Letter Sequence Other |
---|
|
|
MONTHYEARML0317604202003-07-21021 July 2003 License Amendment, Relocation of Coolant Chemistry - Conductivity and Chlorides Technical Specification Requirement to Updated Final Safety Analysis Report Project stage: Other 2003-07-21
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML21251A1732021-10-21021 October 2021 Enclosure 1 - Pilgrim Amendment No. 257 ISFSI Only Emergency Plan ML21203A0482021-08-24024 August 2021 License Amendment No. 256 ML21217A1752021-08-0505 August 2021 Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version ML21103A0562021-05-12012 May 2021 Amendment Pilgrim Ps -Alternative Measures Rev 20 ML20335A1832020-12-0101 December 2020 Amendment Pilgrim Ps ISFSI to Incorporate ISFSI II ML20328A2972020-12-0101 December 2020 Amendment No. 253 - Non-Safeguards Version ML19274C6742020-01-0202 January 2020 Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition ML19276C4202020-01-0202 January 2020 Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition ML19275E4252019-10-28028 October 2019 Issuance of Amendment No. 250, Revise Technical Specifications to Permanently Defueled TS and Revise Facility License for Permanently Defueled Condition ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment ML19170A1012019-08-22022 August 2019 Letter, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator ML18284A3752018-11-30030 November 2018 Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled Condition ML18295A0252018-11-16016 November 2018 Correction to Remove Technical Specification Pages from Authority File Related to Amendment Nos. 169 and 177 ML17066A1302017-07-10010 July 2017 Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) ML16250A2232016-10-28028 October 2016 Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician ML16082A4602016-06-0606 June 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request ML14272A0702015-03-12012 March 2015 Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient ML14336A6612014-12-11011 December 2014 Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482) ML14295A6852014-10-31031 October 2014 Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12261A1302012-11-13013 November 2012 Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation Milestone ML1220100482012-08-0707 August 2012 Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip Setpoint ML0910404232012-05-29029 May 2012 Issuance of Renewed License for Pilgrim Nuclear Generating Station ML11152A0432011-07-22022 July 2011 License Amendment, Cyber Security Plan ML1106500092011-03-28028 March 2011 Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety Valves ML0906402242009-03-26026 March 2009 License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop Operation ML0815703662008-11-20020 November 2008 License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope Habitability ML0727503942007-11-0505 November 2007 License Amendment, Issuance of Amendment Control Rod Operability, Scram Insertion Time, and Control Rod Accumulator Requirements ML0723400092007-08-23023 August 2007 Revised License Pages of Facility Operating License DPR-35 B.5.b ML0708711652007-05-14014 May 2007 Issuance of Amendment Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of Snubbers ML0707404192007-04-25025 April 2007 License Amendment, Issuance of Amendment Single Control Rod Withdrawal Allowances ML0705303842007-03-26026 March 2007 License Amendment, Issuance of Amendment Extension of Pressure-Temperature Limits Specified in Technical Specifications ML0705306462007-03-26026 March 2007 Issuance of License Amendment 226 Adoption of Technical Specification Task Force (TSTF) Change TSTF-484 Use of TS 3.10.1 for Scram Time Testing Activities. ML0624303372006-09-20020 September 2006 License Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and Actions ML0622803042006-09-14014 September 2006 Issuance of Amendment Relocation of Technical Specifications ML0617200682006-08-0909 August 2006 Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities ML0618400322006-08-0404 August 2006 Issuance of License Amendment 222 Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature ML0606000402006-04-13013 April 2006 Issuance of Amendment Removal of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement ML0607402142006-04-13013 April 2006 License Amendment 221 Regarding Revised Rod Worth Minmizer Bypass Allowances ML0601701192006-04-12012 April 2006 Issuance of Amendment Single Recirculation Loop Operation ML0531404332006-04-10010 April 2006 Issuance of Amendment Revised Applicability for Containment Oxygen and Differential Pressure Limits ML0518700032005-08-29029 August 2005 Issuance of License Amendment 217, Surveillance Frequency Improvements ML0518702572005-07-29029 July 2005 License Amendment 216 Revised Action for Scram Discharge Volume Vent and Drain Valves ML0501804932005-03-16016 March 2005 License Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing Requirements ML0500504862005-02-0202 February 2005 Issuance of Amendment Changes to Technical Specifications Table 3.2.C-1 ML0423001372005-01-0505 January 2005 License Amendment, Revision to the Reactor Pressure Vessel Material Surveillance Program ML0434902432004-12-27027 December 2004 Issuance of Amendment Engineering Evaluation Submitted Pursuant to Technical Specifications Section 3.6.D.3 and 3.6.D.4 ML0419704502004-08-17017 August 2004 License Amendment, Issuance of Amendment Re.: Multiple Control Rod Removal, Limiting Condition for Operation 3/4.10.D ML0411000092004-07-22022 July 2004 License Amendment, Eliminate Requirements for Hydrogen Analyzers 2021-08-05
