MONTHYEARML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22046A2802022-02-23023 February 2022 Relief from ASME Code Paragraph ISTP-3540(b) Related to High Pressure Injection Pumps Vibration Measurements ML22046A2452022-02-18018 February 2022 Regarding Alternative to Implement Code Case OMN-22, Smooth Running Pumps ML22028A3652022-02-0707 February 2022 Authorization and Safety Evaluation for Alternative Acceptance Criteria for Code Case N-853 ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RA-20-0036, Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping2020-03-0202 March 2020 Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping ML20042D7142020-02-13013 February 2020 Relief Request 19-ON-002 for Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in ASME Code Case N-770-2 RA-19-0028, Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress2019-03-21021 March 2019 Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 22018-11-12012 November 2018 Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML16118A2302016-04-30030 April 2016 Relief Request 14-ON-022 Alternative Requirements for Class 2 Residual Heat Removal Heat Exchange Welds ML16053A5012016-03-0101 March 2016 Relief Request ON-GRR-01 Grace Period for OM Code Frequencies (CAC Nos. MF7130, MF7131, and MF7132) ML16004A1812016-01-0707 January 2016 Relief Request 14-ON-003 Alternative Requirements for Class 1 Category B-J Piping Welds ML16004A2622016-01-0707 January 2016 Relief Request 15-ON-004: Limited Visual Examinations of the Reactor Pressure Vessel Support Skirt for the Fourth 10-Year Inservice Inspection Interval Program ML15349A4532015-12-29029 December 2015 Relief Request 15-ON-001 Repair of Low Pressure Service Water System Piping ONS-2015-087, Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-003, Limited Volume Inspections from 3EOC27 Outage2015-07-15015 July 2015 Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-003, Limited Volume Inspections from 3EOC27 Outage ONS-2015-088, Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-004, Limited Visual Examinations from 1 EOC27, 2EOC26 and 3EOC27 Outages2015-07-15015 July 2015 Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-004, Limited Visual Examinations from 1 EOC27, 2EOC26 and 3EOC27 Outages ML13365A0232014-01-17017 January 2014 Relief from the Requirements of the ASME Code for Fourth 10-Year Interval Inspection Program Request for Relief ML13066A1002013-02-27027 February 2013 End of Cycle (EOC) 27 Refueling Outage Steam Generator Inservice Inspection Report ML13045A2902013-02-15015 February 2013 Relief from the Requirements of the ASME OM Code ML13038A1522013-01-31031 January 2013 Fourth Ten-Year Inservice Inspection Plan, Request for Relief No. 12-ON-001 ML13038A1502013-01-31031 January 2013 Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 12-ON-002 ML12173A3122012-06-18018 June 2012 Approval Request for the Fifth Ten-Year Inservice Test Program Interval Pump Specific Code Relief Request No. ON-SRP-HPI-03 ML12030A0892012-01-23023 January 2012 Duke Energy Carolinas - Relief Request Serial #09-GO-001 Request for NRC Clarification ML11143A0592011-06-21021 June 2011 Relief Request 10-ON-001 for Reactor Vessel Core Flood Nozzle Weld Examinations ML1106605882011-03-28028 March 2011 Relief Request (RR) Proposed Alternative for Certain Vibration Measurement Requirements RR (ON-SRP-HPI-03)) (TAC Nos. Me 3840, ME3841, ME3842, ME5790, ME5791, ME5792, ME5793, ME5794 and ME5795) ML1016604732010-06-0909 June 2010 Relief Request No. 10-ON-001, Alternative to Volumetric Examination Requirements for the Residual Heat Removal (RHR) Heat Exchanger Class 2 Nozzle-to-Shell Welds ML1008802862010-03-31031 March 2010 Relief Request 09-ON-003 for the Use of Full Structural Weld Overlay & Alternative Examination Techniques, for the Letdown Line, Reactor Vessel Core Flood & Reactor