs into the DCS. Final Safety Analysis Report (UFSAR). The evaluation The old analog steam generator narrow range level median signal confirmed that all established analysis acceptance criteria selector (MSS) modules were replaced by a software MSS. continue to be met for the new DCS.

E-2

PROCEDURE DESCRIPTION SAFETY ANALYSIS Clearance Nos. 2- This activity involves establishment of a maintenance Removing the UCCs from service affects the ability to manage 30-1611 and 2 clearance boundary which removed Unit 2 containment the upper containment building temperatures. Technical 1622 building Upper Compartment Cooler (UCC) Nos. 2A, 2B, 2C, Specification (TS) Section 3.6.1.5.a requires the temperature in and 2D from service for a period which exceeded 90 days. the containment upper compartment to be maintained between The coolers are supplied with cooling water from the essential 85 degrees Fahrenheit (*F) and 105 0 F for normal operating raw cooling water (ERCW) system. The coolers were conditions. An alarm will indicate when upper compartment removed from service to support replacement of the ERCW temperatures exceed 100 0 F. Based on previous plant-specific supply piping that was, upon inspection, found to be below operating experience, upper compartment temperatures will the minimum required wall thickness. The coolers were out remain below the alarm value without any UCCs in service for of service from March of 2009 thru the start of the Unit 2 extended periods of time. If needed (as indicated by an alarm' Cycle 16 (U2C16) refueling outage in October 2009. The annunciation), administrative controls would permit at least one repair/replacement of the ERCW piping was completed train of upper compartment cooling to be placed in-service during the U2C16 refueling outage at which point the based on a structural integrity analysis of the ERCW supply maintenance clearance boundary was lifted, piping in accordance with American Society of Mechanical Engineers (ASME) Code Case N-513-2.

It was concluded that it was acceptable to implement the proposed activity based on 1) the UCCs were not expected to be needed to maintain the upper compartment temperatures within established operating limits, 2) if needed, one train of upper compartment cooling could be re-established by administrative controls, and 3) if one train of upper compartment cooling ability was insufficient to maintain the maximum temperature below established limits the actions for TS Section 3.6.1.5 will be followed.

E-3

UFSAR REVISION I DESCRIPTION SAFETY ANALYSIS Section 5.2.2.4.4 This section of the UFSAR contains a precaution which The original precaution can be conservatively interpreted to indicates that if all reactor coolant pumps (RCPs) have preclude RCP operation under water solid conditions during the stopped for more than 5 minutes during plant heatup (and performance of "sweeps and vents" during system recovery from the reactor coolant temperature is greater than the a refueling outage. The "sweep and vent" process involves charging and seal injection water temperature), RCP operation of one RCP in each loop sequentially followed by four restart will not be performed unless a steam bubble is pump operation to sweep non-condensable gases collected in the formed in the pressurizer. This change clarifies the intent steam generator tube high points to the reactor vessel head of this precaution. The revised text will indicate that the where they can be vented from the RCS prior to plant startup.

precaution is not applicable to RCP operation in Mode 5 This operation is separate and distinct from a plant heatup from when steam generator temperatures on the secondary cold shutdown conditions to power operating conditions.

side are no more than 25°F warmer than the reactor coolant system temperature. The change will specifically The proposed change will specifically permit operation of RCPs remove the restriction of starting a RCP under water solid under water-solid conditions for the purpose of performing "sweep conditions at temperatures less than 200°F (i.e., the and vent" operations. These operations are performed only in '

conditions under which "sweep and vent" operations are Mode 5. The system overpressure protection features will not be performed for the removal of gas voids in the high points challenged by RCP operation with the stated restriction of the of the reactor coolant system (RCS) prior to system return secondary temperature being no greater than 25°F warmer than to service following refueling outage activities). the primary temperature in Mode 5. In the unlikely event that the overpressure protection system devices are activated sufficient controls (i.e., temperatures less than 2000 F) have been established to limit the pressurization transient to well within the capability of the low temperature overpressure protection system (LTOPS) (for primary system protection) and the residual heat removal (RHR) pump suction relief valve (for RHR system protection) to mitigate the event. As such, the proposed change remains within the existing design basis for the reactor coolant and RHR systems and is acceptable for implementation.

The revised requirement is more restrictive that the 50°F difference specified in UFSAR Section 5.2.2.4.2 which serves as one of the design basis transients for the LTOPS. As such, it does not affect the ability of the LTOPS to provide adequate primary system overpressure protection for the Mode 5 operation.

The revision of the statement to allow pump starts at temperatures below 200'F is a less restrictive statement.

However, at temperatures below 200°F the RCS is not significantly warmer than either charging or seal injection. This E-4

UFSAR REVISION DESCRIPTION SAFETY ANALYSIS small temperature differential will restrict the volumetric expansion. Additionally, the expansion will happen on a portion of the specific volume curve where changes in temperature result in a small change in specific volume.

