April 13, 2004 LICENSEE: Omaha Public Power District (OPPD)

FACILITY: Fort Calhoun Station, Unit 1

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS FUTURE PROJECTS On March 25, 2004, the NRC staff conducted a meeting with OPPD to discuss future scheduled projects at the Fort Calhoun Station, Unit 1 (FCS). A list of attendees is attached. The presentation slides are available in ADAMS under Accession Nos. ML041000440.

OPPD presented an overview of future projects. OPPD is planning to spend approximately 400 million dollars over the next 4 years in plant improvements. With the extension of the operating license until 2033, OPPD felt it was prudent to upgrade many of the plant components in anticipation of another 30 years of operation. Some of the major projects are:

 Replacement of main condensers

 Replacement of steam generators

 Replacement of reactor vessel head

 Replacement of pressurizer

 Replacement of station transformer

 Construction of dry cask storage facility OPPD has stated that most of this work will be done under 10 CFR 50.59. Some minor technical specifications changes and relief requests will be needed, but in general these projects will not require prior staff review and approval. The staff agreed, but noted that OPPD needs to keep the staff informed of the progress of this work and promptly inform the staff on any licensing issues that may evolve that would require the staffs review and approval.

OPPD noted that all these projects have been designed with margin that would allow a future power uprate of up to 17 percent. However, because of construction of a new 600 MWe oil-fire plant, OPPD has decided to delay the implementation for this upgrade. Depending on future needs, OPPD will determine when it will seek to uprate the plant.

/RA/

Alan Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285

Attachment:

List of Meeting Attendees cc w/att: See next page

April 13, 2004 LICENSEE: Omaha Public Power District (OPPD)

FACILITY: Fort Calhoun Station, Unit 1

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS FUTURE PROJECTS On March 25, 2004, the NRC staff conducted a meeting with OPPD to discuss future scheduled projects at the Fort Calhoun Station, Unit 1 (FCS). A list of attendees is attached. The presentation slides are available in ADAMS under Accession Nos. ML041000440.

OPPD presented an overview of future projects. OPPD is planning to spend approximately 400 million dollars over the next 4 years in plant improvements. With the extension of the operating license until 2033, OPPD felt it was prudent to upgrade many of the plant components in anticipation of another 30 years of operation. Some of the major projects are:

 Replacement of main condensers

 Replacement of steam generators

 Replacement of reactor vessel head

 Replacement of pressurizer

 Replacement of station transformer

 Construction of dry cask storage facility OPPD has stated that most of this work will be done under 10 CFR 50.59. Some minor technical specifications changes and relief requests will be needed, but in general these projects will not require prior staff review and approval. The staff agreed, but noted that OPPD needs to keep the staff informed of the progress of this work and promptly inform the staff on any licensing issues that may evolve that would require the staffs review and approval.

OPPD noted that all these projects have been designed with margin that would allow a future power uprate of up to 17 percent. However, because of construction of a new 600 MWe oil-fire plant, OPPD has decided to delay the implementation for this upgrade. Depending on future needs, OPPD will determine when it will seek to uprate the plant.

/RA/

Alan Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285 DISTRIBUTION:

PUBLIC TMensha

Attachment:

List of Meeting Attendees PDIV-2 Reading RTadessee, EDO RidsNrrPMAWang RidsRgnIVMailCenter cc w/att: See next page RidsOgcRp (CJohnson)

RidsAcrsAcnwMailCenter SCoffin RidsNrrDlpm (TMarsh/ELeeds) JUhle RidsNrrDlpmPdiv (HBerkow) TChan RidsNrrLAEPeyton JTsao WBateman HAshar BElliot GMakar Handouts: ML041000440 Meeting Notice: ML040690960 PKG: ML041050474 ACCESSION NO.: ML041050455 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME ABWang:mp EPeyton SDembek DATE 4/13/04 4/12/04 4/13/04 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041050455.wpd OFFICIAL RECORD COPY

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1400 L Street, N.W. Iowa Department of Public Health Washington, DC 20005-3502 401 SW 7th Street, Suite D Des Moines, IA 50309 Chairman Washington County Board of Supervisors Mr. Richard P. Clemens P.O. Box 466 Division Manager - Nuclear Assessments Blair, NE 68008 Omaha Public Power District Fort Calhoun Station Mr. John Kramer, Resident Inspector P.O. Box 550 U.S. Nuclear Regulatory Commission Fort Calhoun, NE 68023-0550 P.O. Box 310 Fort Calhoun, NE 68023 Mr. R. T. Ridenoure Division Manager - Nuclear Operations Regional Administrator, Region IV Omaha Public Power District U.S. Nuclear Regulatory Commission Fort Calhoun Station FC-2-4 Adm.

611 Ryan Plaza Drive, Suite 400 Post Office Box 550 Arlington, TX 76011-4005 Fort Calhoun, Nebraska 68023-0550 Ms. Sue Semerera, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Cententiall Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. John B. Herman Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550

MEETING WITH OMAHA PUBLIC POWER DISTRICT LIST OF ATTENDEES March 25, 2004 OPPD S. Gambhir R. Short J. Cate R. Bayer F. Jensen R. Cyboron J. Bradeau AREVA M. Parece P. Marin-Lafleche C. Molseed Bechtel W. Smith A. Morrow NRC H. Berkow W. Bateman A. Wang B. Elliot S. Coffin J. Uhle T. Chan J. Tsao H. Ashar G. Makar