NRC 2002-0025, March 2002 Monthly Operating Report for Point Beach Nuclear Plant Units 1 & 2

From kanterella
(Redirected from NRC 2002-0025)
Jump to navigation Jump to search
March 2002 Monthly Operating Report for Point Beach Nuclear Plant Units 1 & 2
ML021160318
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/15/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0025
Download: ML021160318 (14)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0025 GL 97-02 April 15, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc: J. D. Loock, PSCW NRC Region Ill NRC Senior Resident Inspector NRC Project Manager

Docket 50-266 and 50-301 NRC-2002-0025 Bcc: R. A. Abdoo (WE) D. E. Day M. E. Reddemann K. E. Peveler R. A. Anderson(NMC) K. Kretzer G. A. Chamoff C. B. Jilek INPO Records Center A. J. Cayia R. G. Mende McGraw-Hill Companies R. R. Grigg (WE) R. M. Daflucas C. S. Smoker (NMC) T. E. Ruiz E. J. Weinkam IH (NMC) T. W. Hanna G. D. Strharsky R. R. Winget D. A. Weaver (WE) R. P. Pulec (KNPP) RSL File (3) B. D. Kemp T.H. Taylor File A-2

Docket 50-266 and 50-301 NRC-2002-0025 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated April 2, 2002 Re: Monthly Operating Report -March 2002

OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 04/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: March - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 530.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 510.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): n/a
10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 2,160.0 275,255.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 225,769.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ONLINE 744.0 2,160.0 222,254.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,118,820.0 3,266,081.0 317,268,532.0
17. GROSS ELECTRICAL ENERGY GENERATED 388,500.0 1,134,520.0 107,676,620.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 372,311.0 1,087,610.5 102,663,130.5
19. UNIT SERVICE FACTOR 100.0% 100.0% 80.7%
20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 81.1%
21. UNIT CAPACITY FACTOR (USING MDC NET) 98.1% 98.7% 76.2%
22. UNIT CAPACITY FACTOR (USING DER NET) 97.2% 97.8% 74.8%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 4.4%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 04/03/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 1 average daily power for the month of March was 500.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 04/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
2. REPORTING PERIOD: March - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 532.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): 0
10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 2,160.0 260,040.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,099.3 219,880.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ONLINE 744.0 2,088.3 216,942.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,214.0 3,114,956.0 313,163,373.0
17. GROSS ELECTRICAL ENERGY GENERATED 396,950.0 1,087,270.0 106,815,310.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 381,210.0 1,041,477.5 101,824,984.5
19. UNIT SERVICE FACTOR 100.0% 96.7% 83.4%
20. UNIT AVAILABILITY FACTOR 100.0% 96.7% 83.5%
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.1% 94.2% 79.8%
22. UNIT CAPACITY FACTOR (USING DER NET) 99.5% 93.6% 78.5%
23. UNIT FORCED OUTAGE RATE 0.0% 3.3% 2.2%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LET-'ER DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 04/03/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H Other (Explain)

SUMMARY

Unit 2 average daily power for the month of March was 512.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

PBNP UNIT I CYCLE 27 MARCH 2002 - BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 27 TOTAL CYCLE AVERAGE 1055. 10335. 30773.

REGION AVERAGE 126B 389. 3634. 39621.

127A 331. 3054. 44436.

127B 747. 7144. 47085.

128A 1237. 12321. 34238.

128B 1338. 13406. 33331.

129A 1426. 13802. 13802.

129B 1256. 12291. 12291.

CORE MWTHR 1118820. 10963862. 3 2644261.

DAYS IN PERIOD/CYCLE 31 322 POWER FACTOR 99.0% 93.4%

  • BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

PROJECTED EOL BURNUP 15983. 15664.

  • BASED ON DAYS REMAINING UNTIL REFUELING DATE ASSUMING PERIOD OR CYCLE POWER FACTOR REFUELINGSSCHEDULE DATA SCHEDULED REFUELING DATE 9/14/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS BURNUP FOR CYCLE 27 (MWD/MTU) 16285. 16200. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS REMAINING EFFECTIVE FULL POWER DAYS 173.2 170.7 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON FRACTION OF CYCLE LIFE EXPENDED 63.5% 63.8% BASED ON CURRENT BORON FOLLOW RESULTS.

ESTIMATED DATE FOR DESIGN AND TEN PPM BURNUPS ASSUMING VARIOUS POWER FACTORS POWER FACTOR 100.% 95.% 90.% 85.% 80.% 75.% 70.% 65.%

TEN PPM BORON DATE 9/18/2002 9/27/2002 10,/ 7/2002 10/18/2002 10/31/2002 11/14/2002 11/30/2002 12/19/2002 DESIGN BURNUP DATE 9/21/2002 9/30/2002 10,110/2002 10/21/2002 11/ 3/2002 11/17/2002 12/ 4/2002 12/23/2002

PBNP UNIT 2 CYCLE 25 MARCH 2002 - BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 25 TOTAL CYCLE AVERAGE 1056. 15429. 34585.

REGION AVERAGE 223D 350. 4589. 48348.

