Letter Sequence Other |
---|
|
|
MONTHYEARML1016604732010-06-0909 June 2010 Relief Request No. 10-ON-001, Alternative to Volumetric Examination Requirements for the Residual Heat Removal (RHR) Heat Exchanger Class 2 Nozzle-to-Shell Welds Project stage: Request ML11144A0782011-03-0202 March 2011 Relief Request No. 10-ON-001, Response to Request for Additional Information Project stage: Response to RAI ML11143A0592011-06-21021 June 2011 Relief Request 10-ON-001 for Reactor Vessel Core Flood Nozzle Weld Examinations Project stage: Other 2011-03-02
[Table View] |
|
---|
Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] Category:Safety Evaluation
MONTHYEARML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22349A1452022-12-19019 December 2022 Non-Proprietary Safety Evaluation Related to the SLRA of Oconee Nuclear Station, Units 1, 2, and 3 ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22096A1872022-07-15015 July 2022 Issuance of Amendment Nos. 424, 426, and 425 Revise TS 3.7.7, Low Pressure Service Water (LPSW) System to Extend the Completion Time for One Required Inoperable LPSW Pump ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22068A0252022-03-15015 March 2022 Code Case OMN-28 - Alternative Valve Position Verification Approach to Satisfy ISTC-3700 for Valves Not Susceptible to Stem-Disk Separation ML22046A2802022-02-23023 February 2022 Relief from ASME Code Paragraph ISTP-3540(b) Related to High Pressure Injection Pumps Vibration Measurements ML22046A2452022-02-18018 February 2022 Regarding Alternative to Implement Code Case OMN-22, Smooth Running Pumps ML22019A1352022-01-21021 January 2022 Proposed Alternative to Implement ASME Code Case OMN-24 ML21347A0102021-12-20020 December 2021 Proposed Alternative to Implement ASME Code Case OMN-26 ML21335A1062021-12-0707 December 2021 Proposed Alternative to ASME Code W, Section XI, Subsection Iwl Regarding Containment Post-Tensioning System Inservice Inspection Requirements ML21281A1412021-11-19019 November 2021 Authorization and Safety Evaluation for Alternative Reactor Pressure Vessel Inservice Inspection Intervals ML21155A2132021-08-26026 August 2021 Plant ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21006A0982021-03-15015 March 2021 Issuance of Amendment Nos. 421, 423, and 422 Revision of Licensing Basis for High Energy Line Breaks Outside of Containment (EPID L-2019-LLA-0184) (Public Version) ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20335A0012021-01-26026 January 2021 Issuance of Amendment Nos. 420, 422, and 421 Measurement Uncertainty Recapture Power Uprate ML20303A0242020-12-0909 December 2020 Issuance of Amendments 419, 421, 420 TSTF-272, Refueling Boron Concentration Clarification ML20296A2812020-11-25025 November 2020 Issuance of Amendment Nos. 418, 420 and 419 TSTF-421, Revision to RCP Flywheel Inspection Program ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20055F5712020-02-26026 February 2020 Proposed Alternative Request 19-ON-001 to Use Modified American Society of Mechanical Engineer'S Boiler and Pressure Vessel Code Case N-853 ML20042D7142020-02-13013 February 2020 Relief Request 19-ON-002 for Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in ASME Code Case N-770-2 ML19260E0842019-10-31031 October 2019 Issuance of Amendments 415, 417, and 416, Regarding the Updated Final Safety Analysis Report Description of Tornado Mitigation ML19056A0862019-09-30030 September 2019 Issuance of Amendments Nos. 414, 416 and 415 Regarding the Physical Security Plan ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19183A3172019-07-17017 July 2019 Issuance of Amendments Regarding the Updated Final Safety Analysis Report Section for Fission Gas Gap Release Rates ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML18311A1342018-12-17017 December 2018 Non Proprietary - Issuance of Amendments Regarding the Updated Final Safety Analysis Report Section for the Standby Shutdown Facility ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18040A1942018-04-12012 April 2018 Issuance of Amendments Regarding the Technical Specifications for Control