[Table view] Category:Safety Evaluation
MONTHYEARML21217A1752021-08-0505 August 2021 Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version ML20328A2972020-12-0101 December 2020 Amendment No. 253 - Non-Safeguards Version ML19276C4202020-01-0202 January 2020 Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition ML19274C6742020-01-0202 January 2020 Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition ML19142A0432019-12-18018 December 2019 Letter and Safety Evaluation, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment ML19170A2502019-08-22022 August 2019 Enclosure 3, Safety Evaluation for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) ML19122A1992019-06-11011 June 2019 Review of Spent Fuel Management Plan ML18284A3752018-11-30030 November 2018 Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled Condition ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17066A1302017-07-10010 July 2017 Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) ML17093A8942017-05-12012 May 2017 Pilgrim Nuclear Power Station - Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093) ML17058A3252017-04-12012 April 2017 Approval of Certified Fuel Handler Training and Retraining Program ML16250A2232016-10-28028 October 2016 Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16082A4602016-06-0606 June 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16124B0872016-05-0303 May 2016 E-mail Review of Safety Evaluation for Proposed Alternative Relief Request No. PRR-51 ML16042A2912016-03-15015 March 2016 Issuance of Proposed Alternative Relief Request PRR-51, Relief from the Requirements of the ASME Code ML16008B0772016-03-0303 March 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15338A3092016-01-0505 January 2016 Relief Request PRR-50, Relief from the Requirement of the ASME Code, Implementation of Code Case N-702 ML15166A4012015-06-19019 June 2015 Request for Alternative PRR-26 for the Fifth 10-year Inservice Inspection Interval ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request ML15103A0692015-04-21021 April 2015 Relief Request PRR-24 Regarding Nozzle-to-Vessel Welds and Nozzle Inner Radii Examination ML15084A0252015-03-23023 March 2015 Non-Proprietary - Safety Evaluation - Fourth 10-Year Interval Inservice Inspection - Request for Relief PRR-24 ML14272A0702015-03-12012 March 2015 Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient ML14336A6612014-12-11011 December 2014 Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482) ML14295A6852014-10-31031 October 2014 Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML14198A1572014-08-0101 August 2014 Relief Requests PR-03 and PR-05 Regarding the Inservice Testing Program (Tac MF0370) ML14083A6312014-03-27027 March 2014 Relief Request PRR-22 Regarding a Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds ML13149A2152013-05-29029 May 2013 Correction to Staff Assessment Letter to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13127A1792013-05-21021 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12261A1302012-11-13013 November 2012 Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation Milestone ML1220100482012-08-0707 August 2012 Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip Setpoint ML12174A1472012-07-10010 July 2012 Safety Evaluation for Relief Request PRR-21, Rev 4, to Install a Weld Overlay on RPV-n14-1 Standby Liquid Control Safe-End Nozzle Weld at Pilgrim ML11152A0432011-07-22022 July 2011 License Amendment, Cyber Security Plan ML1106500092011-03-28028 March 2011 Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety Valves ML1100502982011-01-26026 January 2011 Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLR ML1022901632010-08-25025 August 2010 Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power Station ML0936208072010-01-22022 January 2010 Cover Letter, (Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point, Palisades, Pilgrim, and Vermont Yankee Nuclear Power St ML0936208952010-01-22022 January 2010 Safety Evaluation,(Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point,Palisades,Pilgrim, and Vermont Yankee Nuclear Power ML0928706472009-10-29029 October 2009 Request for Threshold Determination Under 10 CFR 50.80-Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Nos. 1, 2 and 3, Palisades, Pilgrim, Vermont Yankee ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML0923705492009-09-11011 September 2009 Relief Request (PRR)19, Install a Weld Overlay on Jet Pump Instrumentation Nozzle Weld RPV-N9A-1- Pilgrim Nuclear Power Station ML0911304562009-04-30030 April 2009 Relief Request ISI-2008-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Destructive Testing Activities-Pilgrim Nuclear Power Station ML0906402242009-03-26026 March 2009 License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop Operation ML0815703662008-11-20020 November 2008 License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope Habitability 2021-08-05
[Table view] |
Text
July 21, 2003 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
400 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT RE:
RELOCATION OF COOLANT CHEMISTRY - CONDUCTIVITY AND CHLORIDES TECHNICAL SPECIFICATION REQUIREMENT TO THE UPDATED FINAL SAFETY ANALYSIS REPORT (TAC NO. MB5685)
Dear Mr. Kansler:
The Commission has issued the enclosed Amendment No. 202 to Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station. This amendment is in response to your application dated July 5, 2002, as supplemented August 13, 2002.
