March 2002 Monthly Operating Report for Point Beach Nuclear Plant Units 1 & 2
ML021160318
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/15/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0025
Download: ML021160318 (14)


Text

Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 920.388.2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 920.755.2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0025 April 15, 2002 GL 97-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc:

J. D. Loock, PSCW NRC Region Ill NRC Senior Resident Inspector NRC Project Manager Committed to Nuclear Excellence

Docket 50-266 and 50-301 NRC-2002-0025 Bcc:

R. A. Abdoo (WE)

R. A. Anderson(NMC)

INPO Records Center D. E. Day K. Kretzer A. J. Cayia M. E. Reddemann G. A. Chamoff R. G. Mende K. E. Peveler C. B. Jilek McGraw-Hill Companies R. R. Grigg (WE)

R. M. Daflucas E. J. Weinkam IH (NMC) T. W. Hanna D. A. Weaver (WE)

R. P. Pulec (KNPP)

T.H. Taylor File C. S. Smoker (NMC) T. E. Ruiz G. D. Strharsky R. R. Winget RSL File (3)

B. D. Kemp A-2

Docket 50-266 and 50-301 NRC-2002-0025 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated April 2, 2002 Re: Monthly Operating Report -March 2002

OPERATING DATA REPORT DATE: 04/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES REPORTING PERIOD: March - 2002 LICENSED THERMAL POWER (MWT): 1,518.5 NAMEPLATING RATING (GROSS MWE): 537.7 DESIGN ELECTRICAL RATING (NET MWE): 515.0 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 530.0 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 510.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): n/a

10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ONLINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GENERATED NET ELECTRICAL ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (USING MDC NET)

UNIT CAPACITY FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE THIS MONTH 744.0 744.0 0.0 744.0 0.0 1,118,820.0 388,500.0 372,311.0 100.0%

100.0%

98.1%

97.2%

0.0%

YEAR TO DATE 2,160.0 2,160.0 0.0 2,160.0 0.0 3,266,081.0 1,134,520.0 1,087,610.5 100.0%

100.0%

98.7%

97.8%

0.0%

CUMULATIVE 275,255.0 225,769.8 667.3 222,254.0 846.9 317,268,532.0 107,676,620.0 102,663,130.5 80.7%

81.1%

76.2%

74.8%

4.4%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

1.
2.
3.
4.
5.
6.
7.

8.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

DOCKET NO. 50-266

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-266 Point Beach, Unit 1 04/03/02 Kim M. Locke 755-6420 REPORTING PERIOD:

March 2002 (Month/Year)

(1) Reason A. Equipment Failure (Explain)

B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)

(2) Method I Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of March was 500.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

OPERATING DATA REPORT DATE: 04/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES REPORTING PERIOD: March - 2002 LICENSED THERMAL POWER (MWT): 1,518.5 NAMEPLATING RATING (GROSS MWE): 537.7 DESIGN ELECTRICAL RATING (NET MWE): 515.0 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 532.0 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): 0

10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ONLINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GENERATED NET ELECTRICAL ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (USING MDC NET)

UNIT CAPACITY FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE THIS MONTH 744.0 744.0 0.0 744.0 0.0 1,128,214.0 396,950.0 381,210.0 100.0%

100.0%

100.1%

99.5%

0.0%

YEAR TO DATE 2,160.0 2,099.3 0.0 2,088.3 0.0 3,114,956.0 1,087,270.0 1,041,477.5 96.7%

96.7%

94.2%

93.6%

3.3%

CUMULATIVE 260,040.0 219,880.9 233.9 216,942.5 302.2 313,163,373.0 106,815,310.0 101,824,984.5 83.4%

83.5%

79.8%

78.5%

2.2%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LET-'ER DATED MAY 15, 1997

1.
2.
3.
4.
5.
6.
7.

8.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

DOCKET NO. 50-301

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-301 Point Beach, Unit 2 04/03/02 Kim M. Locke 755-6420 REPORTING PERIOD: March 2002 (Month/Year)

(1) Reason A. Equipment Failure (Explain)

B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H Other (Explain)

(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of March was 512.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU CYCLE AVERAGE REGION AVERAGE 126B 127A 127B 128A 128B 129A 129B CORE MWTHR DAYS IN PERIOD/CYCLE POWER FACTOR PROJECTED EOL BURNUP THIS PERIOD 1055.

389.

331.

747.

1237.

1338.

1426.

1256.

1118820.

31 99.0%

15983.

SCHEDULED REFUELING DATE 9/14/2002 BURNUP FOR CYCLE 27 (MWD/MTU)

REMAINING EFFECTIVE FULL POWER DAYS FRACTION OF CYCLE LIFE EXPENDED ESTIMATED POWER FACTOR 100.%

TEN PPM BORON DATE 9/18/2002 DESIGN BURNUP DATE 9/21/2002 TOTAL CYCLE 27 10335.

