ML033160421

From kanterella
Jump to navigation Jump to search

Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs
ML033160421
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 11/21/2003
From:
Office of Nuclear Reactor Regulation
To:
Morgan N, NRR/DLPM, 415-3650
Shared Package
ML033160421 List:
References
TAC MC0732, TAC MC0733, TAC MC0734, TAC MC0735, TAC MC0736, TAC MC0737
Download: ML033160421 (16)


Text

Quality Assurance Program Description Consolidated Program for All Nuclear Facilities

MWA,4201. 0 0 Upwininiol 79 :

Purpose

  • Discuss plans for a consolidated QA Program
  • Obtain any feedback or' lessons learned from other submittals !

Program Applicability

  • Have a Quality Assurance Program that will apply to multiple nuclear facilities
  • Operation and decommissioning of Surry, North Anna, and Millstone and any associated ISFSI
  • New acquisitions
  • New construction

New QAPD

  • Upgrade to common commitments where practicable
  • Include new design and construction activities

Program Scope

  • All phases of the life of a nuclear facility
  • Design
  • Construction
  • Operation
  • Decommissioning

Applicable Facilities

  • Nuclear Power Stations
  • Independent Spent Fuel Storage Installations

Applicable Activities

  • Those requiring QA measures not governed by App. B
  • Radioactive Material Shipping
  • Security
  • Other Programs

tro.granaForm-at \

  • Similar to SRP chapters 7.la172and Draft Review Standard RS - Stion 17. 1.1.
  • SRP chapter 17.3 used as guidance since it addresses NQA-1 and withdrawal of certain Regulatory Guides not addressed in 17.1 and 17.2 acceptance criteria

Program Format

  • Describes the high-level Quality Assurance program
  • Will not describe details that are already contained within standards

AirDomiion Major Changes

  • Reduce the use of multiple standards by incorporating administrative controls described in ANSI N1 8.7/ANS 3.2 that are not already included in NQA-1

- Generic organizational description

1\ajor Changes

  • Common alternatives Where feasible
  • Proposed QC program fpr North Anna and Surry currently in NRC review
  • Independent review program that addresses the ISEG functions X

Major Changes

  • New items not covered by the Operating QA Program
  • Siting for new facilities, and any limited work activities covered under the early site permit

Areas to Resolve

  • Level of detail required in describing the organizational structure
  • Improved Technical Specifications
  • Administrative Letter 95-06
  • Generic descriptions allowed by 50.54(a)
  • Comparison to other utilities' QAPD

Owl'r Bma~ainon Areas to Resolve Different standards for qualification of personnel

- Technical Specifications differ between sites

  • Intend to refer to the applicable Technical Specifications, then to QAPD where not stated in Technical Specifications
  • Otherwise this could require as many as nine TS changes

Submittal to NRC

  • Submit as a new program
  • Covers activities not addressed by the current existing Operational QA programs
  • Change to the NQA- 1 standards
  • Submittal in November 2003

Submittal to NTC Request Common Review

  • One Project Manager coordination
  • One set of reviewers