During the performance of the primary system "sweep and vent" operation the RHR system will be aligned to the primary system for shutdown cooling. As such, the RHR pump suction piping has the potential to be exposed to the same potential pressure transient as the primary system. The capacity of the RHR suction piping pressure relief valve has been previously evaluated with respect to primary system pressure transients during shutdown cooling. The evaluation concluded that the RHR suction relief valve has sufficient capacity to protect the RHR suction piping for the design basis LTOPS thermal addition transient (i.e., four RCPs in operation with the steam generator secondary side temperature 50°F warmer than the primary system) when primary system temperatures are less than 2000F. Given that the "sweep and vent" operation will be performed for primary system temperatures less than 200°F and the maximum allowable secondary system to primary system temperature difference will be limited to 25°F or less, the RHR suction relief valve will provide adequate overpressure protection for the RHR piping aligned to the primary system for shutdown cooling.

Section 5.6 This section of the UFSAR describes the provisions that An analysis was performed to determine the containment must be in place to address loss of decay heat removal temperature and pressure response following a postulated loss of when the RCS is in a reduced inventory condition decay heat removal capability during mid-loop operation. The consistent with the requirements of NRC Generic Letter evaluation concluded that the upper compartment coolers provide 88-17. The text indicates that one train of containment approximately 20 F of cooling benefit during the duration of the building upper compartment coolers (UCCs) will be transient and recovery and have no measurable effect on the maintained available and guidance will be provided on pressurization transient. As sufficient margins exist to meet the their use. temperature response acceptance criteria without operation of the UCCs, credit for their operation was conservatively deleted from The proposed change will remove the requirement to the analysis of record.

maintain at least one train of UCCs available during I mid-loop and reduced inventory operation.

E-5

WORK ORDER DESCRIPTION SAFETY ANALYSIS 09-771564-000 Based on concerns with the hydrology model used to establish Based on design reviews and field walkdowns, the 09-771564-001 the current Sequoyah probable maximum flood (PMF) elevation, additional compensatory actions imposed by these work the potential exists for the PMF elevation to increase from plant orders will ensure the operability of safety-related Elevation 719.6 ft to 722.6 ft. While the issues with the hydrology equipment consistent with the plant Flood Protection model are being address such that an accurate PMF elevation Plan for a potential maximum PMF elevation of 722.6 ft.

can be established, this activity will conservatively provide contingency PMF flood protection to Elevation 722.6 ft for interim The compensatory actions do not adversely affect other operation. Specifically, the following activities will be added to the aspects of the facility or procedures credited for safety scope of plant activities credited to prepare for a PMF event, functions.

Work Order 09-771564-000 installs passive flood protection for The work orders that implement the compensatory the diesel generator building. The passive flood protection measures are planned and available for work with all consists of 1) construction of sand bag dikes across the alcoves material required to implement the actions available at the building entrance doors and other building penetrations, on-site. Adequate man power is available to implement

2) sealing fill ports and manhole access to the 7-day fuel supply the additional actions.

tanks, 3) plugging sewer and drain lines that communicate with the yard and cannot be isolated, and 4) sealing the lower portion [Note: final PMF has been determined to be 722.0 ft]

of four doors subject to the flood elevation.

Work Order No. 09-771564-001 installs caps on the enclosure for the spent fuel pool cooling (SFPC) pumps.

E-6

DIOCUMENT NUMBER/

72.48 EVALUATION DESCRIPTION SAFETY ANALYSIS TRACKING NUMBER ECO 5014-179, RO Holtec has provided a clarification to the classification to its Holtec FSAR Appendix 2.C provides the current design supplement cooling system (SCS). The clarification changes the criteria for the Holtec supplied SCS. The SCS is used as Tracking No. 2010-01 classification of the SCS from Important to Safety Category B necessary to maintain the peak fuel cladding temperature (ITSB) to Not Important to Safety (NITS) with the exception of the below the limit of 752°F as set forth in Chapter 2 of the temperature monitoring instruments which remain ITSB. The Holtec FSAR during normal short-term operations as review evaluated the Holtec clarification to the Holtec FSAR. The defined in Section 2.2 of the Holtec FSAR. Section 2.C.5 evaluation also looked at NRC Regulatory Guide 7.10 which of Appendix 2.C states that the SCS is classified as ITSB.

provides guidance on classification of components. The NRC Regulatory Guide (RG) 7.10, Rev. 2, Appendix A, evaluation also looked at the guidance of NEI 96-07 Appendix B. Paragraph 2 states that Category B is for items that have The conclusion of the evaluation is that the clarification of the a major impact on safety and that Category B items could classification of the SCS is acceptable. include structures, systems, and components for which a failure or malfunction could indirectly result in a condition that would adversely affect public health and safety.