Room Habitability (CAC Nos. MF9555, MF9556, and MF9557; EPID L-2017-LLA-0219) ML18051B2572018-02-28028 February 2018 Safety Evaluation for Alternative to Codes and Standards Requirements Associated with Bronze Tape Wrapped Emergency Power Cables (CAC Nos. MF7365, MF7366, and MF7367; EPID L-2016-LLR-0001) ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML17335A0252017-12-0505 December 2017 Correction to Safety Evaluation for Amendment Nos. 406, 408, and 407 (CAC Nos. MF7417, MF7418, and MF7419; EPID L-2016-LLA-0002) ML17124A6082017-11-20020 November 2017 Issuance of Amendments Regarding the Technical Specifications for Electrical Power Systems (CAC Nos. MF7417, MF7418, and MF7419; EPID L-2016-LLA-0002) ML17202U7912017-08-30030 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17167A2652017-07-12012 July 2017 Issuance of Amendments Regarding the Technical Specifications for Dry Spent Fuel Storage Cask Loading and Unloading (CAC Nos. MF8161, MF8162, and MF8163) ML17103A5092017-05-11011 May 2017 Issuance of Amendments Allowing the Use of the Copernic Fuel Performance Code ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16197A0112016-07-22022 July 2016 Relief Request Nos. 15-ON-002 and 15-ON-003, Fourth 10-Year Inservice Inspection Interval 2023-09-25
[Table view] Category:Code Relief or Alternative
MONTHYEARML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22046A2802022-02-23023 February 2022 Relief from ASME Code Paragraph ISTP-3540(b) Related to High Pressure Injection Pumps Vibration Measurements ML22046A2452022-02-18018 February 2022 Regarding Alternative to Implement Code Case OMN-22, Smooth Running Pumps ML22028A3652022-02-0707 February 2022 Authorization and Safety Evaluation for Alternative Acceptance Criteria for Code Case N-853 ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RA-20-0036, Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping2020-03-0202 March 2020 Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping ML20042D7142020-02-13013 February 2020 Relief Request 19-ON-002 for Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in ASME Code Case N-770-2 RA-19-0028, Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress2019-03-21021 March 2019 Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 22018-11-12012 November 2018 Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML16118A2302016-04-30030 April 2016 Relief Request 14-ON-022 Alternative Requirements for Class 2 Residual Heat Removal Heat Exchange Welds ML16053A5012016-03-0101 March 2016 Relief Request ON-GRR-01 Grace Period for OM Code Frequencies (CAC Nos. MF7130, MF7131, and MF7132) ML16004A1812016-01-0707 January 2016 Relief Request 14-ON-003 Alternative Requirements for Class 1 Category B-J Piping Welds ML16004A2622016-01-0707 January 2016 Relief Request 15-ON-004: Limited Visual Examinations of the Reactor Pressure Vessel Support Skirt for the Fourth 10-Year Inservice Inspection Interval Program ML15349A4532015-12-29029 December 2015 Relief Request 15-ON-001 Repair of Low Pressure Service Water System Piping ONS-2015-087, Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-003, Limited Volume Inspections from 3EOC27 Outage2015-07-15015 July 2015 Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-003, Limited Volume Inspections from 3EOC27 Outage ONS-2015-088, Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-004, Limited Visual Examinations from 1 EOC27, 2EOC26 and 3EOC27 Outages2015-07-15015 July 2015 Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-004, Limited Visual Examinations from 1 EOC27, 2EOC26 and 3EOC27 Outages ML13365A0232014-01-17017 January 2014 Relief from the Requirements of the ASME Code for Fourth 10-Year Interval Inspection Program Request for Relief ML13066A1002013-02-27027 February 2013 End of Cycle (EOC) 27 Refueling Outage Steam Generator Inservice Inspection Report ML13045A2902013-02-15015 February 2013 Relief from the Requirements of the ASME OM Code ML13038A1522013-01-31031 January 2013 Fourth Ten-Year Inservice Inspection Plan, Request for Relief No. 12-ON-001 ML13038A1502013-01-31031 