UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2009 Mr. Larry Meyer Site Vice-President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

Dear Mr. Meyer:

On August 20, 2009, the NRC staff completed its performance review of Point Beach Nuclear Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only-Security Related Information" will include the Security Cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Point Beach Nuclear Plant, Units 1 and 2, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. As you have submitted a license amendment for an extended power uprate for both units in 2009, we will also begin conducting inspections in accordance with Inspection Procedure 71004, Power Uprate, based on the portions of the amendment accepted by the NRC.

In our Annual Assessment letter, dated March 4, 2009, (ADAMS Accession Number ML090630351), we advised you of the continuation of a substantive cross-cutting issue in the area of human performance involving a cross-cutting theme in the aspect of inadequate procedures (H.2(c)). We indicated this would remain open until we gained confidence in the performance of your corrective action program to evaluate and correct problems. This mid-cycle assessment of cross-cutting issues included a review of inspection results over the 12 month period of July 1, 2008, through June 30, 2009. Performance over the last two quarters of the assessment period resulted in one additional finding with a cross-cutting theme related to inadequate procedures. Further, the number of findings during the assessment period with an associated cross-cutting aspect of inadequate procedures showed an improving trend, decreasing from seven to four findings. In this current assessment, the number of issues with the same cross-cutting aspect still meets the criterion for continuing this theme; however,

L. Meyer we do not have a concern with your scope of efforts or progress in addressing this theme and, therefore, this substantive cross-cutting issue is closed.

We based this conclusion partly on a focused assessment of your corrective actions involving this cross-cutting aspect that we conducted during the biennial Problem Identification and Resolution (PI&R) Inspection performed in March 2009. This inspection concluded the evaluation methods to determine the root and contributing causes were acceptable and subsequent corrective actions were clearly described and entered into the corrective action program. Overall, it appeared that the corrective actions appropriately addressed the aspects of the root cause and would prevent recurrence (ML091280093).

You discussed the results of your actions taken to address this cross-cutting theme in a public meeting on April 29, 2009. Your presentation included the actions taken and the resulting improvement in this area and concluded this improved performance would be sustained (ML091200704). In addition, you provided an update of these actions in a public meeting on July 29, 2009 (ML092110784).

Additionally, in our Annual Assessment letter, dated March 4, 2009, we advised you of a substantive cross-cutting issue in the area of PI&R involving a cross-cutting theme in the aspect of appropriate and timely corrective actions (P.1(d)). The mid-cycle assessment of the cross-cutting issue included a review of inspection results over the 12 month period of July 1, 2008, through June 30, 2009. In this current assessment, we did not identify the continuation of this theme. The issue has been satisfactorily resolved as evidenced by only one finding with this cross-cutting aspect identified in this assessment period and by the results from your corrective actions presented in the public meetings on April 29 and July 29, 2009. This is also supported by our focused assessment of your corrective actions involving this cross-cutting aspect in the biennial PI&R Inspection performed in March 2009.

In accordance with the January 2007 Confirmatory Order (ML063630336), you conducted an independent safety culture survey in 2008 and provided a summary of the results to us in December 2008 (ML083660387). As your independent safety culture survey results documented only nominal improvements from your previous independent safety culture survey, we requested that prior to the end of the second quarter of 2009 you conduct an independent assessment of the corrective actions taken in response to your culture surveys. You presented the results of the independent assessment in the public meeting on July 29, 2009, and concluded that the 2008 completed corrective actions and planned corrective actions are more effective than the 2004 and 2006 corrective actions and provide reasonable assurance that the progress can be sustained. As presented at the meeting, your conclusion seemed appropriate.

To complete our review of the January 2007 Confirmatory Order, we will conduct Inspection Procedure 92702, Follow-Up on Traditional Enforcement Actions Including Violations, and Alternative Dispute Resolution Confirmatory Orders, in the third quarter of 2009.

The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through December 31, 2010.