Coolant Pump Inlet & Outlet Nozzle Butt Welds. ML1006006982010-03-0303 March 2010 Relief, Request 09 ON-005 for Reactor Vessel Core Flood Nozzle Weld Examinations (ME1846, ME1847, and ME1848) ML0927403122009-09-24024 September 2009 Relief Request from Immediate ASME Code Flaw Repair of Standby Shutdown Facility Auxiliary Service Water Piping ML0921500282009-07-28028 July 2009 Fourth Ten Year Inservice Inspection Interval Request for Relief No. 09-ON-005 ML0914702652009-05-20020 May 2009 Request for Extension of Duke Response Time to Referenced Letter ML0908307262009-03-20020 March 2009 Fourth Ten Year Inservice Inspection Interval, Request for Relief No. 09-ON-003 ML0833600322008-11-20020 November 2008 Summary Ultrasonic Examination Results of Completed ML0810200532008-04-0707 April 2008 Relief Request No. 08-ON-003, from Immediate ASME Code Flaw Repair of Low Pressure Service Water Piping ML0734600272008-01-17017 January 2008 Relief Request to Use Preemptive Weld Overlay and Alternative Examination Techniques on Decay Heat Removal Line to Hotleg Nozzle Welds ML0715605102007-05-29029 May 2007 Fourth Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-007, Revision 1 ML0712300902007-04-27027 April 2007 Part 21 Interim Report, Dresser Investigation File No. 2007-02, Interim Reporting of a Potential Defect Involving Power Actuated Pressure Relief Valves Supplied to Calvert Cliffs, Fort Calhoun and Oconee Plants ML0626202342006-09-11011 September 2006 Relief Request 06-ON-004 Request for Additional Information ML0622902642006-08-0909 August 2006 Response to Request for Additional Information Request for Relief No. 05-ON-004 ML0619400162006-07-0606 July 2006 Replacement of Steam Generators Request for Relief No. 04-ON-007, Rev. 1 ML0609302482006-05-0404 May 2006 Relief Request 05-ON-003 ML0608302912006-04-17017 April 2006 Relief, Volumetric Examination of Essentially 100 Percent of the Volume as Required by the ASME, Boiler and Pressure Vessel Code, Section XI, for Class 1 and 2 Welds ML0608301052006-04-14014 April 2006 SE MC5483 and MC5483, Relief Request RR-04-ON-013 ML0536302312006-03-13013 March 2006 Relief Request MC8852, Repair of Steam Generator Tubes 2023-09-25
[Table view] Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] Category:Safety Evaluation
MONTHYEARML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22349A1452022-12-19019 December 2022 Non-Proprietary Safety Evaluation Related to the SLRA of Oconee Nuclear Station, Units 1, 2, and 3 ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22096A1872022-07-15015 July 2022 Issuance of Amendment Nos. 424, 426, and 425 Revise TS 3.7.7, Low Pressure Service Water (LPSW) System to Extend the Completion Time for One Required Inoperable LPSW Pump ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22068A0252022-03-15015 March 2022 Code Case OMN-28 - Alternative Valve Position Verification Approach to Satisfy ISTC-3700 for Valves Not Susceptible to Stem-Disk Separation ML22046A2802022-02-23023 February 2022 Relief from ASME Code Paragraph ISTP-3540(b) Related to High Pressure Injection Pumps Vibration Measurements ML22046A2452022-02-18018 February 2022 Regarding Alternative to Implement Code Case OMN-22, Smooth Running Pumps ML22019A1352022-01-21021 January 2022 Proposed Alternative to Implement ASME Code Case OMN-24 ML21347A0102021-12-20020 December 2021 Proposed Alternative to Implement ASME Code Case OMN-26 ML21335A1062021-12-0707 December 2021 Proposed Alternative to ASME Code W, Section XI, Subsection Iwl Regarding Containment Post-Tensioning System Inservice Inspection Requirements ML21281A1412021-11-19019 November 2021 Authorization and Safety Evaluation for Alternative Reactor Pressure Vessel Inservice Inspection Intervals ML21155A2132021-08-26026 August 2021 Plant ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21006A0982021-03-15015 