 Issue dateTitleTopic
ML23256A08825 September 2023Issuance of Alternative to Steam Generator WeldsHydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Finite Element Analysis
ML23151A34830 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23118A0761 May 2023Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIIncorporated by reference
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)17 February 2023Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Weld Overlay
Hydrostatic
Finite Element Analysis
Flow Accelerated Corrosion
Stress corrosion cracking
ML22096A00318 November 2022McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud ExaminationsAging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
ML22046A28023 February 2022Relief from ASME Code Paragraph ISTP-3540(b) Related to High Pressure Injection Pumps Vibration MeasurementsIncorporated by reference
Scaffolding
ML22046A24518 February 2022Regarding Alternative to Implement Code Case OMN-22, Smooth Running PumpsIncorporated by reference
ML22028A3657 February 2022Authorization and Safety Evaluation for Alternative Acceptance Criteria for Code Case N-853Weld Overlay
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
ML21029A33516 February 2021Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIVT-2
Incorporated by reference
RA-20-0036, Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping2 March 2020Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System PipingTime of Discovery
VT-2
Earthquake
ML20042D71413 February 2020Relief Request 19-ON-002 for Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in ASME Code Case N-770-2
RA-19-0028, Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress21 March 2019Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water StressStress corrosion cracking
Dissimilar Metal Weld
RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)11 February 2019Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)
RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 212 November 2018Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2Eddy Current Testing
ML17331A08626 December 2017Alternative to Inservice Inspection Regarding Reactor Pressure Vessel ThreadsStress corrosion cracking
Thermal fatigue
ML16118A23030 April 2016Relief Request 14-ON-022 Alternative Requirements for Class 2 Residual Heat Removal Heat Exchange WeldsVT-2
Incorporated by reference
Stress corrosion cracking
Through-Wall Leak
ML16053A5011 March 2016Relief Request ON-GRR-01 Grace Period for OM Code Frequencies (CAC Nos. MF7130, MF7131, and MF7132)Power-Operated Valves
Grace period
ML16004A1817 January 2016Relief Request 14-ON-003 Alternative Requirements for Class 1 Category B-J Piping WeldsNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML16004A2627 January 2016Relief Request 15-ON-004: Limited Visual Examinations of the Reactor Pressure Vessel Support Skirt for the Fourth 10-Year Inservice Inspection Interval ProgramIncorporated by reference
ML15349A45329 December 2015Relief Request 15-ON-001 Repair of Low Pressure Service Water System PipingHydrostatic
Nondestructive Examination
VT-2
Through-Wall Leakage
ONS-2015-087, Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-003, Limited Volume Inspections from 3EOC27 Outage15 July 2015Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-003, Limited Volume Inspections from 3EOC27 OutageVT-2
ONS-2015-088, Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-004, Limited Visual Examinations from 1 EOC27, 2EOC26 and 3EOC27 Outages15 July 2015Fourth Ten-Year Inservice Inspection Plan, Relief Request No. 15-ON-004, Limited Visual Examinations from 1 EOC27, 2EOC26 and 3EOC27 OutagesBoric Acid
High Radiation Area
Hydrostatic
ML13365A02317 January 2014Relief from the Requirements of the ASME Code for Fourth 10-Year Interval Inspection Program Request for ReliefNondestructive Examination
VT-2
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
Thermal fatigue
ML13066A10027 February 2013End of Cycle (EOC) 27 Refueling Outage Steam Generator Inservice Inspection Report
ML13045A29015 February 2013Relief from the Requirements of the ASME OM CodeScaffolding