January 2013 Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 12-ON-002 ML12173A3122012-06-18018 June 2012 Approval Request for the Fifth Ten-Year Inservice Test Program Interval Pump Specific Code Relief Request No. ON-SRP-HPI-03 ML12030A0892012-01-23023 January 2012 Duke Energy Carolinas - Relief Request Serial #09-GO-001 Request for NRC Clarification ML11143A0592011-06-21021 June 2011 Relief Request 10-ON-001 for Reactor Vessel Core Flood Nozzle Weld Examinations ML1106605882011-03-28028 March 2011 Relief Request (RR) Proposed Alternative for Certain Vibration Measurement Requirements RR (ON-SRP-HPI-03)) (TAC Nos. Me 3840, ME3841, ME3842, ME5790, ME5791, ME5792, ME5793, ME5794 and ME5795) ML1016604732010-06-0909 June 2010 Relief Request No. 10-ON-001, Alternative to Volumetric Examination Requirements for the Residual Heat Removal (RHR) Heat Exchanger Class 2 Nozzle-to-Shell Welds ML1008802862010-03-31031 March 2010 Relief Request 09-ON-003 for the Use of Full Structural Weld Overlay & Alternative Examination Techniques, for the Letdown Line, Reactor Vessel Core Flood & Reactor Coolant Pump Inlet & Outlet Nozzle Butt Welds. ML1006006982010-03-0303 March 2010 Relief, Request 09 ON-005 for Reactor Vessel Core Flood Nozzle Weld Examinations (ME1846, ME1847, and ME1848) ML0927403122009-09-24024 September 2009 Relief Request from Immediate ASME Code Flaw Repair of Standby Shutdown Facility Auxiliary Service Water Piping ML0921500282009-07-28028 July 2009 Fourth Ten Year Inservice Inspection Interval Request for Relief No. 09-ON-005 ML0914702652009-05-20020 May 2009 Request for Extension of Duke Response Time to Referenced Letter ML0908307262009-03-20020 March 2009 Fourth Ten Year Inservice Inspection Interval, Request for Relief No. 09-ON-003 ML0833600322008-11-20020 November 2008 Summary Ultrasonic Examination Results of Completed ML0810200532008-04-0707 April 2008 Relief Request No. 08-ON-003, from Immediate ASME Code Flaw Repair of Low Pressure Service Water Piping ML0734600272008-01-17017 January 2008 Relief Request to Use Preemptive Weld Overlay and Alternative Examination Techniques on Decay Heat Removal Line to Hotleg Nozzle Welds ML0715605102007-05-29029 May 2007 Fourth Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-007, Revision 1 ML0712300902007-04-27027 April 2007 Part 21 Interim Report, Dresser Investigation File No. 2007-02, Interim Reporting of a Potential Defect Involving Power Actuated Pressure Relief Valves Supplied to Calvert Cliffs, Fort Calhoun and Oconee Plants ML0626202342006-09-11011 September 2006 Relief Request 06-ON-004 Request for Additional Information ML0622902642006-08-0909 August 2006 Response to Request for Additional Information Request for Relief No. 05-ON-004 ML0619400162006-07-0606 July 2006 Replacement of Steam Generators Request for Relief No. 04-ON-007, Rev. 1 ML0609302482006-05-0404 May 2006 Relief Request 05-ON-003 ML0608302912006-04-17017 April 2006 Relief, Volumetric Examination of Essentially 100 Percent of the Volume as Required by the ASME, Boiler and Pressure Vessel Code, Section XI, for Class 1 and 2 Welds ML0608301052006-04-14014 April 2006 SE MC5483 and MC5483, Relief Request RR-04-ON-013 ML0536302312006-03-13013 March 2006 Relief Request MC8852, Repair of Steam Generator Tubes 2023-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 21, 2011 Mr. Preston Gillespie Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 SUB..IECT: OCONEE NUCLEAR STATION, UNITS 1,2, AND 3, RELIEF REQUEST 10-0N-001 FOR REACTOR VESSEL CORE FLOOD NOZZLE WELD EXAMINATIONS (TAC NOS. ME4333, ME4334, ME4335, ME4336, ME4337, AND ME4338)
Dear Mr. Gillespie:
By letter dated June 9, 2010, as supplemented March 2, 2011, Duke Energy Carolinas, LLC (Duke, the licensee), submitted Relief Request (RR) 10-0N-001 for the fourth 10-year interval of Oconee Nuclear Station, Units 1,2, and 3 (Oconee 1/2/3) related to the Inservice Inspection (lSI)
Program pertaining to alternatives to the volumetric examination requirements of the American Society of Mechanical Engineers. Boiler and Pressure Vessel Code (ASME Code).
