MONTHYEARML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML23184A0332023-04-20020 April 2023 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2, and 30-Day for Sequoyah Nuclear Plant, Unit 2 ML22018A0392022-01-13013 January 2022 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2021 ML21326A1312021-11-22022 November 2021 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML20343A2542020-12-0303 December 2020 Annual Non-Radiological Environmental Operating Report - 2020 ML20310A2642020-11-0505 November 2020 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant, Units 1 and 2 ML19295D6592019-10-22022 October 2019 10 CFR 50.46 Annual and 30-Day Report for Sequoyah Nuclear Plant Units 1 and 2 ML18325A0412018-11-20020 November 2018 Transmittal of 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant, Units 1 and 2 CNL-17-145, Submittal of 10 CFR 50.46 Annual Report2017-11-28028 November 2017 Submittal of 10 CFR 50.46 Annual Report ML16334A3152016-11-28028 November 2016 Submittal of 10 CFR 50.46 Annual Report ML16021A4382016-01-19019 January 2016 Transmittal of 2015 Biocide/Corrosion Treatment Plan Annual Report ML14330A3262014-11-21021 November 2014 CFR 50.46 Annual Report of Non-Significant Changes ML14118A3802014-04-16016 April 2014 2013 Annual Radioactive Effluent Release Report ML14118A3812014-04-16016 April 2014 Annual Radiological Environmental Operating Report ML14037A3732014-02-0404 February 2014 Annual Water Withdrawal Update ML13192A3292013-07-0505 July 2013 10 CFR 50.59, and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report ML13289A2272013-05-13013 May 2013 6.a.ii.14 SQN Hours of Operation Annual Air Report 2012 ML12333A2412012-11-20020 November 2012 CFR 50.46 Annual Report ML1212202502012-04-30030 April 2012 Annual Radioactive Effluent Release Report for 2011 ML11335A1712011-11-30030 November 2011 10 CFR 50.46 Annual Report of Non-Significant Changes ML11126A1952011-04-29029 April 2011 Annual Radioactive Effluent Release Report ML1109506832011-04-0101 April 2011 Submittal of Annual Insurance Status Report ML1014700552010-05-24024 May 2010 Submittal of 10 CFR 50.59 & 10 CFR 72.48 Changes, Tests & Experiments Summary Report Since June 12, 2008 ML1012409202010-04-28028 April 2010 Submittal of Annual Radiological Environmental Operating Report 2009 ML1004909292010-02-0909 February 2010 2009 Biocide/Corrosion Treatment Plan (B/Ctp) Annual Report - NPDES Permit No. TN0026450 ML0831105712008-11-0606 November 2008 Annual Environmental Operating Report for Period from October 1, 2007 Through September 30, 2008 ML0632504762006-11-20020 November 2006 Annual Environmental Operating Report for Period October 1, 2005 Through September 30, 2006 ML0612502992006-04-27027 April 2006 Annual Radiological Environmental Operating Report - 2005 ML0513702642005-04-29029 April 2005 2004 Annual Radioactive Effluent Release Report (ARERR) ML0430101122004-10-26026 October 2004 Annual Environmental Operating Report for October 1, 2003 Through September 30, 2004 ML0415602892004-05-27027 May 2004 10 CFR 50.59, Changes, Tests, and Experiments Summary Report ML0312606762003-04-21021 April 2003 Annual Radiological Environmental Operating Report - 2002 2024-04-26
[Table view] Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] |
Text
1\14 TENNESSEE VALLEY AUTHORITY Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, TN 37384 January 13, 2022 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Sequoyah Nuclear Plant, NPDES Biocide/Corrosion Treatment Plan Annual Report, CY 2021 Attached is the NPDES Biocide/Corrosion Treatment Plan Annual Report for 2021 for Sequoyah Nuclear Plant.
Respectfully, Travis R. Markum Environmental Scientist
From: Markum, Travis R To: Sarah Terpstra; "Michael Bascom" Cc: Water Permits; Pierson, Callan
Subject:
TN0026450 SQN BCTP Annual Report 2021 Date: Thursday, January 13, 2022 3:54:00 PM Attachments: BCTP Annual Report 2021 01.13.22.pdf See attached Biocide/Corrosion Treatment Plan annual report for 2021 for Sequoyah Nuclear Plant.
An electronic copy was also attached to the December 2021 DMR submittal for Outfall 101.