224A 312. 4087. 39392.

225A 712. 10011. 39052.

225B 449. 6083. 43751.

226A 1127. 16441. 44651.

226B 1272. 18977. 42555.

227A 1353. 19863. 19863.

227B 1184. 17441. 17441.

CORE MWTHR 1128214. 16476480. 3E 932307.

DAYS IN PERIOD/CYCLE 31 470 POWER FACTOR 100.0% 96.2%

  • BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

.q PROJECTED EOL BURNUP 15838. 15823.

  • BASED 01O DAYS REMAINING UNTIL REFUELING DATE 3

ASSUMINC PERIOD OR CYCLE POWER FACTOR

  • EFUELINC SCHEDULE DATA SCHEDULED REFUELING DATE 4/13/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS BURNUP FOR CYCLE 25 (MWD/MTU) 16660. 16660. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS REMAINING EFFECTIVE FULL POWER DAYS 36.1 36.1 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON FRACTION OF CYCLE LIFE EXPENDED 92.6% 92.6% BASED ON CURRENT BORON FOLLOW RESULTS.

ESTIMATED DATE FOR DESIGN AND TEN PPM BURNUPS ASSUMING VARIOUS POWER FACTORS POWER FACTOR 100.% 95 . 90.% 85.% 80.% 75.% 70.% 65.%

TEN PPM BORON DATE 5/ 7/2002 5/ 8/2002 5/ /11/2002 5/13/2002 5/16/2002 5/19/2002 5/22/2002 5/26/2002 DESIGN BURNUP DATE 5/ 7/2002 5/ 8/2002 5/ /11/2002 5/13/2002 5/16/2002 5/19/2002 5/22/2002 5/26/2002

POINT BEACH SHIFT OPERATIONAL DATA

SUMMARY

March, 2002 I I Unit 1 1 Unit 2 1 DAY Gen X02 X04 X08 X27 Net MWhr Avg MWe I Gen X02 X04 X08 X27 Net MWhr Avg MWe 1 12590.0 482.0 37.0 1.5 6.0 12063.5 502.6 12790.0 467.0 30.0 1.5 6.0 12285.5 511.9 41.0 1.0 6.0 12098.0 504.1 12840.0 469.0 3.0 1.0 6.0 12361.0 515.0 2 12630.0 484.0 42.0 1.0 7.0 12076.0 503.2 12800.0 468.0 22.0 1.0 7.0 12302.0 512.6 3 12610.0 484.0 484.0 33.0 1.0 6.5 12035.5 501.5 12750.0 467.0 53.0 1.0 6.5 12222.5 509.3 4 12560.0 481.0 38.0 1.5 6.0 12063.5 502.6 12780.0 468.0 41.0 1.5 6.0 12263.5 511.0 5 12590.0 481.0 33.0 1.0 6.0 12129.0 505.4 12830.0 467.0 41.0 1.0 6.0 12315.0 513.1 6 12650.0 480.0 34.0 1.0 5.5 12099.5 504.1 12780.0 466.0 39.0 1.0 5.5 12268.5 511.2 7 12620.0 0.5 5.5 12126.0 505.2 12800.0 466.0 32.0 0.5 5.5 12296.0 512.3 8 12650.0 479.0 39.0 478.0 37.0 1.0 10.0 12124.0 505.2 12790.0 465.0 36.0 1.0 10.0 12278.0 511.6 9 12650.0 40.0 1.0 1.0 12127.0 505.3 12800.0 466.0 38.0 1.0 1.0 12294.0 512.2 10 12650.0 481.0 1.0 5.0 12157.0 506.5 12840.0 468.0 34.0 1.0 5.0 12332.0 513.8 11 12680.0 481.0 36.0 37.0 1.0 5.5 12156.5 506.5 12840.0 468.0 35.0 1.0 5.5 12330.5 513.8 12 12680.0 480.0 36.0 1.0 5.5 12168.5 507.0 12840.0 468.0 34.0 1.0 5.5 12331.5 513.8 13 12690.0 479.0 37.0 1.0 5.0 12127.0 505.3 12800.0 467.0 35.0 1.0 5.0 12292.0 512.2 14 12650.0 480.0 480.0 37.0 1.0 5.5 12146.5 506.1 12830.0 468.0 35.0 1.0 5.5 12320.5 513.4 15 12670.0 38.0 1.0 10.5 12131.5 505.5 12810.0 467.0 36.0 1.0 10.5 12295.5 512.3 16 12660.0 479.0 12660.0 478.0 36.0 1.0 0.0 12145.0 506.0 12820.0 467.0 32.0 1.0 0.0 12320.0 513.3 17 36.0 1.0 5.5 12117.5 504.9 12810.0 466.0 34.0 1.0 5.5 12303.5 512.6 18 12640.0 480.0 12640.0 479.0 36.0 1.5 5.0 12118.5 504.9 12710.0 462.0 46.0 1.5 5.0 12195.5 508.1 19 37.0 1.0 6.0 12127.0 505.3 12800.0 463.0 26.0 1.0 6.0 12304.0 512.7 20 12650.0 479.0 1.0 5.5 12127.5 505.3 12810.0 462.0 37.0 1.0 5.5 12304.5 512.7 21 12650.0 480.0 36.0 482.0 38.0 1.5 5.5 12143.0 506.0 12810.0 464.0 39.0 1.5 5.5 12300.0 512.5 22 12670.0 38.0 1.0 5.5 10251.5 427.1 12810.0 463.0 39.0 1.0 5.5 12301.5 512.6 23 10750.0 454.0 1.5 6.0 10767.5 448.6 12830.0 463.0 38.0 1.5 6.0 12321.5 513.4 24 11280.0 465.0 40.0 486.0 36.0 1.5 5.5 12051.0 502.1 12830.0 464.0 39.0 1.5 5.5 12320.0 513.3 25 12580.0 36.0 1.5 5.5 12168.0 507.0 12860.0 465.0 37.0 1.5 5.5 12351.0 514.6 26 12690.0 479.0 39.0 1.0 5.5 12127.5 505.3 12810.0 462.0 37.0 1.0 5.5 12304.5 512.7 27 12650.0 477.0 36.0 1.5 5.5 12166.0 506.9 12850.0 467.0 37.0 1.5 5.5 12339.0 514.1 28 12690.0 481.0 475.0 36.0 1.0 5.0 12143.0 506.0 12820.0 463.0 35.0 1.0 5.0 12316.0 513.2 29 12660.0 474.0 36.0 1.0 5.0 11964.0 498.5 12680.0 465.0 36.0 1.0 5.0 12173.0 507.2 30 12480.0 34.0 1.0 5.0 12065.0 502.7 12780.0 468.0 38.0 1.0 5.0 12268.0 511.2 31 12580.0 475.0 I i i MONTHLY TOTALS - UNIT 1 MONTHLY TOTALS - UNIT 2 Gross Generation: 388,500.0 MWhr Gross Generation: 396,950.0 MWhr Total Station Service: 16,189.0 MWhr Total Station Service: 15,740.0 MWhr Net Generation: 372,311.0 MWhr Net Generation: 381,210.0 MWhr Average Daily Power: 500.4 MWe Average Daily Power: 512.4 MWe