Section XI, for the specified ASME Code Class 2, Examination Category C-B, Item No. C2.32 decay heat cooler nozzle-to-shell welds at Oconee 1/2/3 Based on the information provided by the licensee, the Nuclear Regulatory Commission (NRC) staff has determined that the licensees proposed alternatives will provide an acceptable level of quality and safety for the residual heat removal decay heat coolers at Oconee 1/2/3. Therefore, pursuant to Title 10 of the Code of Federal Regulations, Part 50, Section 50.55a(a)(3)(ii), the NRC authorizes the lSI Program alternatives proposed in RR 10-0N-001 for the fourth 10-year lSI intervals of Oconee 1/2/3, which are scheduled to end on July 14,2014, for Oconee 1/2/3.
Enclosed is the NRC's Safety Evaluation.
P. Gillespie -2 If you have any questions concerning this action, please contact John Stang of my staff at 301-415-1345.
Sincerely, Cc~ ______
Gloria Kulesa, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR APPROVAL OF RELIEF 10-0N-001 REGARDING ALTERNATIVES TO VOLUMETRIC EXAMINATION REQUIREMENTS OCONEE NUCLEAR STATION, UNITS 1,2, AND 3 DUKE ENERGY CAROLINAS, LLC DOCKET NOS. 50269, 50-270, AND 50-287
1.0 INTRODUCTION
By letter dated June 9, 2010 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML101660473), as supplemented March 2, 2011 (ADAMS Accession No. ML11144A078), Duke Energy Carolinas, LLC (Duke, the licensee), submitted Relief Request (RR) 10-0N-001 for the fourth 10-year Interval Inservice Inspection (lSI) Program at Oconee Nuclear Station, Units 1,2, and 3 (Oconee 1/2/3). RR 10-0N-001 proposed an alternative to the volumetric examination requirements of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code),Section XI, for the specified ASME Code Class 2, Examination Category C-B, Item No. C2.32 for decay heat cooler nozzle-to-shell welds at Oconee 1/2/3. The U. S. Nuclear Regulatory Commission (NRC) staff reviewed the licensee's request pursuant to the provisions of Title 10 of the Code of Federal Regulations (10 CFR),
Part 50, paragraph 50.55a(a)(3)(i).
NRC staff has reviewed the licensee's proposed alternative pursuant to1 0 CFR 50.55a(a)(3)(ii) on the basis that compliance to the Code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY REQUIREMENTS lSI of ASME Code Class 1, 2, and 3 components is performed in accordance with Section XI of the ASME Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific relief has been granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i). Paragraph 50.55a(a)(3) states that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if: (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Enclosure
- 2 Pursuant to 10 CFR SO.SSa(g)(4), ASME Code Class 1,2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulation requires that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR SO.SSa(b) twelve months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The applicable Code of record for the fourth 10-year interval lSI Program at Oconee 1/213 is the 1998 Edition of the ASME Code,Section XI through the 2000 Addenda. The fourth 10-year interval lSI Program at Oconee Unit 1 began on January 1,2004, and is scheduled to end on July 14, 2014. The fourth 10-year interval lSI program at Oconee Unit 2 began on September 9,2004, and is scheduled to end on July 14, 2014. The fourth 10-year interval lSI program at Oconee Unit 3 began on January 2, 200S, and is scheduled to end on July 14, 2014.
