MONTHYEARML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 IR 05000266/20220062023-03-0101 March 2023 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022006 and 05000301/2022006) ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22256A3182022-09-13013 September 2022 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection Report 05000266/2023010 05000301/2023010 IR 05000266/20220052022-08-26026 August 2022 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005) ML22175A2002022-06-27027 June 2022 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information: Inspection Report 05000266/2022004: 05000301/2022004 ML22173A0172022-06-22022 June 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Point Beach Nuclear Plant ML22172A2132022-06-22022 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000266/20210062022-03-0202 March 2022 Annual Assessment Letter for Point Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021006 and 05000301/2021006) ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 IR 05000266/20210052021-09-0101 September 2021 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021005 and 05000301/2021005) ML21214A2812021-08-0202 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21180A2302021-06-29029 June 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2021004 and 05000301/2021004 ML21074A3962021-03-15015 March 2021 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000266/2021010; 05000301/2021010 IR 05000266/20200062021-03-0404 March 2021 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020006 and 05000301/2020006) IR 05000266/20200052020-09-0101 September 2020 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020005 and 05000301/2020005) ML20218A4322020-08-0505 August 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2020004 ML20168A8912020-06-15015 June 2020 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Point Beach Nuclear Plant, Units 1 and 2 IR 05000266/20190062020-03-0303 March 2020 Annual Assessment Letter for Point Beach Nuclear Plants, Units 1 and 2 (Report 05000266/2019006 and 05000301/2019006) IR 05000266/20190052019-08-28028 August 2019 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2019005 and 05000301/2019005) ML19190A1532019-07-0909 July 2019 Ltr. 07/09/19 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000266/2019012; 05000301/2019012 (DRS-G.Hausman) ML19136A1402019-05-15015 May 2019 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Garza) ML19094B1182019-04-0404 April 2019 Ltr. 04/04/19 Point Beach Nuclear Plant, Units 1 and 2 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the EQ Program; Inspection Report 05000266/2019013 and 05000301/2019013 (DRS-B.Jose) IR 05000266/20180062019-03-0404 March 2019 Annual Assessment Letter for Point Beach Nuclear Plant (Report 05000266/2018006 and 05000301/2018006) ML19037A3102019-02-0505 February 2019 Ltr. 02/05/19 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection; Inspection Report 05000266/2019412; 05000301/2019412 (DRS-G.Hausman) ML19024A2772019-01-24024 January 2019 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2019001 (DRS-M.Domke) IR 05000266/20180052018-08-28028 August 2018 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2018005 and 05000301/2018005) IR 05000266/20170062018-03-0202 March 2018 Annual Assessment Letter for Point Beach Plant, Units 1 and 2 (Report 05000266/2017006 and 05000301/2017006) IR 05000266/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000266/2017005 and 05000301/2017005) ML17088A7242017-03-29029 March 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000266/2017007; 05000301/2017007 IR 05000266/20160062017-03-0101 March 2017 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2016006 and 05000301/2016006) ML17039B0182017-02-0808 February 2017 Information Request to Support Upcoming Temporary Instruction 2515/191 Inspection at Point Beach Nuclear Plant, Units 1 and 2 - Inspection Report 05000266/2017008; 05000301/2017008 IR 05000266/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant Units 1 and 2 (Report 05000266/2016005; 05000301/2016005) IR 05000266/20150062016-03-0202 March 2016 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Inspection Report 05000266/2015006 and 05000301/2015006) IR 05000266/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2015005; 05000301/2015005) ML15131A3132015-05-0808 May 2015 Ltr. 05/08/15 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (Mod/50.59) Baseline Inspection 05000266/2015010; 05000301/2015010 (Jjc) ML15124A9012015-05-0101 May 2015 Ltr. 05/01/15 Point Beach Nuclear Plant, Unit 2 - Notification of NRC Inspection and Request for Information (Msh) IR 05000266/20140012015-03-0404 March 2015 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2014001; 05000301/2014001) ML15050A2702015-02-19019 February 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Point Beach Nuclear Plant, Units 1 and 2 ML14245A1662014-09-0202 September 2014 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 IR 05000266/20130012014-03-0404 March 2014 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2013001; 05000301/2013001) ML14038A3472014-02-0606 February 2014 ISI Request for Information ML13246A2212013-09-0303 September 2013 2013 Point Beach MOC Letter Combined 2024-08-21
[Table view] Category:Letter
MONTHYEARIR 05000266/20240032024-11-0505 November 2024 Integrated Inspection Report 05000266/2024003 and 05000301/2024003 ML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2009 Mr. Larry Meyer Site Vice-President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Meyer:
On August 20, 2009, the NRC staff completed its performance review of Point Beach Nuclear Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only-Security Related Information" will include the Security Cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Point Beach Nuclear Plant, Units 1 and 2, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. As you have submitted a license amendment for an extended power uprate for both units in 2009, we will also begin conducting inspections in accordance with Inspection Procedure 71004, Power Uprate, based on the portions of the amendment accepted by the NRC.
