Part 21 Interim Report, Dresser Investigation File No. 2007-02, Interim Reporting of a Potential Defect Involving Power Actuated Pressure Relief Valves Supplied to Calvert Cliffs, Fort Calhoun and Oconee Plants
ML071230090
Person / Time
Site: Calvert Cliffs, Oconee, Fort Calhoun  Duke Energy icon.png
Issue date: 04/27/2007
From: Peterson B
Dresser
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML071230090 (3)


Text

Consolidated April 27, 2007 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Dresser, Pressure Relief Operation 1 OCFR Part 21 Interim Report, Dresser Investigation File No. 2007-02 Interim reporting of a potential defect involving Power Actuated Pressure Relief Valves supplied to Calvert Cliffs, Fort Calhoun and Oconee Nuclear Power Plants.

Gentlemen, Dresser has identified the following potential defect, which could possibly be reportable under the requirements of 10 CFR Part 21. Dresser's ongoing investigation into the situation is expected to exceed the 60 day evaluation requirements of 10CFR Part 21, Subsection 21.21 (a)(1). As a result, this interim report is submitted as notification of the potential defect and timeline for completing the evaluation as required by Subsection 21.21 (a)(2). The potential defect involves Dresser's power actuated, pilot operated pressure relief valve model 31533VX. This Part 21 investigation has been initiated based on the occurrence of four (4) events in the field resulting in the equipment's inability to perform its intended function. The Dresser 31533VX model relief valve is used for system overpressure protection and manual blowdown. This valve model is not capacity certified; therefore, no credit can be taken in the plant's overpressure protection report for the relieving capacity. Dresser's engineering and quality assurance departmentsare currently working to identify root cause of each event, and identify affected equipment. Should it be determined that a defect exists, a notification will be provided in accordance with the requirements of 1 OCFR Part 21. In order to complete a thorough evaluation, we request an additional 90 days beyond the mandated 60 day requirement dictated by 1 OCFR Part 21.

Dresser Consolidated

  • Pressure Relief Operations LA Hwy 3225 @ US Hwy 167N - Alexandria, LA 71309* www.dresser.com Consolidated and Green Tag are registered trademarks of Dresser, Inc.

1/

Evaluation Timeline On February 13, 2007, Dresser engineering requested the opening of a 10CFR Part 21 investigation based on four (4) events occurring in the field.

An interim letter to the NRC requesting a 90 day extension is issued on April 27, 2007.

Final evaluation and closure of Dresser 1 OCFR Part 21 File 2007-02, including any required notification to the NRC, shall be completed by Friday, July 13, 2007.

Sincerely, Bill Peterson, Director of Operations Consolidated Pressure Relief Valves Dresser, Inc.

cc:

J. R. Ball - Director Quality R. D. Danzy - Vice President Technology and Product Development J. W. Dickson - Manager Applications Engineering M. E. Byers - Manager Quality Control R. S. Huffman - Sr. Applications Engineer J. C. Shuckrow - Quality Engineer

Bill Peterson Director of Operations Dresser, Inc.

Consolidated Pressure Relief Valves P. 0. Box 1430 LA Hwy. 3225 @ US Hwy 167 N.

Alexandria, LA 71309 www.dresser.com bill.peterson@dresser.com Consolidated Direct: 318-640-6474 Fax: 318-640-6126 Mobile: 318-730-8588 Consolidateds Pressure Relief Valves