The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the

L. Meyer last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Michael Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

K. Steven West, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Point Beach Inspection/Activity Plan DISTRIBUTION:

See next page

Letter to L. Meyer from K. West dated September 1, 2009

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 cc w/encl: M. Nazar, Senior Vice-President and Chief Nuclear Officer A. Khanpour, Vice-President, Engineering Support Licensing Manager, Point Beach Nuclear Plant M. Cornell, Director, Licensing and Performance Improvement M. Ross, Vice President and Associate General Counsel A. Fernandez, Senior Attorney J. Bjorseth, Plant Manager R. Anderson, Vice-President, Nuclear Plant Support R. Kundalkar, Vice-President, Fleet Organizational Support K. Duveneck, Town Chairman, Town of Two Creeks Chairperson, Public Service Commission of Wisconsin J. Kitsembel, Electric Division, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer Chairman, Manitowoc County Board County Executive, Manitowoc Director, Manitowoc County Emergency Management Agency Chairman, Kewaunee County Board Mayor of Kewaunee City Manager, Two Rivers Director, Kewaunee County Emergency Management Agency President, Village of Mishicot Chairman, Village of Two Creeks G. Mortensen, INPO

L. Meyer last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Michael Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

K. Steven West, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Point Beach Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME: G:\BRANCH TSS\ALL MOC\MIDCYCLE 2008 TO 2009\MID-CYCLE LETTERS\POINT BEACH 2009 MOC LETTER.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JJandovitz for KSWest MKunowski:cms DATE 08/31/09 08/29/09 OFFICIAL RECORD COPY

Letter to L. Meyer from K. West dated September 1, 2009

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMPointBeach RidsNrrDirslpob Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Point Beach Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 08/31/2009 09/04/2009 IP 7111111B Licensed Operator Requalification Program BI ENG - INSERVICE INSPECTION & TI-172 REVISION 1 2 11/02/2009 11/19/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/02/2009 11/19/2009 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 10/26/2009 10/30/2009 IP 7112101 Access Control to Radiologically Significant Areas 10/26/2009 10/30/2009 IP 7112102 ALARA Planning and Controls 10/26/2009 10/30/2009 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 3 11/30/2009 12/18/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 12/07/2009 12/11/2009 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 12/07/2009 12/11/2009 IP 7111402 Alert and Notification System Testing 12/07/2009 12/11/2009 IP 7111403 Emergency Response Organization Augmentation Testing 12/07/2009 12/11/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 12/07/2009 12/11/2009 IP 71151-EP01 Drill/Exercise Performance 12/07/2009 12/11/2009 IP 71151-EP02 ERO Drill Participation 12/07/2009 12/11/2009 IP 71151-EP03 Alert & Notification System BI ENG - ENGINEERING INSERVICE INSPECTION - U1 1 03/01/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 03/01/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR RENEWAL - LICENSE RENEWAL 71003 PHASE 1 - U1 2 03/01/2010 03/26/2010 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/15/2010 03/19/2010 IP 7112101 Access Control to Radiologically Significant Areas 03/15/2010 03/19/2010 IP 7112102 ALARA Planning and Controls BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 05/10/2010 05/28/2010 IP 7111105T Fire Protection [Triennial]

BI ENG - TRIENNIAL FIRE INS INFO GATHERING TRIP 3 04/26/2010 04/30/2010 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/12/2010 07/16/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 07/12/2010 07/16/2010 IP 71151-BI01 Reactor Coolant System Activity 07/12/2010 07/16/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness

Point Beach Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/12/2010 07/16/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent RENEWAL - LICENSE RENEWAL 71003 - PHASE 2 - U1 6 08/09/2010 08/27/2010 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/30/2010 09/03/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/27/2010 10/01/2010 IP 7112101 Access Control to Radiologically Significant Areas 09/27/2010 10/01/2010 IP 7112102 ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/15/2010 11/19/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 12/06/2010 12/10/2010 IP 7111401 Exercise Evaluation 12/06/2010 12/10/2010 IP 71151-EP01 Drill/Exercise Performance 12/06/2010 12/10/2010 IP 71151-EP02 ERO Drill Participation 12/06/2010 12/10/2010 IP 71151-EP03 Alert & Notification System