3634.

3054.

7144.

12321.

13406.

13802.

12291.

10963862.

3 322 93.4%

15664.

DESIGN 16285.

173.2 63.5%

DATE FOR DESIGN 95.%

9/27/2002 10, 9/30/2002 10, TOTAL 30773.

39621.

44436.

47085.

34238.

33331.

13802.

12291.

2644261.

BASED ON BASED ON ASSUMING REFUELING TEN PPM 16200.

170.7 63.8%

AND TEN 90.%

/ 7/2002 110/2002 NUMBER OF DAYS IN PERIOD OR CYCLE.

DAYS REMAINING UNTIL REFUELING DATE PERIOD OR CYCLE POWER FACTOR SSCHEDULE DATA NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS USED IN THE FINAL CORE DESIGN.

TEN PPM BURNUP IS THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON BASED ON CURRENT BORON FOLLOW RESULTS.

PPM BURNUPS ASSUMING VARIOUS POWER FACTORS 85.%

80.%

75.%

70.%

65.%

10/18/2002 10/31/2002 11/14/2002 11/30/2002 12/19/2002 10/21/2002 11/ 3/2002 11/17/2002 12/

4/2002 12/23/2002 PBNP UNIT I CYCLE 27 MARCH 2002

BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU CYCLE AVERAGE REGION AVERAGE 223D 224A 225A 225B 226A 226B 227A 227B CORE MWTHR DAYS IN PERIOD/CYCLE POWER FACTOR PROJECTED EOL BURNUP THIS PERIOD 1056.

350.

312.

712.

449.

1127.

1272.

1353.

1184.

1128214.

31 100.0%

15838.

SCHEDULED REFUELING DATE 4/13/2002 BURNUP FOR CYCLE 25 (MWD/MTU)

REMAINING EFFECTIVE FULL POWER DAYS FRACTION OF CYCLE LIFE EXPENDED ESTIMATED POWER FACTOR 100.%

TEN PPM BORON DATE 5/

7/2002 DESIGN BURNUP DATE 5/

7/2002 TOTAL CYCLE 25 15429.

4589.

4087.

10011.

6083.

16441.

18977.

19863.

17441.

16476480.

3E 470 96.2%

15823.

DESIGN 16660.

36.1 92.6%

DATE FOR DESIGN 95.

5/

8/2002 5/

5/

8/2002 5/

TOTAL 34585.

48348.

39392.

39052.

43751.

44651.

42555.

19863.

17441.

932307.

BASED ON BASED 01O ASSUMINC

  • EFUELINC TEN PPM 16660.

36.1 92.6%

AND TEN 90.%

/11/2002

/11/2002 NUMBER OF DAYS IN PERIOD OR CYCLE.

DAYS REMAINING UNTIL REFUELING DATE PERIOD OR CYCLE POWER FACTOR SCHEDULE DATA NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS USED IN THE FINAL CORE DESIGN.

TEN PPM BURNUP IS THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON BASED ON CURRENT BORON FOLLOW RESULTS.

PPM BURNUPS ASSUMING VARIOUS POWER FACTORS 85.%

80.%

75.%

70.%

65.%

5/13/2002 5/16/2002 5/19/2002 5/22/2002 5/26/2002 5/13/2002 5/16/2002 5/19/2002 5/22/2002 5/26/2002 PBNP UNIT 2 CYCLE 25 MARCH 2002