The information provided by the licensee in support of the relief request has been evaluated by the NRC staff and the bases for disposition are documented below.
3.0 TECHNICAL EVALUATION
The licensee's fourth 10-year interval lSI Program request (RR 10-ON-001) addresses the ASME Code Class 2, Examination Category C-B, Item No. C2.32 components at Oconee 1/2/3 listed below.
Low Pressure Injection (LPI) Residual Heat Removal (RHR) Heat Exchangers (Decay Heat Coolers) Tube Side Inlet and Outlet Nozzle-to-Shell Welds for:
- Oconee 1 Decay Heat Cooler 1A, Nozzles M and N
- Oconee 1 Decay Heat Cooler 1B, Nozzles M and N
- Oconee 2 Decay Heat Cooler 2A, Nozzles M and N
- Oconee 2 Decay Heat Cooler 2B, Nozzles M and N
- Oconee 3 Decay Heat Cooler 3A, Nozzles M and N
- Oconee 3 Decay Heat Cooler 3B, Nozzles M and N (12 decay heat cooler nozzle-to-shell welds in total).
Applicable ASME Code,Section XI Requirements The 1998 Edition through the 2000 Addenda of the ASME Code,Section XI, Table IWC-2S00-1, Examination Category C-B, Item No. C2.32 requires a volumetric examination for all RHR heat exchanger nozzle-to-shell welds for nozzles with a reinforcing plate in vessels greater than O.S inch nominal thickness, when the inside of the heat exchanger vessel is accessible. The required examination volume is specified in Figure IWC-2S00-4(c) of the ASME Code,Section XI.
- 3
Licensee's Proposed Alternative and Basis for Use
ASME Code,Section XI, Table IWC-2S00-1, Examination Category C-B, Item C2.32 requires a volumetric examination of the RHR heat exchanger nozzle-to-shell welds when the inside of the vessel is accessible.
The licensee plans to remove the channel cover from each of the RHR heat exchangers (decay heat coolers) to permit eddy current examination of the heat exchanger tubes during the fourth 1O-year lSI interval at Oconee 1/2/3. These activities will enable access to the interior of the heat exchangers. Accordingly, a volumetric examination of accessible nozzle-to-shell welds would be required in orderto satisfy the requirement of Table IWC-2S00-1, Examination Category C-B, Item No. C2.32.
The licensee stated that performing volumetric examinations of the subject decay heat cooler nozzle-to-shell welds is unnecessary because the proposed alternative provides an acceptable level of quality and safety. The proposed alternative will also eliminate all radiation dose associated with performing these volumetric examinations.
Pursuant to 10 CFR SO.SSa(a)(3)(i), the licensee proposed the following alternative in lieu of the volumetric examinations required by Table IWC-2S00-1, Examination Category C-B, Item No. C2.32 for the tube side inlet and outlet nozzle-to-shell welds for the RHR heat exchangers (decay heat coolers):
(1) Surface examinations shall be performed in accordance with Table IWC-2S00-1, Examination Category C-B, Item No. C2.31.
(2) A VT-2 visual examination shall be performed in accordance with Table IWC-2S00-1, Examination Category C-B, Item No. C2.33 during each inspection period while the heat exchanger vessel is undergoing the system leakage test.
(3) A VT-2 visual examination shall be performed on the RHR heat exchangers in accordance with Table IWC-2S00-1, Examination Category C-H, Item No. C7.1 0 during each inspection period while the heat exchanger vessel is undergoing the system leakage test.