March 2021 Issuance of Amendment Nos. 421, 423, and 422 Revision of Licensing Basis for High Energy Line Breaks Outside of Containment (EPID L-2019-LLA-0184) (Public Version) ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20335A0012021-01-26026 January 2021 Issuance of Amendment Nos. 420, 422, and 421 Measurement Uncertainty Recapture Power Uprate ML20303A0242020-12-0909 December 2020 Issuance of Amendments 419, 421, 420 TSTF-272, Refueling Boron Concentration Clarification ML20296A2812020-11-25025 November 2020 Issuance of Amendment Nos. 418, 420 and 419 TSTF-421, Revision to RCP Flywheel Inspection Program ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20055F5712020-02-26026 February 2020 Proposed Alternative Request 19-ON-001 to Use Modified American Society of Mechanical Engineer'S Boiler and Pressure Vessel Code Case N-853 ML20042D7142020-02-13013 February 2020 Relief Request 19-ON-002 for Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in ASME Code Case N-770-2 ML19260E0842019-10-31031 October 2019 Issuance of Amendments 415, 417, and 416, Regarding the Updated Final Safety Analysis Report Description of Tornado Mitigation ML19056A0862019-09-30030 September 2019 Issuance of Amendments Nos. 414, 416 and 415 Regarding the Physical Security Plan ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19183A3172019-07-17017 July 2019 Issuance of Amendments Regarding the Updated Final Safety Analysis Report Section for Fission Gas Gap Release Rates ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML18311A1342018-12-17017 December 2018 Non Proprietary - Issuance of Amendments Regarding the Updated Final Safety Analysis Report Section for the Standby Shutdown Facility ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18040A1942018-04-12012 April 2018 Issuance of Amendments Regarding the Technical Specifications for Control Room Habitability (CAC Nos. MF9555, MF9556, and MF9557; EPID L-2017-LLA-0219) ML18051B2572018-02-28028 February 2018 Safety Evaluation for Alternative to Codes and Standards Requirements Associated with Bronze Tape Wrapped Emergency Power Cables (CAC Nos. MF7365, MF7366, and MF7367; EPID L-2016-LLR-0001) ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML17335A0252017-12-0505 December 2017 Correction to Safety Evaluation for Amendment Nos. 406, 408, and 407 (CAC Nos. MF7417, MF7418, and MF7419; EPID L-2016-LLA-0002) ML17124A6082017-11-20020 November 2017 Issuance of Amendments Regarding the Technical Specifications for Electrical Power Systems (CAC Nos. MF7417, MF7418, and MF7419; EPID L-2016-LLA-0002) ML17202U7912017-08-30030 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17167A2652017-07-12012 July 2017 Issuance of Amendments Regarding the Technical Specifications for Dry Spent Fuel Storage Cask Loading and Unloading (CAC Nos. MF8161, MF8162, and MF8163) ML17103A5092017-05-11011 May 2017 Issuance of Amendments Allowing the Use of the Copernic Fuel Performance Code ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16197A0112016-07-22022 July 2016 Relief Request Nos. 15-ON-002 and 15-ON-003, Fourth 10-Year Inservice Inspection Interval 2023-09-25
[Table view] |
Text
August 12, 2003 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation P.O. Box 1439 Seneca, SC 29679
SUBJECT:
RELIEF REQUEST ASSOCIATED WITH PUMP GENERIC RELIEF REQUEST NUMBER ON-GRP-01 FOR OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 (TAC NOS. MB6602, MB6603 AND MB6604)
Dear Mr. Jones:
By letter dated October 23, 2002, you submitted two requests for relief, ON-GRP-01 and ON-GRP-02, for Oconee Nuclear Station, Units 1, 2 and 3. They request relief from the American Society of Mechanical Engineers Code for the Operation and Maintenance of Nuclear Power Plants (OM Code). In your letter dated June 24, 2003, you withdrew Relief Request ON-GRP-02 and resubmitted Relief Request ON-GRP-01.