This amendment relocates portions of Technical Specification (TS) 3/4.6.B, Primary System Boundary - Coolant Chemistry, to the Pilgrim Nuclear Power Station Updated Final Safety Analysis Report (UFSAR). The relocated portions of the TS involve limiting condition for operation and surveillance requirements for reactor coolant conductivity and chloride concentration. The associated Bases section will also be relocated to the UFSAR.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register Notice.
Sincerely,
/RA/
Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosures:
- 1. Amendment No. 202 to License No. DPR-35
- 2. Safety Evaluation cc w/encls: See next page
Pilgrim Nuclear Power Station cc:
Resident Inspector Mr. Steve Brennion U. S. Nuclear Regulatory Commission Supt., Regulatory & Industry Affairs Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.
Post Office Box 867 Pilgrim Nuclear Power Station Plymouth, MA 02360 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Chairman, Board of Selectmen 11 Lincoln Street Mr. Jack Alexander Plymouth, MA 02360 Manager, Reg. Relations and Quality Assurance Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5599 Duxbury, MA 02332 Mr. David F. Tarantino Office of the Commissioner Nuclear Information Manager Massachusetts Department of Pilgrim Nuclear Power Station Environmental Protection 600 Rocky Hill Road One Winter Street Plymouth, MA 02360-5599 Boston, MA 02108 Ms. Jane Perlov Office of the Attorney General Secretary of Public Safety One Ashburton Place Executive Office of Public Safety 20th Floor One Ashburton Place Boston, MA 02108 Boston, MA 02108 Dr. Robert M. Hallisey, Director Mr. Stephen J. McGrail, Director Radiation Control Program Attn: James Muckerheide Commonwealth of Massachusetts Massachusetts Emergency Management Executive Offices of Health and Agency Human Services 400 Worcester Road 174 Portland Street Framingham, MA 01702-5399 Boston, MA 02114 Chairman Regional Administrator, Region I Nuclear Matters Committee U. S. Nuclear Regulatory Commission Town Hall 475 Allendale Road 11 Lincoln Street King of Prussia, PA 19406 Plymouth, MA 02360 Mr. John M. Fulton Mr. William D. Meinert Assistant General Counsel Nuclear Engineer Entergy Nuclear Operations, Inc. Massachusetts Municipal Wholesale 440 Hamilton Avenue Electric Company White Plains, NY 10601 P.O. Box 426 Ludlow, MA 01056-0426
Pilgrim Nuclear Power Station (Cont.)
cc:
Mr. Gary Taylor Mr. John Kelly Chief Executive Officer Director, Nuclear Safety Assurance Entergy Operations Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John Herron Ms. Charlene Faison Sr. VP and Chief Operating Officer Manager, Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Michael A. Balduzzi Director of Oversight Site Vice President Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. 440 Hamilton Avenue Pilgrim Nuclear Power Station White Plains, NY 10601 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. John M. Fulton Assistant General Counsel Mr. William J. Riggs Entergy Nuclear Operations, Inc.
