Meeting Summary of 9/24/03 Meeting Re. Discussion of Planned Consolidation of Quality Assurance (QA) Programs
ML033230078
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 11/21/2003
From: Nadiyah Morgan
NRC/NRR/DLPM/LPD2
To:
Morgan N, NRR/DLPM, 415-3650
Shared Package
ML033230122 List:
References
TAC MC0732, TAC MC0733, TAC MC0734, TAC MC0735, TAC MC0736, TAC MC0737
Download: ML033230078 (8)


Text

November 21, 2003 LICENSEE: Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company FACILITIES: Surry Units 1 and 2, North Anna Units 1 and 2, Millstone Units 2 and 3

SUBJECT:

MEETING

SUMMARY

- DISCUSSION OF PLANNED CONSOLIDATION OF QUALITY ASSURANCE (QA) PROGRAMS (TAC NOS. MC0732, MC0733, MC0734, MC0735, MC0736, AND MC0737)

On September 24, 2003, a public meeting was held between the U. S. Nuclear Regulatory Commission (NRC), and the representatives of Virginia Electric and Power Company and Dominion Nuclear Connecticut, Inc., at NRC Headquarters, in Rockville, MD. The purpose of the meeting was to discuss the plans for a consolidated QA Program for Surry Power Station, North Anna Power Station, and Millstone Power Station.

The licensees generally discussed the changes they plan to make to transition to a QA program that applies to all Dominion nuclear facilities. The licensees stated that the new program will be based on the NQA-1-1994 standard, and that it will apply to independent spent fuel storage facilities and any new acquisition or new construction.

The licensees plan to submit the program for NRC staff review in the near future.

A list of meeting attendees is included as Attachment 1. Attachment 2 contains a copy of the Quality Assurance Program Description handout presented at the meeting.

Please direct any inquiries to Nadiyah Morgan at 301-415-3650, or Christopher Gratton at 301-415-1055.

/RA/

Nadiyah Morgan, Nuclear Safety Intern, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-338, 50-339, 50-336, and 50-423 Attachments:

1. List of Attendees
2. Meeting Handout cc w/atts: See next page

ML033230078 OFFICE PDII-1/PM PDII-1/Intern PDII-2/LA DIPM/IEPB PDII-1/SC NAME CGratton NMorgan:sab EDunnington DThatcher JNakoski DATE 11/20/03 11/20/03 11/19/03 11/20/03 11/20/03 LIST OF ATTENDEES DOMINION DISCUSSION ON QA PROGRAMS SEPTEMBER 24, 2003 NAME ORGANIZATION Kerry Rhoads Dominion Ronald Berryman Dominion Dorothy Bruce Dominion Stephen Monarque NRC/DLPM Victor Nerses NRC/DLPM John Nakoski NRC/DLPM Robert Pulsifer NRC/DLPM Gregory Twachtman McGraw Hill Chris Gratton NRC/DLPM Rob Temps NRC/SFPO Dale Thatcher NRC/IEPB/QMS Ken Heck NRC Nadiyah Morgan NRC/DLPM Anthony Bolyen NMC Attachment 1

Virginia Electric and Power Company cc:

Ms. Lillian M. Cuoco, Esq. Office of the Attorney General Senior Counsel Commonwealth of Virginia Dominion Resources Services, Inc. 900 East Main Street Building 475, 5th Floor Richmond, Virginia 23219 Rope Ferry Road Rt. 156 Mr. Chris L. Funderburk, Director Waterford, Connecticut 06385 Nuclear Licensing & Operations Support Mr. Richard H. Blount, II Innsbrook Technical Center Site Vice President Dominion Resources Services, Inc.

Surry Power Station 5000 Dominion Blvd.

Virginia Electric and Power Company Glen Allen, Virginia 23060-6711 5570 Hog Island Road Surry, Virginia 23883-0315 Mr. Jack M. Davis Site Vice President Senior Resident Inspector North Anna Power Station Surry Power Station Virginia Electric and Power Company U. S. Nuclear Regulatory Commission P. O. Box 402 5850 Hog Island Road Mineral, Virginia 23117-0402 Surry, Virginia 23883 Mr. C. Lee Lintecum Chairman County Administrator Board of Supervisors of Surry County Louisa County Surry County Courthouse P.O. Box 160 Surry, Virginia 23683 Louisa, Virginia 23093 Dr. W. T. Lough Old Dominion Electric Cooperative Virginia State Corporation 4201 Dominion Blvd.

Commission Glen Allen, Virginia 23060 Division of Energy Regulation P. O. Box 1197 Senior Resident Inspector Richmond, Virginia 23218 North Anna Power Station U.S. Nuclear Regulatory Commission Robert B. Strobe, M.D., M.P.H. 1024 Haley Drive State Health Commissioner Mineral, Virginia 23117 Office of the Commissioner Virginia Department of Health Mr. David A. Christian P.O. Box 2448 Sr. Vice President and Chief Nuclear Officer Richmond, Virginia 23218 Virginia Electric and Power Company Innsbrook Technical Center Mr. William R. Matthews 5000 Dominion Boulevard Vice President - Nuclear Operations Glen Allen, Virginia 23060-6711 Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard

Millstone Power Station, Unit Nos. 2 and 3 cc:

Edward L. Wilds, Jr., Ph.D. Ms. Nancy Burton Director, Division of Radiation 147 Cross Highway Department of Environmental Redding Ridge, CT 00870 Protection 79 Elm Street Mr. G. D. Hicks Hartford, CT 06106-5127 Director - Nuclear Station Safety and Licensing Regional Administrator, Region I Dominion Nuclear Connecticut, Inc.

U.S. Nuclear Regulatory Commission Rope Ferry Road 475 Allendale Road Waterford, CT 06385 King of Prussia, PA 19406 Mr. Evan W. Woollacott First Selectmen Co-Chair Town of Waterford Nuclear Energy Advisory Council 15 Rope Ferry Road 128 Terrys Plain Road Waterford, CT 06385 Simsbury, CT 06070 Mr. W. R. Matthews Mr. William D. Meinert Senior Vice President - Nuclear Nuclear Engineer Operations Massachusetts Municipal Wholesale Dominion Nuclear Connecticut, Inc. Electric Company Rope Ferry Road P.O. Box 426 Waterford, CT 06385 Ludlow, MA 01056 Charles Brinkman, Director Mr. David W. Dodson Washington Operations Nuclear Services Licensing Supervisor Westinghouse Electric Company Dominion Nuclear Connecticut, Inc.

12300 Twinbrook Pkwy, Suite 330 Roper Ferry Road Rockville, MD 20852 Waterford, CT 06385 Senior Resident Inspector Mr. S. E. Scace Millstone Power Station Assistant to the Site Vice President c/o U.S. Nuclear Regulatory Commission Dominion Nuclear Connecticut, Inc.

P. O. Box 513 Rope Ferry Road Niantic, CT 06357 Waterford, CT 06385 Mr. P. J. Parulis Mr. M. J. Wilson Manager - Nuclear Oversight Manager - Nuclear Training Dominion Nuclear Connecticut, Inc. Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Mr. John Markowicz Mr. A. J. Jordan, Jr.

Co-Chair Director - Nuclear Engineering Nuclear Energy Advisory Council Dominion Nuclear Connecticut, Inc.

9 Susan Terrace Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385

Millstone Power Station, Unit Nos. 2 and 3 cc:

Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.