The Westinghouse Owner's group (WOG) performed a study as part of the ASME approval process for ASME Code Case N-706, "Alternative Examination Requirements of Table IWB-2S00-1 and IWC-2S00-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers,Section XI, Division 1." This study, as documented in the WOG report Technical Basis for Revision of Inspection Requirements for Regenerative and Residual Heat Exchangers,"
August 2004, provided technical justification for eliminating the volumetric examination of RHR heat exchanger components. The decay heat coolers at Oconee 1/2/3 are typical of the heat exchangers described in the WOG report, with respect to fabrication, design, inspection requirements and geometric restrictions.
The WOG report also addressed flaw tolerance and risk assessment for these components.
Fracture evaluations were performed for the components using finite element models. It was concluded that the heat exchangers have a large flaw tolerance and that significant leakage
-4 would be expected long before any failure occurred. Fatigue crack growth was determined to be extremely slow even in the most highly stressed region. These heat exchangers do not have a severe duty cycle, and there are no known degradation mechanisms applicable to the tube side nozzle-to-shell welds. The licensee stated, volumetric examinations of the subject decay heat cooler nozzle-to-shell welds are not required to ensure their integrity.
A risk evaluation was performed using the accepted methodology applied for risk-informed lSI programs. This evaluation resulted in the following conclusions:
- Safety equipment required to respond to a potential event is unaffected.
- Potential for loss of pressure boundary integrity is negligible.
- No safety analysis margins are changed.
- Leakage before full break is expected, and there are no core damage consequences associated with leakage.
Based on the conclusions of the WOG report, the elimination of the volumetric examinations required by Table IWC-2500-1, Examination Category C-B, Item No. C2.32 is expected to result in no significant increase in risk. The WOG report indicated that there have been no through-wall leaks in these components or components of similar design reported in the industry.
The WOG report indicated that one plant (San Onofre, Unit 3) had experienced a small leak from the letdown line exiting the Class 1 regenerative heat exchanger; however, this was caused by excessive vibration on the piping line and is not an indication of a defect in the heat exchanger.
The licensee also stated that Oconee 1/2/3 Selected Licensee Commitment (SLC) 16.6.4 currently limits LPI system leakage to 2 gallons per hour (gph), and LPI system leakage is periodically monitored. Any system leakage through the tube side inlet and outlet nozzle-to-shell welds would likely be detected by operations personnel during plant rounds performed each week, which include the LPI decay heat cooler (RHR heat exchanger) rooms. Any identified leakage from these welds would be noted and entered into the site corrective action program.
NRC Staff's Evaluation The NRC staff reviewed the information provided by the licensee concerning RR 10-0N-001 for the fourth 10-year interval lSI Program at Oconee 1/213. RR 10-0N-001 proposes an alternative to the ASME Code, Section XI-required volumetric examinations for the Class 2 tube side inlet and outlet nozzle-to-shell welds for RHR Decay Heat Coolers 1A, 1B, 2A, 2B, 3A, and 3B. Each of the subject welds is a full penetration weld which joins the nozzle weld during system leakage tests when the inside of the heat exchanger vessel is inaccessible for volumetric examination. A separate fillet weld joins the reinforcing plate to the heat exchanger shell. This welded configuration is illustrated in Figure IWC-2500-4(c) of the ASME Code,Section XI.
According to the licensee, the channel covers will be removed from each of the subject RHR heat exchangers in order to permit eddy current examinations of the heat exchanger tubes. The removal of these channel covers will permit access to the interior of heat exchangers, which would enable the performance of the volumetric examinations of the subject nozzle-to-shell welds, as required by the ASME Code,Section XI, Examination Category C-B, Item No. C2.32. The NRC staff noted that volumetric examinations of these welds are required only when the inside of the heat exchangers are accessible.
- 5 The licensee stated that the nozzle-to-shell weld volumetric examinations required by the ASME Code,Section XI, Examination Category C-B, Item No. C2.32 are not necessary because the proposed alternative will provide an acceptable level of quality and safety. The licensee also stated that the proposed alternative will eliminate all personnel radiation dose associated with performing these volumetric examinations. The NRC staff finds with the licensee's statement that the elimination of the ASME Code, Section XI-required volumetric examinations for the subject RHR heat exchanger nozzle-to-shell welds would result in a reduction in personnel radiation dose, because the elimination of these examinations reduces the time spent in a high radiation environment.