Director, Nuclear Assessment 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 Pilgrim Nuclear Power Station 600 Rocky Hill Road Senior Resident Inspector Plymouth, MA 02360-5508 U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Mr. Bryan S. Ford 600 Rocky Hill Road Manager, Licensing Mail Stop 66 Entergy Nuclear Operations, Inc. Plymouth, MA 02360-5508 Pilgrim Nuclear Power Station 600 Rocky Hill Road Regional Administrator, Region I Plymouth, MA 02360-5508 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Dan Pace King of Prussia, PA 19406-1415 Vice President, Engineering Entergy Nuclear Operations, Inc. Ms. Stacey Lousteau 440 Hamilton Avenue Treasury Department White Plains, NY 10601 Entergy Services, Inc.
639 Loyola Avenue, Mail Stop L-ENT-15E Mr. Randall Edington New Orleans, LA 70113 Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
July 21, 2003 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
400 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT RE:
RELOCATION OF COOLANT CHEMISTRY - CONDUCTIVITY AND CHLORIDES TECHNICAL SPECIFICATION REQUIREMENT TO THE UPDATED FINAL SAFETY ANALYSIS REPORT (TAC NO. MB5685)
Dear Mr. Kansler:
The Commission has issued the enclosed Amendment No. 202 to Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station. This amendment is in response to your application dated July 5, 2002, as supplemented August 13, 2002.
This amendment relocates portions of Technical Specification (TS) 3/4.6.B, Primary System Boundary - Coolant Chemistry, to the Pilgrim Nuclear Power Station Updated Final Safety Analysis Report (UFSAR). The relocated portions of the TS involve limiting condition for operation and surveillance requirements for reactor coolant conductivity and chloride concentration. The associated Bases section will also be relocated to the UFSAR.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register Notice.
Sincerely,
/RA/
Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosures:
- 1. Amendment No. 202 to License No. DPR-35
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
J. Clifford C. Anderson, RI PUBLIC C. Raynor PDI-2 Reading T. Tate OGC G. Hill (2), T-5C3 ACRS S. Magruder C. Holden F. Arner, RI J. Bobiak, RI L. Lund ADAMS Accession Number: ML031760420 OFFICE PDI-2/PM PDI-2/LA EMCB IROB OGC PDI-2/SC NAME TTate SLittle for CRaynor ALund SLim SCole JClifford DATE 6/25/03 6/25/03 6/30/03 7/1/03 7/14/03 7/21/03 OFFICIAL RECORD COPY
ENTERGY NUCLEAR GENERATION COMPANY ENTERGY NUCLEAR OPERATIONS, INC.
DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 202 License No. DPR-35
- 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A. The application for amendment filed by Entergy Nuclear Operations, Inc. (the licensee) dated July 5, 2002, as supplemented August 13, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commissions rules and regulations; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-35 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 202, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of issuance and shall be implemented within 60 days. The implementation of this amendment shall include the relocation of certain technical specification requirements and the associated bases to the Pilgrim Nuclear Power Station Updated Final Safety Analysis Report in accordance with 10 CFR 50.71(e), as described in the licensees application dated July 5, 2002, as supplemented by letter dated August 13, 2002, and evaluated in the staffs Safety Evaluation attached to this amendment.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: July 21, 2003
ATTACHMENT TO LICENSE AMENDMENT NO. 202 FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3/4.6-3 3/4.6-3 B3/4.6-4 B3/4.6-4 B3/4.6-5 B3/4.6-5
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 202 TO FACILITY OPERATING LICENSE NO. DPR-35 ENTERGY NUCLEAR GENERATION COMPANY ENTERGY NUCLEAR OPERATIONS, INC.
PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293
1.0 INTRODUCTION
By application dated July 5, 2002, as supplemented by letter dated August 13, 2002, Entergy Nuclear Operations, Inc. (ENO or the licensee) submitted a request for changes to the Pilgrim Nuclear Power Station (Pilgrim) Technical Specifications (TSs). The requested changes would relocate portions of TS 3/4.6.B, Primary System Boundary - Coolant Chemistry, to the Pilgrim Updated Final Safety Analysis Report (UFSAR). Specifically, the changes would relocate TSs 3.6.B.2, 3.6.B.3, and 3.6.B.4 requirements for reactor coolant conductivity and chloride concentration to the UFSAR. The associated surveillance requirements (SRs) in TSs 4.6.B.2 and 4.6.B.3 for monitoring, sampling, and analysis of the reactor coolant would also be relocated to the UFSAR. The existing TS 3.6.B.5 would be renumbered to TS 3.6.B.2 based on the relocation of the prior sections. The associated Bases sections would also be relocated to the UFSAR.