In our Annual Assessment letter, dated March 4, 2009, (ADAMS Accession Number ML090630351), we advised you of the continuation of a substantive cross-cutting issue in the area of human performance involving a cross-cutting theme in the aspect of inadequate procedures (H.2(c)). We indicated this would remain open until we gained confidence in the performance of your corrective action program to evaluate and correct problems. This mid-cycle assessment of cross-cutting issues included a review of inspection results over the 12 month period of July 1, 2008, through June 30, 2009. Performance over the last two quarters of the assessment period resulted in one additional finding with a cross-cutting theme related to inadequate procedures. Further, the number of findings during the assessment period with an associated cross-cutting aspect of inadequate procedures showed an improving trend, decreasing from seven to four findings. In this current assessment, the number of issues with the same cross-cutting aspect still meets the criterion for continuing this theme; however,
L. Meyer we do not have a concern with your scope of efforts or progress in addressing this theme and, therefore, this substantive cross-cutting issue is closed.
We based this conclusion partly on a focused assessment of your corrective actions involving this cross-cutting aspect that we conducted during the biennial Problem Identification and Resolution (PI&R) Inspection performed in March 2009. This inspection concluded the evaluation methods to determine the root and contributing causes were acceptable and subsequent corrective actions were clearly described and entered into the corrective action program. Overall, it appeared that the corrective actions appropriately addressed the aspects of the root cause and would prevent recurrence (ML091280093).
You discussed the results of your actions taken to address this cross-cutting theme in a public meeting on April 29, 2009. Your presentation included the actions taken and the resulting improvement in this area and concluded this improved performance would be sustained (ML091200704). In addition, you provided an update of these actions in a public meeting on July 29, 2009 (ML092110784).
Additionally, in our Annual Assessment letter, dated March 4, 2009, we advised you of a substantive cross-cutting issue in the area of PI&R involving a cross-cutting theme in the aspect of appropriate and timely corrective actions (P.1(d)). The mid-cycle assessment of the cross-cutting issue included a review of inspection results over the 12 month period of July 1, 2008, through June 30, 2009. In this current assessment, we did not identify the continuation of this theme. The issue has been satisfactorily resolved as evidenced by only one finding with this cross-cutting aspect identified in this assessment period and by the results from your corrective actions presented in the public meetings on April 29 and July 29, 2009. This is also supported by our focused assessment of your corrective actions involving this cross-cutting aspect in the biennial PI&R Inspection performed in March 2009.
In accordance with the January 2007 Confirmatory Order (ML063630336), you conducted an independent safety culture survey in 2008 and provided a summary of the results to us in December 2008 (ML083660387). As your independent safety culture survey results documented only nominal improvements from your previous independent safety culture survey, we requested that prior to the end of the second quarter of 2009 you conduct an independent assessment of the corrective actions taken in response to your culture surveys. You presented the results of the independent assessment in the public meeting on July 29, 2009, and concluded that the 2008 completed corrective actions and planned corrective actions are more effective than the 2004 and 2006 corrective actions and provide reasonable assurance that the progress can be sustained. As presented at the meeting, your conclusion seemed appropriate.
To complete our review of the January 2007 Confirmatory Order, we will conduct Inspection Procedure 92702, Follow-Up on Traditional Enforcement Actions Including Violations, and Alternative Dispute Resolution Confirmatory Orders, in the third quarter of 2009.
The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through December 31, 2010.