Travis R. Markum Env. Scientist (Compliance)
Environmental Operations TVA Sequoyah Nuclear Plant PO Box 2000, OPS 5N Soddy Daisy, TN 37384
(: 423-843-6714
- trmarkum@tva.gov NOTICE: This electronic message transmission contains information that may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in both civil and criminal penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution, or use of the content of this information is prohibited. If you have received this communication in error, please notify me immediately by email and delete the original message.
TV4 TENNESSEE VALLEY AUTHORITY Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, TN 37384 Sent Via Electronic Mail January 13, 2022 Ms. Sarah Terpstra Division of Water Resources Tennessee Department of Environment and Conservation (TDEC)
William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, 11th Floor Nashville, Tennessee 37243
Dear Ms. Terpstra:
TENNESSEE VALLEY AUTHORITY (TVA)- SEQUOYAH NUCLEAR PLANT (SQN)- NPDES PERMIT NO. TN0026450 - BIOCIDE/CORROSION TREATMENT PLAN (B/CTP) ANNUAL REPORT 2021 Enclosed is a copy of the CY 2021 8/CTP Annual report for SQN . All treatments in 2021 were conducted in accordance with the approved 8/CTP.
If you have any questions or need additional information, please contact Travis Markum at (423) 843-6714 or by e-mail at trmarkum@tva.gov of Sequoyah's Environmental staff.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Sincerely,
?a~!~
Senior Manager, Chemistry/Environmental Sequoyah Nuclear Plant Enclosures cc (Electronic Distribution w/ Enclosures):
Mr. Michael Bascom Chattanooga Environmental Field Office Division of Water Resources 1301 Riverfront Parkway, Suite #206 Chattanooga, Tennessee 37402 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D.C. 20555
TN0026450 SQN 2021 Biocide/Corrosion Treatment Plan Annual Report Flogard MS6236 Duration in Analytical Results Quantity in Pounds Hours (mass balance calculations)
(hrs/day) (lbs/day) (mg/L)
Days of Month Maximum* Maximum Average Limit Maximum Average Limit Treatment (based on days in service)
January - - - 2275 - - 0.2 -
February - - - 2275 - - 0.2 -
March - - - 2275 - - 0.2 -
April - - - 2275 - - 0.2 -
May 19.5 334 293 2275 0.0285 0.0285 0.2 5 June 24.0 418 270 2275 0.0289 0.0284 0.2 22 July 24.0 1444 552 2275 0.0309 0.0286 0.2 19 August 19.0 987 527 2275 0.0289 0.0285 0.2 22 September 19.0 708 340 2275 0.0291 0.0285 0.2 15 October - - - 2275 - - 0.2 -
November 24.0 418 279 2275 0.0287 0.0285 0.2 15 December 24.0 417 293 2275 0.0291 0.0286 0.2 16 Jan. - Dec. 24.0 1444 - 2275 0.0309 - 0.2 114 Per Part III.E of the NPDES permit: "WET testing shall be performed twice per year at Outfall 101: once per year when oxidizing biocides are being used, and once per year when non-oxidizing biocides are being used."
- Maximum treatment duration is listed individually per system: ERCW A, ERCW, B and RCW.
TN0026450 SQN 2021 Biocide/Corrosion Treatment Plan Annual Report Spectrus BD 1500 Duration in Analytical Results Quantity in Pounds Hours mass balance calculations (hrs/day) (lbs/day) (mg/L)
Days of Month Maximum* Maximum Average Limit Maximum Average Limit Treatment (based on days in service)
January 0.4 26 26 50 0.0510 0.0478 2.0 4 February 0.5 29 25 50 0.0470 0.0470 2.0 7 March 0.5 29 23 50 0.0480 0.0473 2.0 7 April 0.3 22 17 50 0.0560 0.0529 2.0 14 May 0.3 19 12 50 0.0820 0.0577 2.0 14 June 0.3 19 14 50 0.0560 0.0474 2.0 14 July 0.3 19 19 50 0.0470 0.0468 2.0 13 August 0.3 19 16 50 0.0470 0.0470 2.0 13 September 0.3 19 16 50 0.0470 0.0468 2.0 10 October 0.3 19 19 50 0.0880 0.0848 2.0 13 November 0.4 28 21 50 0.0880 0.0531 2.0 7 December 0.5 38 31 50 0.0480 0.0472 2.0 6 Jan. - Dec. 0.5 38 - 50 0.0880 - 2.0 122 Per the B/CTP approval: Spectrus BD1500 is a surfactant that is injected into the ERCW and RCW systems for approximately 30 minutes prior initiating chlorination to enhance the effectiveness of the chlorination.