ML13038A15231 January 2013Fourth Ten-Year Inservice Inspection Plan, Request for Relief No. 12-ON-001VT-2
ML13038A15031 January 2013Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 12-ON-002VT-2
ML12173A31218 June 2012Approval Request for the Fifth Ten-Year Inservice Test Program Interval Pump Specific Code Relief Request No. ON-SRP-HPI-03Scaffolding
ML12030A08923 January 2012Duke Energy Carolinas - Relief Request Serial #09-GO-001 Request for NRC ClarificationThrough-Wall Leakage
ML11143A05921 June 2011Relief Request 10-ON-001 for Reactor Vessel Core Flood Nozzle Weld ExaminationsVT-2
Incorporated by reference
Stress corrosion cracking
Through-Wall Leak
ML11066058828 March 2011Relief Request (RR) Proposed Alternative for Certain Vibration Measurement Requirements RR (ON-SRP-HPI-03)) (TAC Nos. Me 3840, ME3841, ME3842, ME5790, ME5791, ME5792, ME5793, ME5794 and ME5795)Scaffolding
ML1016604739 June 2010Relief Request No. 10-ON-001, Alternative to Volumetric Examination Requirements for the Residual Heat Removal (RHR) Heat Exchanger Class 2 Nozzle-to-Shell WeldsVT-2
Through-Wall Leak
Through-Wall Leakage
ML10088028631 March 2010Relief Request 09-ON-003 for the Use of Full Structural Weld Overlay & Alternative Examination Techniques, for the Letdown Line, Reactor Vessel Core Flood & Reactor Coolant Pump Inlet & Outlet Nozzle Butt Welds.Weld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
ML1006006983 March 2010Relief, Request 09 ON-005 for Reactor Vessel Core Flood Nozzle Weld Examinations (ME1846, ME1847, and ME1848)Incorporated by reference
Dissimilar Metal Weld
DM weld
ML09274031224 September 2009Relief Request from Immediate ASME Code Flaw Repair of Standby Shutdown Facility Auxiliary Service Water PipingSafe Shutdown
Loop seal
Stroke time
Tornado Missile
Hydrostatic
Probabilistic Risk Assessment
Coatings
Functionality Assessment
Operability Determination
Time Critical Operator Action
Flow Induced Vibration
Operational leakage
ML09215002828 July 2009Fourth Ten Year Inservice Inspection Interval Request for Relief No. 09-ON-005Dissimilar Metal Weld
ML09147026520 May 2009Request for Extension of Duke Response Time to Referenced Letter
ML09083072620 March 2009Fourth Ten Year Inservice Inspection Interval, Request for Relief No. 09-ON-003Weld Overlay
Hydrostatic
Nondestructive Examination
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
ML08336003220 November 2008Summary Ultrasonic Examination Results of CompletedWeld Overlay
DM weld
ML0810200537 April 2008Relief Request No. 08-ON-003, from Immediate ASME Code Flaw Repair of Low Pressure Service Water PipingTime of Discovery
Through Wall Leak
Operability Assessment
Operational leakage
ML07346002717 January 2008Relief Request to Use Preemptive Weld Overlay and Alternative Examination Techniques on Decay Heat Removal Line to Hotleg Nozzle WeldsWeld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
ML07156051029 May 2007Fourth Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-007, Revision 1Finite Element Analysis
ML07123009027 April 2007Part 21 Interim Report, Dresser Investigation File No. 2007-02, Interim Reporting of a Potential Defect Involving Power Actuated Pressure Relief Valves Supplied to Calvert Cliffs, Fort Calhoun and Oconee Plants
ML06262023411 September 2006Relief Request 06-ON-004 Request for Additional InformationWeld Overlay
Hydrostatic
Nondestructive Examination
Dissimilar Metal Weld
ML0622902649 August 2006Response to Request for Additional Information Request for Relief No. 05-ON-004VT-2
ML0619400166 July 2006Replacement of Steam Generators Request for Relief No. 04-ON-007, Rev. 1Finite Element Analysis
ML0609302484 May 2006Relief Request 05-ON-003Nondestructive Examination
Liquid penetrant
ML06083029117 April 2006Relief, Volumetric Examination of Essentially 100 Percent of the Volume as Required by the ASME, Boiler and Pressure Vessel Code, Section XI, for Class 1 and 2 WeldsNon-Destructive Examination
VT-2
Incorporated by reference
ML06083010514 April 2006SE MC5483 and MC5483, Relief Request RR-04-ON-013Hydrostatic
VT-2
Incorporated by reference
ML05363023113 March 2006Relief Request MC8852, Repair of Steam Generator TubesIncorporated by reference
Stress corrosion cracking