The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the
L. Meyer last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Michael Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
K. Steven West, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
Point Beach Inspection/Activity Plan DISTRIBUTION:
See next page
Letter to L. Meyer from K. West dated September 1, 2009
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 cc w/encl: M. Nazar, Senior Vice-President and Chief Nuclear Officer A. Khanpour, Vice-President, Engineering Support Licensing Manager, Point Beach Nuclear Plant M. Cornell, Director, Licensing and Performance Improvement M. Ross, Vice President and Associate General Counsel A. Fernandez, Senior Attorney J. Bjorseth, Plant Manager R. Anderson, Vice-President, Nuclear Plant Support R. Kundalkar, Vice-President, Fleet Organizational Support K. Duveneck, Town Chairman, Town of Two Creeks Chairperson, Public Service Commission of Wisconsin J. Kitsembel, Electric Division, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer Chairman, Manitowoc County Board County Executive, Manitowoc Director, Manitowoc County Emergency Management Agency Chairman, Kewaunee County Board Mayor of Kewaunee City Manager, Two Rivers Director, Kewaunee County Emergency Management Agency President, Village of Mishicot Chairman, Village of Two Creeks G. Mortensen, INPO
L. Meyer last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Michael Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
K. Steven West, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
Point Beach Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\BRANCH TSS\ALL MOC\MIDCYCLE 2008 TO 2009\MID-CYCLE LETTERS\POINT BEACH 2009 MOC LETTER.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JJandovitz for KSWest MKunowski:cms DATE 08/31/09 08/29/09 OFFICIAL RECORD COPY
Letter to L. Meyer from K. West dated September 1, 2009
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMPointBeach RidsNrrDirslpob Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
Point Beach Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 08/31/2009 09/04/2009 IP 7111111B Licensed Operator Requalification Program BI ENG - INSERVICE INSPECTION & TI-172 REVISION 1 2 11/02/2009 11/19/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/02/2009 11/19/2009 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 10/26/2009 10/30/2009 IP 7112101 Access Control to Radiologically Significant Areas 10/26/2009 10/30/2009 IP 7112102 ALARA Planning and Controls 10/26/2009 10/30/2009 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 3 11/30/2009 12/18/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 12/07/2009 12/11/2009 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 12/07/2009 12/11/2009 IP 7111402 Alert and Notification System Testing 12/07/2009 12/11/2009 IP 7111403 Emergency Response Organization Augmentation Testing 12/07/2009 12/11/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 12/07/2009 12/11/2009 IP 71151-EP01 Drill/Exercise Performance 12/07/2009 12/11/2009 IP 71151-EP02 ERO Drill Participation 12/07/2009 12/11/2009 IP 71151-EP03 Alert & Notification System BI ENG - ENGINEERING INSERVICE INSPECTION - U1 1 03/01/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 03/01/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR RENEWAL - LICENSE RENEWAL 71003 PHASE 1 - U1 2 03/01/2010 03/26/2010 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/15/2010 03/19/2010 IP 7112101 Access Control to Radiologically Significant Areas 03/15/2010 03/19/2010 IP 7112102 ALARA Planning and Controls BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 05/10/2010 05/28/2010 IP 7111105T Fire Protection [Triennial]
BI ENG - TRIENNIAL FIRE INS INFO GATHERING TRIP 3 04/26/2010 04/30/2010 IP 7111105T Fire Protection [Triennial]
BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/12/2010 07/16/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 07/12/2010 07/16/2010 IP 71151-BI01 Reactor Coolant System Activity 07/12/2010 07/16/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness
Point Beach Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/12/2010 07/16/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent RENEWAL - LICENSE RENEWAL 71003 - PHASE 2 - U1 6 08/09/2010 08/27/2010 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/30/2010 09/03/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/27/2010 10/01/2010 IP 7112101 Access Control to Radiologically Significant Areas 09/27/2010 10/01/2010 IP 7112102 ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/15/2010 11/19/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 12/06/2010 12/10/2010 IP 7111401 Exercise Evaluation 12/06/2010 12/10/2010 IP 71151-EP01 Drill/Exercise Performance 12/06/2010 12/10/2010 IP 71151-EP02 ERO Drill Participation 12/06/2010 12/10/2010 IP 71151-EP03 Alert & Notification System