- Maximum treatment duration is listed individually per system: ERCW A, ERCW, B and RCW.
TN0026450 SQN 2021 Biocide/Corrosion Treatment Plan Annual Report Spectrus CT1300 Duration in Analytical Results Quantity in Pounds Hours mass balance calculations (hrs/day) (lbs/day) (mg/L)
Days of Month Maximum* Maximum Average Limit Maximum Average Limit Treatment (based on days in service)
January - - - 855 - - 0.1 -
February 15.0 300 240 855 0.0334 0.0333 0.1 4 March 14.8 297 253 855 0.0336 0.0335 0.1 4 April 15.0 240 192 855 0.0477 0.0473 0.1 4 May 21.8 438 281 855 0.0332 0.0331 0.05 6 June 21.8 438 299 855 0.0331 0.0330 0.05 6 July 14.8 295 220 855 0.0367 0.0348 0.05 2 August 24.0 483 263 855 0.0331 0.0330 0.05 6 September 24.0 483 298 855 0.0334 0.0330 0.05 8 October 22.3 230 164 855 0.0467 0.0467 0.1 3 November 24.0 406 258 855 0.0330 0.0299 0.05 5 December - - - 855 - - 0.05 -
Jan. - Dec. 24.0 483 - 855 0.0477 - 0.05 48 Per Part III.E of the NPDES permit: "WET testing shall be performed twice per year at Outfall 101: once per year when oxidizing biocides are being used, and once per year when non-oxidizing biocides are being used."
Outfall 101: Toxicity was sampled September 12-17, 2021 during Spectrus CT 1300 treatment Test Results: Pimephales promelas : IC25 >100%
Ceriodaphnia dubia : IC25 > 100%
Outfall 110: There has been no discharge from Outfall 110 January - December 2021.
- Maximum treatment duration is listed individually per system: ERCW A, ERCW, B and RCW.
TN0026450 SQN 2021 Biocide/Corrosion Treatment Plan Annual Report Towerbrom 960 Duration in Analytical Results Quantity in Pounds Hours mass balance calculation (hrs/day) (lbs/day) (mg/L)
Days of Month Maximum* Maximum Average Limit Maximum Average Limit Treatment (based on days in (see Note) (see Note) (daily max) service)
January 4.0 150 84 1425 <0.05 <0.05 0.047 8 February 4.0 125 97 1425 <0.05 <0.05 0.047 8 March 4.0 125 100 1425 <0.05 <0.05 0.047 9 April 4.0 125 108 1425 <0.05 <0.05 0.047 15 May 4.0 150 84 1425 <0.05 <0.05 0.047 14 June 4.0 150 123 1425 <0.05 <0.05 0.047 20 July 4.0 175 158 1425 <0.05 <0.05 0.047 21 August 4.0 175 148 1425 <0.05 <0.05 0.047 22 September 4.0 225 154 1425 <0.05 <0.05 0.047 21 October 4.0 175 151 1425 <0.05 <0.05 0.047 18 November 4.0 250 108 1425 <0.05 <0.05 0.047 13 December 4.0 125 111 1425 <0.05 <0.05 0.047 11 Jan. - Dec. 4.0 250 - 1425 <0.05 - 0.047 180 Per Part III.E of the NPDES permit: "WET testing shall be performed twice per year at Outfall 101: once per year when oxidizing biocides are being used, and once per year when non-oxidizing biocides are being used."
Outfall 101: Toxicity was sampled June 6-11, 2021 during Towerbrom 960 treatment.
Test Results: Pimephales promelas : IC25 >100%
Ceriodaphnia dubia : IC25 > 100%
Outfall 110: There has been no discharge from Outfall 110 January - December 2021.
- Maximum treatment duration is listed individually per system: ERCW A, ERCW, B and RCW.
NOTE: Per Part I.3.b.3) of the NPDES permit effective August 1, 2020: "The method detection level (MDL) for TRC shall not exceed 0.05 mg/L unless the permittee demonstrates that its MDL is higher."