The NRC staff reviewed the licensee's proposed alternative to the volumetric examinations required by Examination Category C-B, Item No. C2.32 to determine whether it will provide an acceptable level of quality and safety. The licensee's proposed alternative involves (1) performing surface examinations on the external surface of the subject welded joints, where the full penetration weld joins the nozzle to the reinforcing plate, including the separate fillet weld joining the heat exchanger shell to the reinforcing plate, as required by Examination Category C-B, Item No. C2.31; (2) performing VT-2 visual examinations of the joints by examining the "telltail hole" in the reinforcing plate for evidence of leakage while the heat exchanger vessel is undergoing the system leakage test, as required by the Examination Category C-B, Item No.
C2.33; and (3) performing VT-2 visual examinations of all pressure retaining components of the heat exchangers during system leakage tests, as required by Examination Category C-H, Item No.
C7.10.
The NRC staff noted that the licensee's proposed alternative, as stated in RR 10-0N-001 involves the fulfillment of the other ASME Code,Section XI requirements pertaining to the examination of this welded joint, and therefore does not constitute a specific alternative per se to the volumetric examination requirement specified under Examination Category C-B, Item No. C2.32. However, the NRC staff found that the licensee's description and referencing of a previous fracture and fatigue analysis performed by WOG for these heat exchangers may be used as part of an alternative basis for the elimination of volumetric examinations for the subject decay heat cooler nozzle-to-shell welds at Oconee 1/213. The analysis, as documented in WOG project MUHP 5093, Working Group Inservice Inspection Optimization Action 97-01 (Boiler Code Item BC03-338), "Technical Basis for Revision of Inspection Requirements for Regenerative and Residual Heat Exchangers," August 2004, was performed as part of the ASME Boiler and Pressure Vessel Standards Committee approval process for ASME Code Case N-706, "Alternative Examination Requirements of Table IWB-2500-1 and IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers,Section XI, Division 1." The WOG report provided technical justification for the elimination of the volumetric and surface examinations required by the ASME Code,Section XI, Table IWB-2500-1 for Class 1 regenerative heat exchangers and Table IWC-2500-1 for Class 2 RHR heat exchangers. The WOG report noted that these heat exchangers were designed and installed before the lSI requirements of the ASME Code,Section XI were required to be implemented by the industry. As a result, the design of these heat exchangers does not accommodate the successful performance of meaningful ultrasonic examinations. The small diameter of the vessels and nozzles of these heat exchangers make it difficult to perform ultrasonic examinations with meaningful results. The examinations are very time consuming and result in high dose rates to the personnel performing the examinations because the heat exchangers are located in high radiation fields. The subject decay heat cooler nozzle-to-shell welds at Oconee 1/213 are included in the scope of components addressed in the
- 6 WOG report. The decay heat coolers at Oconee 1/2/3 are typical of the RHR heat exchangers addressed in the WOG report with respect to materials, fabrication, design, inservice examination requirements, and geometric restrictions.
As stated by the licensee, the WOG report addressed flaw tolerance and risk assessment for these components. Flaw tolerance assessments were based on fracture and fatigue analyses for the RHR heat exchanger components using finite element methods. The WOG report concluded that the RHR heat exchangers have a large flaw tolerance and that significant leakage would be expected long before any failure occurred. Fatigue crack growth was determined to be extremely slow even in the most highly stressed region. The WOG report also determined that there are no active degradation mechanisms applicable to the tube side nozzle-to-shell welds for the RHR heat exchangers. The nozzle-to-shell welds are low alloy steel and therefore, not susceptible to stress corrosion cracking. Therefore, the WOG report concluded that volumetric examinations of the subject decay heat cooler nozzle-to-shell welds are not required in order to ensure their integrity.