The NRC staff concludes that your proposed alternative to the OM Code requirements in Table ISTB 5.2.1-1 provides an acceptable level of quality and safety, and is authorized for use at the Oconee Nuclear Station, Units 1, 2 and 3, pursuant to Title 10 Code of Federal Regulations (10 CFR) Section 50.55a(a)(3)(i). The alternative is authorized for the fourth 10-year interval inservice testing program. Enclosed is the NRC staffs Safety Evaluation.
Sincerely,
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287
Enclosure:
As stated cc w/encl: See next page
ML032240520 OFFICE PDII-1/PM PDII-1/LA OGC PDII-1/SC NAME LOlshan CHawes SCole (NLO) JNakoski DATE 7/22/2003 7/22/2003 8/5/2003 8/11/2003 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO RELIEF REQUEST NO. ON-GRP-01 DUKE ENERGY CORPORATION OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DOCKET NUMBERS 50-269, 50-270 AND 50-287
1.0 INTRODUCTION
In its letter dated October 23, 2002, Duke Energy Corporation (the licensee) submitted two requests for relief for Oconee Nuclear Station (ONS), Units 1, 2, and 3. These two requests, ON-GRP-01 and ON-GRP-2, request relief from the requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code). In its letter dated June 24, 2003, the licensee withdrew Relief Request ON-GRP-02 and resubmitted Relief Request ON-GRP-01.
2.0 REGULATORY EVALUATION
The Code of Federal Regulations (10 CFR) Section 50.55a, requires that inservice testing (IST) of certain ASME Code Class 1, 2 and 3 pumps and valves be performed at 120-month (10-year) IST program intervals in accordance with the ASME OM Code and applicable addenda, except where alternatives have been authorized or relief has been requested by the licensee and granted by the Commission pursuant to paragraphs (a)(3)(i), (a)(3)(ii),or (f)(6)(i) of 10 CFR 50.55a. In accordance with 10 CFR 50.55a(f)(4)(ii), licensees are required to comply with the requirements of the latest edition and addenda of the ASME Code incorporated by reference in the regulations 12 months prior to the start of each 120-month IST program interval. In proposing alternatives or requesting relief, the licensee must demonstrate that:
(1) the proposed alternatives provide an acceptable level of quality and safety; (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety; or (3) conformance is impractical for the facility. Section 50.55a authorizes the Commission to approve alternatives and to grant relief from ASME Code requirements upon making necessary findings. NRC guidance contained in Generic Letter (GL) 89-04, Guidance on Developing Acceptable Inservice Testing Programs, provides alternatives to Code requirements that are acceptable. Further guidance is given in GL 89-04, Supplement 1, and NUREG-1482, Guidance for Inservice Testing at Nuclear Power Plants.
By letter dated October 23, 2002, the licensee proposed an alternative to the requirements of the ASME OM Code for fourth 10-year IST interval of ONS. The ONS fourth 10-year IST interval for all 3 units commenced July 1, 2002. The program was developed in accordance with the 1995 Edition, up to and including the 1996 Addenda to the ASME OM Code.
3.0 TECHNICAL EVALUATION
3.1 Code Requirements The licensee requested relief from the alert and required action range requirements of Table ISTB 5.2.1-1 for pumps that are considered smooth-running. Table ISTB 5.2.1-1 states that, if during an inservice test, a bearing vibration measurement exceeds 2.5 times the reference value previously established as required by paragraph ISTB 4.3, the pump is considered in the alert range. The frequency of testing is then doubled in accordance with paragraph ISTB 6.2 until the condition is corrected and the vibration level returns below the alert range. Pumps whose vibration is recorded to be six times the reference value are considered in the required action range and must be declared inoperable until the cause of the deviation has been determined and the condition is corrected, or an analysis of the pump is performed and new reference values are established in accordance with paragraph ISTB 4.6.