However, an unsafe condition could result only if the primary event occurs in conjunction with a secondary event or other failure or environmental occurrence. Holtec FSAR Table 8.1.6 also documents that the SCS is ITSB.

Holtec SCS Purchase Specification PS-1421 states that the SCS is NITS with the exception of the temperature monitoring instruments TG-1 and TG-2 which are used to provide indication that the system is functioning properly during normal operations. Normal operation is determined by measuring the differential temperature across the HI-TRAC. Therefore, the temperature monitoring instruments are ITSB.

Holtec has provided a clarification to the Holtec FSAR to reconcile the differences between the FSAR and the purchase specification with respect to SCS classification.

Holtec letter dated February 9, 2010, provides analysis for two scenarios evaluating the temperature reached by the fuel cladding with a loss of SCS. For multi-purpose canister's (MPCs) loaded to a maximum thermal payload of 28.74 kilowatt (kW) and helium backfilled to E-7

DIOCUMENT NUMBER/

72.48 EVALUATION DESCRIPTION SAFETY ANALYSIS TRACKING NUMBER 29.3-48.5 psig at 70°F to ensure a normal storage pressure of 5 atmosphere absolute, the maximum cladding temperature reaches 8720 F. For MPCs loaded to a maximum thermal payload of 36.9 kW and helium backfilled to 45.5-48.5 pounds per square inch gauge (psig) at 70°F to ensure a normal storage pressure of 7 atmosphere absolute, the maximum cladding temperature reaches 8830 F. Since the loss of SCS is classified as an off-normal event, the fuel clad temperature is allowed to go up to 10580 F. Since the analyzed fuel clad temperature due to the loss of SCS is less than the allowable limit, the fuel clad temperature is acceptable. Holtec Technical Specification 3.1.4 requires that the SCS be restored operable within 7 days and if that is unsuccessful, then the fuel is to be removed from the cask and returned to the spent fuel pool within the following 30 days.

The design basis accident is documented in Holtec FSAR, Section 11.2.16, SCS Failure. The credible failure modes associated with the SCS failure are simultaneous loss of external and backup power, or complete loss of annulus water from an uncontrolled leak or line break (reference Holtec FSAR 11.2.16.1). Holtec has evaluated additional failure modes in their February 9.

2010 letter. Even with the SCS failure, no other failure modes were found credible which would cause the FSAR limits to be exceeded. The fuel clad temperature remains within the limits allowed by the FSAR with the failure of the SCS.

72.212 Evaluation The NRC has reviewed and approved HI-STORM 100 Certificate The changes to the SQN 10 CFR 72.212 Evaluation Report, Rev 4 of Compliance (CoC) 1014, Amendment No.5, for use in Report are summarized and discussed in detail in accordance with the general license provisions of 10 CFR 72, Attachment A to the screening review. Most of the Tracking No. 2010-02 Subpart K. Changes to the HI-STORM 100 FSAR that are changes were editorial in nature or provided updates to incorporated into Revision 7 represent changes to reflect analysis the report to incorporated new or revised information submitted to the NRC and changes by the certificate holder in resulting from the adoption of Holtec CoC, Amendment 5, E-8

DIOCUMENT NUMBER/

72.48 EVALUATION DESCRIPTION SAFETY ANALYSIS TRACKING NUMBER _

accordance with the provisions of 10 CFR 72.48 and the authority and Holtec FSAR, Revision 7. As such, most of the granted to the certificate holder. SON intends to store high changes did not result in any change to a SQN site burnup fuel (HBF) as a first time evolution under HI-STORM 100 specific written evaluation used to support the 72.212 CoC 1014, Amendment No.5. Evaluation Report. However, implementation of storage of HBF at SQN under Holtec CoC 1014, Amendment 5 In accordance with 10 CFR 72.212 (b) (2) (ii), the licensee shall resulted in one change to a written evaluation.

evaluate any changes to the written evaluations (i.e., documented Re-analysis to account for non-fuel hardware burnable in SQN's 10 CFR 72.212 Written Evaluation Report) required by poison rod assemblies (BPRAs) required changes to this paragraph using the requirements of 10 CFR 72.48(c). SQN written evaluations needed to document higher levels of intends to place into storage cask systems that have been dose. SQN Calculation SQS2-0224, "10 CFR 72.212 design, fabricated, tested, and subsequently to be loaded under Reactor Site Parameters Evaluation," is the SQN the Part 72 codified CoC No. 1014, Amendment 5, and its calculation of record that documents the site specific associated updated FSAR Revision 7. The use of CoC 1014, evaluations issued in support of the 10 CFR 72.212 Amendment 5, and its associated updated FSAR, is a first time Evaluation Report. The change that resulted in a change evolution at the SQN Independent Spent Fuel Storage Installation to a written evaluation used in support of the SQN (ISFSI). SQN currently operates an ISFSI using the same CoC 10 CFR 72.212 report, as documented in SQN 1014 although under previous Amendments 1 and 2. Moderate Calculation SQS2-0224, are summarized as follows.