.q 3

POINT BEACH SHIFT OPERATIONAL DATA

SUMMARY

I I

Unit 1 1

Unit 2 1

DAY Gen X02 X04 X08 X27 Net MWhr Avg MWe I Gen X02 X04 X08 X27 Net MWhr Avg MWe 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 12590.0 12630.0 12610.0 12560.0 12590.0 12650.0 12620.0 12650.0 12650.0 12650.0 12680.0 12680.0 12690.0 12650.0 12670.0 12660.0 12660.0 12640.0 12640.0 12650.0 12650.0 12670.0 10750.0 11280.0 12580.0 12690.0 12650.0 12690.0 12660.0 12480.0 12580.0 482.0 484.0 484.0 484.0 481.0 481.0 480.0 479.0 478.0 481.0 481.0 480.0 479.0 480.0 480.0 479.0 478.0 480.0 479.0 479.0 480.0 482.0 454.0 465.0 486.0 479.0 477.0 481.0 475.0 474.0 475.0 37.0 41.0 42.0 33.0 38.0 33.0 34.0 39.0 37.0 40.0 36.0 37.0 36.0 37.0 37.0 38.0 36.0 36.0 36.0 37.0 36.0 38.0 38.0 40.0 36.0 36.0 39.0 36.0 36.0 36.0 34.0 1.5 1.0 1.0 1.0 1.5 1.0 1.0 0.5 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.5 1.0 1.0 1.5 1.0 1.5 1.5 1.5 1.0 1.5 1.0 1.0 1.0 6.0 6.0 7.0 6.5 6.0 6.0 5.5 5.5 10.0 1.0 5.0 5.5 5.5 5.0 5.5 10.5 0.0 5.5 5.0 6.0 5.5 5.5 5.5 6.0 5.5 5.5 5.5 5.5 5.0 5.0 5.0 12063.5 12098.0 12076.0 12035.5 12063.5 12129.0 12099.5 12126.0 12124.0 12127.0 12157.0 12156.5 12168.5 12127.0 12146.5 12131.5 12145.0 12117.5 12118.5 12127.0 12127.5 12143.0 10251.5 10767.5 12051.0 12168.0 12127.5 12166.0 12143.0 11964.0 12065.0 502.6 504.1 503.2 501.5 502.6 505.4 504.1 505.2 505.2 505.3 506.5 506.5 507.0 505.3 506.1 505.5 506.0 504.9 504.9 505.3 505.3 506.0 427.1 448.6 502.1 507.0 505.3 506.9 506.0 498.5 502.7 12790.0 12840.0 12800.0 12750.0 12780.0 12830.0 12780.0 12800.0 12790.0 12800.0 12840.0 12840.0 12840.0 12800.0 12830.0 12810.0 12820.0 12810.0 12710.0 12800.0 12810.0 12810.0 12810.0 12830.0 12830.0 12860.0 12810.0 12850.0 12820.0 12680.0 12780.0 467.0 469.0 468.0 467.0 468.0 467.0 466.0 466.0 465.0 466.0 468.0 468.0 468.0 467.0 468.0 467.0 467.0 466.0 462.0 463.0 462.0 464.0 463.0 463.0 464.0 465.0 462.0 467.0 463.0 465.0 468.0 30.0 3.0 22.0 53.0 41.0 41.0 39.0 32.0 36.0 38.0 34.0 35.0 34.0 35.0 35.0 36.0 32.0 34.0 46.0 26.0 37.0 39.0 39.0 38.0 39.0 37.0 37.0 37.0 35.0 36.0 38.0 1.5 1.0 1.0 1.0 1.5 1.0 1.0 0.5 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.5 1.0 1.0 1.5 1.0 1.5 1.5 1.5 1.0 1.5 1.0 1.0 1.0 6.0 6.0 7.0 6.5 6.0 6.0 5.5 5.5 10.0 1.0 5.0 5.5 5.5 5.0 5.5 10.5 0.0 5.5 5.0 6.0 5.5 5.5 5.5 6.0 5.5 5.5 5.5 5.5 5.0 5.0 5.0 12285.5 12361.0 12302.0 12222.5 12263.5 12315.0 12268.5 12296.0 12278.0 12294.0 12332.0 12330.5 12331.5 12292.0 12320.5 12295.5 12320.0 12303.5 12195.5 12304.0 12304.5 12300.0 12301.5 12321.5 12320.0 12351.0 12304.5 12339.0 12316.0 12173.0 12268.0 511.9 515.0 512.6 509.3 511.0 513.1 511.2 512.3 511.6 512.2 513.8 513.8 513.8 512.2 513.4 512.3 513.3 512.6 508.1 512.7 512.7 512.5 512.6 513.4 513.3 514.6 512.7 514.1 513.2 507.2 511.2 I

i i

MONTHLY TOTALS UNIT 1 Gross Generation:

Total Station Service:

Net Generation:

Average Daily Power:

388,500.0 MWhr 16,189.0 MWhr 372,311.0 MWhr 500.4 MWe MONTHLY TOTALS -

UNIT 2 Gross Generation:

Total Station Service:

Net Generation:

Average Daily Power:

396,950.0 MWhr 15,740.0 MWhr 381,210.0 MWhr 512.4 MWe March, 2002

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 1 - MARCH 2002 ELECTRICAL GROSS GENERATION TOTAL STATION SERVICE NET OUTPUT AVG. GROSS GENERATION FOR MONTH AVG. GROSS GENERATION RUNNING TOTAL STATION SERVICE/GROSS GEN.