3.2 Licensees Basis for Requesting Relief The repeatability of pump vibration readings at ONS is in the range of 0.05 inches per second (ips) due to hydraulic flow noise in this amplitude range and the repeatability of the vibration instruments. When vibration velocities are less than 0.05 ips, changes have been shown to be insignificant.
At vibration velocities less than 0.05 ips, flow noise and instrument repeatability can significantly affect reference values. Candidates for smooth-running status will be analyzed per ISTB paragraph 4.3 to verify that use of this relief request will not prevent the detection of significant pump degradation.
For displacement reference values less than 0.5 mils, it is noted that Section XI of the ASME Boiler and Pressure Vessel Code (in effect for the third interval IST Program) set the alert range at greater than 1.0 mil and the required action range at greater than 1.5 mil. This implies a minimum reference value of 0.5 mils, which is equivalent to 0.047 ips for 1800 revolutions-per-minute (rpm) pumps and 0.094 ips for 3600 rpm pumps, is required. The effective reference values proposed for smooth-running pumps are roughly equal to the implied Section XI reference values for 1800 rpm pumps and more conservative than the implied reference values for 3600 rpm pumps. Without authorization of this alternative, the alert ranges for some smooth-running pumps will be reduced by a factor of 10.
The ONS Predictive Maintenance (PdM) program is part of the Preventive Maintenance (PM) program. The PM program was developed using industry guidelines as well as factoring in ONS site-specific experience and regulatory requirements. The PM program and PdM activities are controlled by plant procedures. Each of these pumps has regularly scheduled PM and PdM activities performed on that pump as described in the model work orders. The performance of the system associated with each of these pumps is monitored and compared to performance criteria under the ONS maintenance rule program. This ensures the continued effectiveness of the PM program to minimize component failures and maintain or improve system performance (balance availability and reliability). The ONS PdM program uses vibration analysis, lubricant analysis, and, as appropriate, infrared thermographic analysis to predict the need for maintenance so that equipment can be reworked prior to failure. The components included in this program include those considered important to safe and reliable plant operation, including
all the pumps in the IST program. The intervals for monitoring are based on the manufacturers recommendations, maintenance history, cost effectiveness, and experience. Although the monitoring, analysis, database, and software used in the PdM program do not fall under the ONS quality program, the PdM program still provides valuable information for assuring the operational readiness of smooth-running pumps.
The vibration analysis program monitors the vibration of rotating machinery. In addition to the vibration at pump bearings, the vibration of the driver (turbine or motor) bearings is also collected and trended. Analyzed parameters and methods include vibration velocity, bearing acceleration, bearing high frequency detection, and spectral analysis.
The lubricant analysis program samples lubricants and analyzes them to identify degradation or negative trends. Capabilities include wear debris, lubrication cleanliness, and limited chemical composition analysis.
In both the vibration monitoring and lubricant analysis programs, recently acquired data is compared with previous data to detect any indicated degradation in equipment condition. If degradation indicates the reliability of operating equipment may be negatively affected, or if acceptance criteria are no longer being met, appropriate corrective action is taken. Corrective action may include: continued trending of the degraded condition, if the condition is not considered to be immediately threatening to the equipment and can be corrected during a time window convenient to plant operation; additional testing or monitoring to confirm the suspected degraded condition; inspection and repair of the equipment as necessary; changes to preventive maintenance procedures or schedules; or design changes.
ONS expends considerable resources on preventive and predictive maintenance. One result of these efforts is that pumps run very smoothly. To continue to impose Code-mandated alert and required action values on smooth-running pumps unnecessarily penalizes ONS for achieving this high level of performance.