ENO is requesting the proposed change in support of future plans for the application of Noble Metal Chemical Addition at Pilgrim.
2.0 REGULATORY EVALUATION
Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. In Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36 (10 CFR 50.36), the Commission established regulatory requirements related to the content of TSs. This regulation requires that the TSs include items in eight specific categories. These categories include 1) safety limits, limiting safety system settings, and limiting control settings, 2) limiting conditions for operation (LCOs), 3) SRs, 4) design features, 5) administrative controls, 6) decommissioning, 7) initial notification, and 8) written reports. However, the regulation does not specify the particular requirements to be included in a plants TSs.
The U.S. Nuclear Regulatory Commission (NRC) developed criteria, as described in the Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors (58 FR 39132), to determine which design conditions and associated surveillances should be
located in the TSs as LCOs. Four criteria were subsequently incorporated into the regulations by an amendment to 10 CFR 50.36 (60 FR 36953) and are as follows:
(1) Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
(2) A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(3) A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(4) A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
The Commissions Final Policy Statement and documentation related to the revision of 10 CFR 50.36 acknowledged that implementation of these criteria may permit some requirements presently in the TSs to be relocated to other licensee-controlled documents and programs.
The NRC staff reviewed the TSs proposed to be relocated for compliance with 10 CFR 50.36 and agreement with the precedent as established in NUREG-1433, Rev. 2, Standard Technical Specifications, General Electric Plants, BWR/4," for boiling-water reactors (BWRs). The NRC staff review also ensured that future changes to relocated TSs requirements will receive appropriate regulatory control.
3.0 TECHNICAL EVALUATION
3.1 Reactor Coolant Chemistry Requirements Pilgrim TS 3/4.6.B provides the LCO and associated SRs for reactor coolant system chemistry for all MODES of operation. Specifically, TSs 3.6.B.2, 3.6.B.3, and 3.6.B.4 provide the required reactor coolant conductivity and chloride concentration limits for steaming rates of less than 100,000 pounds per hour (lbs/hr), for reactor startups and the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the reactor is in the power operating condition, and for steaming rates greater than 100,000 lbs/hr, respectively. SRs 4.6.B.2 and 4.6.B.3 provides the required frequency for obtaining reactor coolant samples and performing analysis of the conductivity and chloride content. These frequencies are specified for steaming rates, for reactor startups, and for conditions in which all continuous monitors are inoperable.
The licensee proposes to relocate TSs 3/4.6.B.2, 3/4.6.B.3, and 3.6.B.4 for the reactor coolant conductivity and chloride concentration from the TSs to the USFAR. TS 3.6.B.5 is applicable to the proposed relocated TSs; therefore, the licensee stated in its application that the requirement will be repeated in the UFSAR. The requirements of the current TS 3.6.B.5 will
remain in the TSs. The licensees evaluation against the four criteria of 10 CFR 50.36 are addressed below:
(1) The reactor coolant conductivity and chloride concentration limits as specified in TS 3.6.B and 4.6.B are not used to detect and indicate in the control room a significant abnormal degradation of the reactor coolant pressure boundary. The TS provides limits on particular chemical properties of the primary coolant, and surveillance requirements to monitor these properties to ensure that degradation of the reactor coolant pressure boundary is not exacerbated by poor chemistry condition.
However, degradation of the reactor coolant pressure boundary is a long-term process.
Other regulations and TSs provide direct means to monitor and correct the degradation of the reactor coolant pressure boundary; for example, in-service inspection and primary coolant leakage limits.
(2) Chemistry parameters are not used as an initial condition of a Design Basis Accident or Transient Analysis that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier.
(3) Reactor coolant conductivity and chloride concentration are not used as part of the primary success path which functions or actuates to mitigate a Design Basis Accident or Transient.
