March 10, 2023 Steven M. Snider Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
Dear Steven Snider:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Oconee Nuclear Station during the weeks of May 1, and May 15, 2023. The inspection team will be led by Donna Jackson, a Senior Project Engineer, from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure 71152, Problem Identification and Resolution, issued December 14, 2021.
The biennial PI&R inspection and assessment of the licensees corrective action program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
On March 9, 2023, Donna Jackson confirmed with Laura Boyce of your staff, the two-week onsite inspection.
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than April 10, 2023. Contact Donna Jackson with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Donna Jackson will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
S. Snider 2
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Donna Jackson at (404) 997-4892.
Sincerely, Eric J. Stamm, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 05000269, 05000270 and 05000287 License Nos. DPR-38, DPR-47 and DPR-55
Enclosure:
Information Request for Oconee Nuclear Station Problem Identification and Resolution Inspection cc Distribution via Listserv PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Signed by Stamm, Eric on 03/10/23
SUNSI Review x
Non-Sensitive
Sensitive x
Publicly Available
Non-Publicly Available OFFICE RII/DRP/RPB1 RII/DRP/RPB1 NAME D. Jackson E. Stamm DATE 3/10/2023 3/10/2023
INFORMATION REQUEST FOR OCONEE NUCLEAR STATION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (May 1 - 5, and May 15 - 19, 2023)
Note: Unless otherwise noted, the information requested below corresponds to documents generated since March 1, 2021. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
- 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program (CAP). This should include procedures related to:
a) Corrective action program/process b) Cause evaluations c)
Operating experience program d) Employee concerns program e) Self-assessment program f)
Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i)
System health process or equivalent equipment reliability improvement programs j)
Preventive maintenance deferral process k)
Work management program/process (i.e., worker orders and requests)
If any of the procedures requested above were revised after March 2021, please provide (or have available) copies of all subsequent revisions during the onsite inspection
- 2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions.
Please provide by March 23, 2023.
- 3. List of all nuclear condition reports (NCRs) initiated including the following information for each NCR:
a) NCR number b) Brief, but complete problem description c)
Priority or level d) Affected system e) Affected component f)
Responsible plant department g) NCR completion status Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization NCR #
Title/Description Priority System Component Org Status NCR 001 A RHR Pump failed flow criteria per SR 5.0.5.4 2
RHR 2-RHR-PMP-A ENG Open
2 4.
List of outstanding corrective actions including the following information for each action:
a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)
c)
Brief, but complete corrective action description d) Associated NCR/action request (AR) number e) Corrective action initiation date f)
Number of extensions g) Corrective action due date h) Completion status Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization.
Corrective Action #
Type Description AR Initiation Date Extensions Due Date Status NCR 0034 CAPR Revise Procedure NGK-003-4585 AR 0058 01/05/22 2
06/15/23 Awaiting review
- 5. List of control room deficiencies with a brief description and corresponding NCR/AR and/or work order number
- 6. List of operator workarounds and operator burdens with a brief description and corresponding NCR/AR number and/or work order number
- 7. List of all currently extended or overdue NCRs, sorted by initiation date, with the following information:
a) NCR number b) Priority or Significance c)
NCR title and short description
- 8. List of all NCRs/WRs/WOs that have been voided, cancelled, or deleted. Please provide the following information for each NCR/WR/WO:
a) NCR/WR/WO number b) Brief, but complete problem description c)
Reason voided, cancelled, or deleted
- 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the maintenance rule since March 2021. Please include the following information for each system in (a)(1):
a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c)
Planned actions and their status
- 10. List of Maintenance Preventable Functional Failures of risk significant systems with actions completed and current status
3
- 11. List of corrective and deficient maintenance WOs/WRs; WO/WRs considered high risk/emergent; and all WO/WRs characterized as condition adverse to quality (CAQ). Please include the following information for each:
a) WO/WR number b) Work Type c)
Brief, but complete work description d) Affected system e) Affected component f)
Date of initiation g) Date of completion (if completed) h) Associated CR (if applicable) i)
Status j)
Priority k)
CAQ attribute Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system
- 12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and Licensee identified violations (LIVs). Please include a cross reference relating NRC finding and LIVs to appropriate CR numbers.
- 13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) submitted. Please include a cross reference relating LER number to appropriate CR number.
- 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OpE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., AR/NCR/WO/WR number) for the documents that evaluated the aforementioned OpE information
- 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the CAP
- 16. Copies of all department self-assessments
- 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends
- 18. Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available Work Order #
Work Type Description System Component Initiation Date Due Date Assoc.
CR #
Status Priority CAQ Attribute WO01345 CM Replace breaker 2A-BKR-08-BB4 for 2A SI Pump SI 2A-SI-PMP, BKR-08-BB4 01/05/21 03/15/22 N/A Closed 3
4
- 19. List of routine meetings involving the CAP (including but not limited to CAP screening, new work screening, trending, maintenance rule, operating experience, etc.,) to be held during the onsite inspection weeks
- 20. List of CRs related to equipment aging issues in the top ten risk significant systems since March 2018 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification).
Please provide the following information for each CR, in a format compatible with spreadsheet software and ensure the list is sortable and searchable:
a) CR number b) Priority c)
CR problem description
- 21. If performed, provide all self-assessments of the site safety culture completed
- 22. Copies of CAP documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
- 23. List of all root cause, apparent cause, common cause and related or similar equipment cause evaluations with a brief description
- 24. Copy of probabilistic risk assessment importance measures report, if available
- 25. System health reports, system design basis documents, maintenance rule functions and status, and system description information upon notification of system selections