3.3 Licensees Proposed Alternative to Code Testing Requirements Vibration parameters that have reference values less than or equal to 0.05 ips may be considered smooth-running. The alert and required action values for these parameters will be determined as if their reference value is 0.05 ips; that is, the alert range will be greater than 0.125 ips to 0.3 ips, and the required action range will be greater than 0.3 ips.
In addition to the Code-mandated parameter monitoring (developed head, flow, overall vibration, etc), additional pump performance parameters are monitored under the predictive maintenance program. This program includes the following:
Spectrum band monitoring Bearing acceleration monitoring (on ball and roller bearings only)
Bearing oil analysis (for oil lubricated bearings)
If any parameters are outside normally expected ranges, an evaluation will be performed and appropriate corrective actions will be taken.
Before being treated as smooth-running under this relief request, each candidate pump parameter will be reviewed to verify that testing performed under the provisions of this relief request will not prevent the detection of significant pump degradation.
3.4 Evaluation The ASME OM Code, ISTB 4.7.4 requires that vibration of safety-related pumps be measured at specific locations on the pump. For centrifugal pumps, the measurements are taken in a plane approximately perpendicular to the rotating shaft in two orthogonal directions on each accessible pump-bearing housing. For vertical line shaft pumps, the vibration measurements are taken on the upper motor-bearing housing in three orthogonal directions, including the axial direction. The measurement is also taken in the axial direction on each accessible pump thrust-bearing housing. These measurements are to be compared with the Code vibration-acceptance criteria to determine if the measured values are acceptable.
Table ISTB 5.2.1-1 of the ASME OM Code states that, if during an inservice test, a bearing vibration measurement exceeds 2.5 times the reference value previously established as required by paragraph ISTB 4.3, the pump is considered in the alert range. The frequency is then doubled in accordance with paragraph ISTB 6.2 until the condition is corrected and the vibration level returns below the alert range. Pumps whose vibration exceeds six times the reference value are considered in the required action range and must be declared inoperable until the cause of the deviation has been determined and the condition is corrected, or an analysis of the pump is performed and new reference values are established in accordance with paragraph ISTB 4.6. The vibration reference values are required by paragraph ISTB 4.3 to be established when the pump is in good condition.
For pumps whose absolute magnitude of vibration is an order of magnitude below the absolute vibration limits in Table ISTB 5.2.1-1, a relatively small increase in vibration magnitude may cause the pump to enter the alert or required action range. These instances may be attributed to variation in flow, instrument accuracy, or other noise sources that would not be associated with degradation of the pump. Pumps that operate in this region are typically referred to as smooth-running. Based on a small acceptable range, a smooth-running pump could be subject to unnecessary corrective action.
The ASME OM Code has tried numerous times to develop a Code change to establish test requirements for a class of pumps defined as smooth-running. These requirements focused on selecting a minimum vibration to be specified in the proposed Code change that would be assigned as the minimum reference values. The Code committees have not reached a consensus on the appropriate minimum reference value and on whether this approach would be adequate to identify degradation in safety pumps during testing. In addition, the Code committees have had significant discussion on what other types of pump-monitoring activities should be included as compensatory requirements for testing of smooth-running pumps.
At least one plant has previously been authorized to use the smooth-running pump methodology as described above. The minimum reference value was 0.1 ips. However, a pump bearing at this plant experienced significant degradation even though the vibration was below the minimum reference value in the proposed alternative. Had the current Code requirements been in place, the bearing vibration level for this pump would have exceeded the alert range. The degradation was discovered during vibration monitoring for a predictive
maintenance program. After this finding, it was clear to the NRC staff that a simple minimum reference value method alone would not be sufficient to determine pump degradation.