burn-up fuel (MBF) is currently authorized for SQN under Holtec CoC 1014 Amendment 2 and is defined as a commercial spent IMPACT TO WRITTEN EVALUATION fuel assembly with an average burn-up of less than or equal to 45000 MWD/MTU. HBF, authorized under Holtec CoC 1014, A review of calculation SQNSQS2-0171 for impact due to Amendment 5 is defined as a commercial spent fuel assembly Holtec CoC Amendment 5 identified the following dose with an average burn-up of greater than 45000 MWD/MTU. issue:

This review evaluates the changes to the SQN 10 CFR 72.212 Westinghouse Electric Company analysis LTR-REA Evaluation Report that are necessary to document the 175, Revision 1, "Sequoyah ISFSI Site Boundary Dose acceptability of use of the cask system certified under CoC 1014 Calculation," did not account for burnable poison rod Amendment 5 at the SQN ISFSI and Holtec FSAR Revision 7. assemblies (BPRA) in the design basis fuel source term.

To correct this, SQS2-0224 was revised to document an increase from 10.06 mrem/year to 11.47 mrem/year of dose to the site boundary for ISFSI anticipated occurrences (off normal events) combined with ISFSI normal operations and other site operations.

10 CFR 72.104 gives the ISFSI a 25 mrem/year dose limit at the site boundary.

E-9

DIOCUMENT NUMBER/

72.48 EVALUATION DESCRIPTION SAFETY ANALYSIS TRACKING NUMBER It was shown that the gamma component of the total dose rate for existing analyzed fuel with 35,000 MWD/MTU and 3 years cooling source term remains bounding (including HBF) as the design basis fuel for calculating the site boundary dose.

Offsite doses due to a SQN ISFSI accident in accordance with 10 CFR 72.106 are based on effluents from one postulated cask failure and do not include the 10 CFR 72.104 off normal dose component, and therefore are not impacted.

4 4 EDC E22443A TVA drawing 47W455-4 establishes actions to take for ISFSI During ISFSI operations, it is possible that a Part 50 operations coincident with a Part 50 loss of coolant accident / loss accident could occur. TVA calculation SQS2-0225 Tracking No. 2010-03 of offsite power. The ISFSI accident which could take place evaluates this condition. This calculation already during this time is a failure of the supplement cooling system addresses the actions to take during previous campaigns (SCS). The required actions have been reviewed within TVA performed under Holtec Certificate of Compliance (CoC) calculation SQS2-0225 to determine if they are achievable within 1014 Amendment 2. For ISFSI operations under Holtec certain timeframes. Mission dose is also addressed within this CoC 1014 Amendment 5, this calculation has been calculation. The conclusion is that the actions are achievable and revised to address the requirements from Holtec CoC that there is sufficient time to perform the necessary actions 1014 Amendment 5 and the corresponding Holtec FSAR without exceeding regulatory dose limits. Revision 7. The calculation forms a basis for actions for the plant to take which are shown on drawing 47W455-4 which is revised as a part of this EDC. This demonstrates compliance with 10 CFR 72.122 (d) and (k).

Amendment 5 of the Holtec CoC 1014, and Amendment 7 of the Holtec FSAR have been approved to permit storage of HBF and introduces new equipment and new operating requirements, such as the requirement to meet NRC Interim Staff Guidance (ISG) 11," Revision 3 temperature limits by use of a mandatory SCS. The FSAR described design function of the SCS is to ensure that mandatory temperature limits are met for MBF E-10

DIOCUMENT NUMBER/

72.48 EVALUATION DESCRIPTION SAFETY ANALYSIS TRACKING NUMBER resulting in a MPC heat load "GREATER THAN" 28.74 kW, or for any HBF. This assures that cladding temperature limits are met at higher MPC heat loads assuring compliance with ISG 11, Revision 3 requirements.

The SCS provides heat removal from the MPC to maintain the peak fuel cladding temperature below the limit set forth in Chapter 2 of the FSAR during normal short-term operations. ISG 11 limits the peak cladding temperature to 752°F for normal operations. For off-normal and accident conditions, the peak cladding temperature limit is 10580 F. Holtec Technical Specification 3.1.4 requires that the SCS be restored operable within 7 days'and if that is unsuccessful, then the fuel is to be removed from the cask and returned to the spent fuel pool within the following 30 days. The SCS is required to be monitored and maintained operable or otherwise in compliance with its TS action statements even in the event of a coincident 10 CFR 50 event.

E-11