(4) Operating experiences or probabilistic safety assessments have not shown chemistry parameters to be significant to public health and safety.
In the application dated July 5, 2002, the licensee stated that materials in the primary system are primarily stainless steels and Zircaloy cladding. In addition, the licensee stated that abnormal chemistry conditions in the reactor coolant may be corrected through operation of the reactor water cleanup system, reducing the input of impurities, or placing the reactor in a cold shutdown condition.
The NRC staff has reviewed the licensees regulatory and technical analysis in support of its proposed license amendment which are described in Sections 4.0 and 5.0 of the licensees submittal. Degradation of the reactor coolant pressure boundary due to reactor coolant chemistry is a phenomena which occurs under favorable conditions over an extended period of time. The reactor coolant conductivity and chloride concentration limits proposed to be relocated are established to control stress corrosion cracking of the primary system component materials and to provide a means of indicating abnormal conditions or the presence of unusual materials in the reactor coolant. Engineering and industry experience shows that stress corrosion cracking of the stainless steel in the primary system components is induced by the chloride-oxygen content and the temperature of the reactor coolant. Zircaloy does not exhibit the same stress corrosion failure mechanisms as stainless steel. The conductivity and chloride concentration limits provide operating restrictions that are dependent on the conditions of the reactor coolant water. The limits are more restrictive under conditions in which the chloride-oxygen content in the reactor coolant would tend to induce corrosion of the primary system materials.
The NRC staff evaluated the licensees proposed change against the four criteria set forth in 10 CFR 50.36(c)(2)(ii). The conductivity and chloride concentration limits are not installed instrumentation that is used to detect and indicate in the control room a significant abnormal degradation of the reactor coolant pressure boundary. Therefore, the staff determined that the concentration limits do not meet criterion 1. The conductivity and chloride concentration limits provide operating restrictions based on the conditions of the reactor coolant water which could induce corrosion. However, the concentration limits are not used as an initial condition of, or part of the primary success path which functions or actuates to mitigate, a design-basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. Therefore, the staff determined that the concentration limits do not meet criterion 2 and 3. The concentration limits are not a structure, system, or component in which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. Therefore, the staff determined that the concentration limits do not meet criterion 4. The staff concludes that the requirements proposed to be relocated to the UFSAR, as discussed above, are not required to be in the TSs pursuant to 10 CFR 50.36. This proposed change is also consistent with NUREG-1433, for BWRs.
The NRC staff finds that sufficient regulatory controls exist under the regulations with regard to the relocated provisions. The facility and procedures described in the UFSAR can only be revised in accordance with the provisions of 10 CFR 50.59, which ensures records are maintained and establishes appropriate controls over changes to the requirements removed from TSs. The documentation of these changes will be maintained by the licensee as required by 10 CFR 50.59. The submittal of the updated licensee-controlled documents (e.g., UFSAR) to the Commission will be as required by, and in accordance with 10 CFR 50.71(e) for the updated UFSAR.
3.2 Administrative Changes The relocation of TSs 3.6.B.2, 3.6.B.3, and 3.6.B.4 creates blank spaces in the existing TSs for those requirements. The licensee proposed in its application to renumber the existing TS 3.6.B.5 to TS 3.6.B.2 for number sequence consistency. No changes to the existing requirements are proposed. The staff determined that this proposed change is administrative in nature and is acceptable.
3.3 TS Bases The licensee included the TS Bases pages and modifications associated with the proposed changes. The staff does not object to the proposed changes.
3.4 Evaluation Summary The NRC staff concludes that the TS requirements being relocated to the UFSAR are appropriate for relocation under the criteria in 10 CFR 50.36. In addition, the staff finds that appropriate controls exist for all of the current specifications, requirements, and information that are being moved to licensee-controlled documents. The staff also concludes that, in accordance with the Final Policy Statement, sufficient regulatory controls exist under the regulations, specifically 10 CFR 50.59 and 10 CFR 50.71(e). Accordingly, these changes in specifications, information, and requirements, as described in this evaluation, are acceptable and may be relocated from the Pilgrim TSs and placed in the UFSAR.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Massachusetts State Official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes LCO requirements and SRs with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (68 FR 28850). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: T. Tate Date: July 21, 2003