The licensees proposal combines the minimum reference value method with a commitment to perform additional pump monitoring. The licensee will assign a vibration reference value of 0.05 ips to any pump bearing vibration direction where, in the course of determining its reference value, the measured value is below 0.05 ips. Therefore, the acceptable range as defined in Table ISTB 5.2.1-1 will be less than or equal to 0.125 ips, the alert range will be greater than 0.125 ips to 0.3 ips, and the required action range will be greater than 0.3 ips for pumps that are considered smooth-running. The licensee has a PdM program as part of the PM program. The PM program was developed using industry guidelines as well as factoring in site-specific experience and regulatory requirements. The PM program and PdM activities are controlled by plant procedures. Each pump has regularly scheduled PM and PdM activities performed as described in the PM model work orders. The performance of the system associated with the pump is monitored and compared to performance criteria under the maintenance rule program. This ensures the continued effectiveness of the PM program to minimize component failures and maintain or improve system performance.
The PdM program routinely uses vibration analysis, lubricant analysis, and, as appropriate, infrared thermographic analysis. The components included in this program include those considered important to safe and reliable plant operation, including all the pumps in the IST program. In both the vibration monitoring and lubricant analysis programs, recently acquired data is compared with previous data to detect any indicated degradation of equipment condition. If any of the parameters are outside normally expected ranges, the condition is evaluated and appropriate corrective actions are taken.
The vibration-analysis program monitors the vibration of rotating machinery. In addition to the vibration at pump bearings, the vibration of the driver (turbine or motor) bearings is also collected and trended. Analyzed parameters and methods include vibration velocity, bearing acceleration, bearing high frequency detection, and spectral analysis as appropriate.
The lubricant analysis program samples lubricants and analyzes them to identify degradation or negative trends. Capabilities include wear debris, lubrication cleanliness, and limited chemical composition analysis.
As described above, the NRC staff finds that the alert and required action limits specified in the relief request sufficiently address the previously undetected acute pump problems. The 0.05 ips minimum reference value is consistent with previous NRC staff safety evaluations of similar issues. The NRC staff acknowledges that the objective of the licensees predictive maintenance program is to detect problems involving the mechanical condition, even well in advance of when the pump reaches its overall vibration alert limit. Therefore, the licensees proposed alternative will provide an acceptable level of quality and safety.
3.5 Conclusion Based on a review of the information provided by the licensee, the NRC staff concludes that the licensees proposed alternative with respect to pump vibration alert and required action values for smooth-running pumps is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the remainder of
the fourth 10-year interval, based on the alternative providing an acceptable level of quality and safety.
Principal Contributor: K. Poertner Date: August 12, 2003
Oconee Nuclear Station cc:
Ms. Lisa F. Vaughn Mr. L. E. Nicholson Legal Department (ECIIX) Compliance Manager Duke Energy Corporation Duke Energy Corporation 422 South Church Street Oconee Nuclear Site Charlotte, North Carolina 28201-1006 7800 Rochester Highway Seneca, South Carolina 29672 Anne W. Cottingham, Esquire Winston and Strawn Ms. Karen E. Long 1400 L Street, NW Assistant Attorney General Washington, DC 20005 North Carolina Department of Justice Manager, LIS P. O. Box 629 NUS Corporation Raleigh, North Carolina 27602 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Senior Resident Inspector Licensing U. S. Nuclear Regulatory Duke Energy Corporation Commission 526 South Church Street 7812B Rochester Highway Charlotte, North Carolina 28201-1006 Seneca, South Carolina 29672 Mr. Richard M. Fry, Director Mr. Henry Porter, Director Division of Radiation Protection Division of Radioactive Waste Management North Carolina Department of Bureau of Land and Waste Management Environment, Health, and Department of Health and Environmental Natural Resources Control 3825 Barrett Drive 2600 Bull Street Raleigh, North Carolina 27609-7721 Columbia, South Carolina 29201-1708 Mr. Peter R. Harden, IV Mr. Michael A. Schoppman VP-Customer Relations and Sales Framatome ANP Westinghouse Electric Company 1911 North Ft. Myer Drive 6000 Fairview Road Suite 705 12th Floor Rosslyn, VA 22209 Charlotte, North Carolina 28210