The NRC staff finds with the licensee's determination that the findings of the WOG report, in conjunction with the performance of surface and visual examinations on the subject welds, as required by Examination Category C-8, Item Nos. C2.31 and C2.33, would provide an acceptable alternative basis for eliminating the nozzle-to-shell weld volumetric examinations required by Examination Category C-8, Item No. C2.32, provided that no prior findings of leakage or age-related degradation have been discovered in the subject components.
The reinforcing plate covers the heat exchanger shell in the vicinity of each nozzle and incorporates a "telltail hole" that allows for the performance of a VT-2 visual examination of a small area of the shell near the full penetration.
In the March 2, 2011, supplement, the licensee stated that VT -2 visual examinations performed on the RHR heat exchangers/decay heat coolers at Oconee 1/213 during the first, second, third, and fourth 10-year lSI intervals have not detected any evidence of leakage for the heat exchangers, including the nozzle-to-shell welds for which relief was requested. The licensee further stated that surface examinations performed on the nozzle M and N reinforcing plate-to-nozzle welds and reinforcing plate-to-shell welds for the decay heat coolers at Oconee 11213 during the first, second, third, and fourth 10-year lSI intervals have not detected any unacceptable indications. The licensee stated that the decay heat cooler nozzle-to-shell welds for which relief has been requested have not received any prior inservice volumetric examinations.
However, according to the licensee, prior volumetric examinations of the decay heat coolers' adjacent shell-to-head flange and shell-to-tubesheet flange welds at Oconee 1/2/3 during the first, second, third, and fourth 10-year lSI intervals have not detected any unacceptable indications.
The licensee stated that these other volumetric examinations of the decay heat cooler pressure boundary components provide reasonable assurance that the service conditions within the decay heat coolers have not resulted in any age-related degradation in the nozzle-to-shell welds for which relief was requested.
The NRC staff reviewed the licensee's March 2, 2011, supplement and determined that is acceptable because (1) no evidence of leakage has been detected as a result of VT-2 visual examinations performed during system leakage tests for the decay heat coolers at Oconee 1/2/3; (2) previous surface examinations of nozzle M and N reinforcing plate-to-nozzle welds and
-7 reinforcing plate-to-shell welds for the subject decay heat coolers (as required by Examination Category C-8, Item No. C2.31) have not detected any unacceptable indications; and (3) while the subject decay heat cooler nozzle-to-shell welds have not received any previous volumetric examinations, the absence of any evidence of service-induced degradation for any other decay heat cooler pressure-retaining components provides additional assurance that these specific welds have not and will not experience significant service-induced degradation during plant service.
8ased on the above evaluation, the NRC staff determined that the licensee's proposed alternative to the ASME Code,Section XI, Examination Category C-B, Item No. C2.32 requirements for volumetric examination of the subject decay heat cooler nozzle-to-shell welds at Oconee 1/2/3 will provide an acceptable level of quality and safety. The licensee's implementation of the Examination Category C-8, Item No. C2.31 surface examination and Item No. C2.33 VT-2 visual examination requirements, in conjunction with the analyses documented in the WOG report, provide assurance of continued structural integrity for the decay heat cooler nozzle-to-shell welds at Oconee 1/213.
4.0 CONCLUSION
Based on the above evaluation of Request 10-ON-001, the NRC staff concludes that the licensee's proposed alternative to the volumetric examination requirements of the ASME Code,Section XI, Examination Category C-8, Item No. C2.32 will provide an acceptable level of quality and safety for the RHR decay heat coolers at Oconee 1/2/3. Therefore, RR 10-0N-001 is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the fourth 10-year interval lSI Program at Oconee 1/2/3. All other requirements of the ASME Code,Section XI, for which relief has not been specifically requested and approved, remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: C. Sydnor Date: June 21,2011
ML11143A059 *Yia email dated 4/13/11 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/CVIB/BC NRR/LPL2-1/BC NRR/LPL2-1/PM NAME JStang MO'Brien MMitcheli* GKulesa JStang DATE 6/20/11 6/20/11 04/13/2011 6120111 6/21/11