ML13289A227

From kanterella
Jump to navigation Jump to search
6.a.ii.14 SQN Hours of Operation Annual Air Report 2012
ML13289A227
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/13/2013
From: John Carlin
Tennessee Valley Authority
To: Frazier J
Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A227 (5)


Text

S58 130513 801 Air Correspondence May13, 2013 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from January 1 to December 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-08C and 4150-20200102-11 C.

If you have any questions regarding this report, please contact Taylor Korth at (423) 843-6713 or Dawn Booker at (423) 843-6700 of Sequoyah's Environmental staff.

DBN Enclosure cc:

S.D. Booker, OPS5N-SQN B. E. Brickhouse, BR 4A-C J. G Byars II, BR 4A-C J.T. Carlin, OPS 4A-SQN J. A. Cross, POB 2A-SQN M. McBrearty, OPS 4A-SQN D. B. Nida, BR 4A-C A. A. Ray, LP 3K-C G. R. Signer, WT 6A-K P. R. Simmons, POB 28-SQN B. N. Smith (EDMS), MPB 1 E-M C.L. Wilson, LP 1G-C

SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT JANUARY 1-DECEMBER 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of O_Q_eration of Operation Auxiliary Boilers 2,000 (combined)

Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined}

0 Hours Emergency Diesel 204 Hours 29.00 Hours Generator 1-A Emergency Diesel 204 Hours 55.48 Hours Generator 2-A Emergency Diesel 204 Hours 30.69 Hours Generator 1-B Emergency Diesel 204 Hours 56.96 Hours Generator 2-B

, Blackout Diesel 204 Hours 1.63 Hours Generator 1 Blackout Diesel 204 Hours 0.55 Hours Generator 2

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 May 13, 2013 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from January 1 to December 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-0SC and 4150-20200102-11C.

If you have any questions regarding this report, please contact Taylor Korth at (423) 843-6713 or Dawn Booker at (423) 843-6700 of Sequoyah's Environmental staff.

ice President Sequoyah Nuclear Plant Enclosure

SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT JANUARY 1 -DECEMBER 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)

Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 29.00 Hours Generator 1-A Emergency Diesel 204 Hours 55.48 Hours Generator 2-A Emergency Diesel 204 Hours 30.69 Hours Generator 1-B Emergency Diesel 204 Hours 56.96 Hours Generator 2-B Blackout Diesel 204 Hours 1.63 Hours Generator 1 Blackout Diesel 204 Hours 0.55 Hours Generator 2

REVIEW/CONCURRENCE SHEET DOCUMENT NAME: Hours of Operation Annual Report ORGANIZATION: Environmental DOCUMENT PREPARED BY: Taylor Korth DATE: 4/30/2013 CONCURRENCES Name R

C Signature - Comment Date V

N T.E. Korth X

D.B. Nida X

J.A. Cross INSTRUCTIONS:. Originator will determine the review/concurrence assignment.

REVIEW:

Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization.

CONCURRENCE:

Indication of agreement with the document as a whole.

Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient. A concurrence signature indicates that the individual would be willing to sign the document for the agency.