HOURS OF GENERATION PLANT PERFORMANCE NET PLANT EFFICIENCY NET PLANT HEAT RATE NUMBER OF DAYS OF OPERATION UNIT NET CAPACITY FACTOR UNIT SERVICE FACTOR SCHEDULED OUTAGES FORCED OUTAGES FORCED OUTAGE HOURS UNIT FORCED OUTAGE RATE NUCLEAR HOURS CRITICAL TOTAL HOURS POSSIBLE INADVERTANT REACTOR TRIPS DURATION OF REACTOR DOWN TIME REACTOR CAPACITY FACTOR REACTOR SERVICE FACTOR THERMAL POWER GENERATED UNITS MWH MWH MWH MWH MWH HRS UNITS BTU/KWH DAYS HRS UNITS HRS HRS HRS MWTHR MONTH 388,500.0 16,189.0 372,311.0 522.2 522.2 4.2%

744.0 MONTH 3.74%

91,161.0 31 98.1%

100.0%

0 0

0.0 0.0%

MONTH 744.0 744.0 0

0.0 880.3%

100.0%

9,945,128.0 YEAR 1,134,520.0 46,909.5 1,087,610.5 525.2 525.2 4.1%

2,160.0 YEAR 8.99%

37,944.0 90 98.7%

100.0%

0 0

0.0 0.0%

YEAR 2,160.0 2,160.0 0

0.0 368.7%

100.0%

12,092,389.0 CUMULATIVE 107,676,620.0 5,013,489.5 102,663,130.5 391.2 484.5 4.7%

222,254.0 CUMULATIVE 31.48%

10,840.1 10,142 76.2%

80.7%

126 73 10,227.1 4.4%

CUMULATIVE 225,769.8 275,255.0 57 49,569.2 78.0%

82.0%

326,094,840.0 STHERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 10,963,862.0

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 2 - MARCH 2002 ELECTRICAL GROSS GENERATION TOTAL STATION SERVICE NET OUTPUT AVG. GROSS GENERATION FOR MONTH AVG. GROSS GENERATION RUNNING TOTAL STATION SERVICE/GROSS GEN.

HOURS OF GENERATION PLANT PERFORMANCE NET PLANT EFFICIENCY NET PLANT HEAT RATE NUMBER OF DAYS OF OPERATION UNIT NET CAPACITY FACTOR UNIT SERVICE FACTOR SCHEDULED OUTAGES FORCED OUTAGES FORCED OUTAGE HOURS UNIT FORCED OUTAGE RATE NUCLEAR HOURS CRITICAL TOTAL HOURS POSSIBLE INADVERTANT REACTOR TRIPS DURATION OF REACTOR DOWN TIME REACTOR CAPACITY FACTOR REACTOR SERVICE FACTOR THERMAL POWER GENERATED UNITS MWH MWH MWH MWH MWH HRS UNITS BTU/KWH DAYS HRS UNITS HRS HRS HRS MWTHR MONTH 396,950.0 15,740.0 381,210.0 533.5 533.5 4.0%

744.0 MONTH 33.79%

10,100.2 31 100.1%

100.0%

0 0

0.0 0.0%

MONTH 744.0 744.0 0

0.0 99.9%

100.0%

1,128,214.0 YEAR 1,087,270.0 45,792.5 1,041,477.5 503.4 520.6 4.2%

2,088.3 YEAR 33.43%

10,207.2 90 94.2%

96.7%

0 1

71.7 3.3%

YEAR 2,099.3 2,160.0 0

60.7 95.0%

97.2%

3,114,956.0 CUMULATIVE 106,815,310.0 4,990,325.5 101,824,984.5 410.8 492.4 4.7%

216,942.5 CUMULATIVE 32.51%

10,495.9 9,180 79.8%

83.4%

92 59 4,901.0 2.2%

CUMULATIVE 219,880.9 260,040.0 50 40,159.1 79.3%

84.6%

313,163,373.0

ý THERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 16,476,480.0

POINT BEACH NUCLEAR PLANT AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH - 2002 AVERAGE DAILY POWER LEVEL MWe NET 503 504 503 501 503 505 504 505 505 505 DAY 11 12 13 14 15 16 17 18 19 20 DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

AVERAGE DAILY POWER LEVEL MWe NET 507 507 507 505 506 505 506 505 505 505 DAY 21 22 23 24 25 26 27 28 29 30 31 50-266 Point Beach, Unit 1 04/02/02 Kim M. Locke 920-755-6420 AVERAGE DAILY POWER LEVEL MWe NET 505 506 427 449 502 507 505 507 506 499 503 DAY 1

2 3

4 5

6 7

8 9

10

POINT BEACH NUCLEAR PLANT AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH - 2002 AVERAGE DAILY POWER LEVEL MWe NET 512 515 513 509 511 513 511 512 512 512 DAY 11 12 13 14 15 16 17 18 19 20 DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

AVERAGE DAILY POWER LEVEL MWe NET 514 514 514 512 513 512 513 513 508 513 DAY 21 22 23 24 25 26 27 28 29 30 31 50-301 Point Beach, Unit 2 04/02/02 Kim M. Locke 920-755-6420 AVERAGE DAILY POWER LEVEL MWe NET 513 513 513 513 513 515 513 514 513 507 511 DAY 1

2 3

4 5

6 7

8 9

10