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 1 - MARCH 2002 ELECTRICAL UNITS MONTH YEAR CUMULATIVE GROSS GENERATION MWH 388,500.0 1,134,520.0 107,676,620.0 TOTAL STATION SERVICE MWH 16,189.0 46,909.5 5,013,489.5 NET OUTPUT MWH 372,311.0 1,087,610.5 102,663,130.5 AVG. GROSS GENERATION FOR MONTH MWH 522.2 525.2 391.2 AVG. GROSS GENERATION RUNNING MWH 522.2 525.2 484.5 TOTAL STATION SERVICE/GROSS GEN. 4.2% 4.1% 4.7%

HOURS OF GENERATION HRS 744.0 2,160.0 222,254.0 PLANT PERFORMANCE UNITS MONTH YEAR CUMULATIVE NET PLANT EFFICIENCY 3.74% 8.99% 31.48%

NET PLANT HEAT RATE BTU/KWH 91,161.0 37,944.0 10,840.1 NUMBER OF DAYS OF OPERATION DAYS 31 90 10,142 UNIT NET CAPACITY FACTOR 98.1% 98.7% 76.2%

UNIT SERVICE FACTOR 100.0% 100.0% 80.7%

SCHEDULED OUTAGES 0 0 126 FORCED OUTAGES 0 0 73 FORCED OUTAGE HOURS HRS 0.0 0.0 10,227.1 UNIT FORCED OUTAGE RATE 0.0% 0.0% 4.4%

NUCLEAR UNITS MONTH YEAR CUMULATIVE HOURS CRITICAL HRS 744.0 2,160.0 225,769.8 TOTAL HOURS POSSIBLE HRS 744.0 2,160.0 275,255.0 INADVERTANT REACTOR TRIPS 0 0 57 DURATION OF REACTOR DOWN TIME HRS 0.0 0.0 49,569.2 REACTOR CAPACITY FACTOR 880.3% 368.7% 78.0%

REACTOR SERVICE FACTOR 100.0% 100.0% 82.0%

THERMAL POWER GENERATED MWTHR 9,945,128.0 12,092,389.0 326,094,840.0 STHERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 10,963,862.0

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 2 - MARCH 2002 ELECTRICAL UNITS MONTH YEAR CUMULATIVE GROSS GENERATION MWH 396,950.0 1,087,270.0 106,815,310.0 TOTAL STATION SERVICE MWH 15,740.0 45,792.5 4,990,325.5 NET OUTPUT MWH 381,210.0 1,041,477.5 101,824,984.5 AVG. GROSS GENERATION FOR MONTH MWH 533.5 503.4 410.8 AVG. GROSS GENERATION RUNNING MWH 533.5 520.6 492.4 TOTAL STATION SERVICE/GROSS GEN. 4.0% 4.2% 4.7%

HOURS OF GENERATION HRS 744.0 2,088.3 216,942.5 PLANT PERFORMANCE UNITS MONTH YEAR CUMULATIVE NET PLANT EFFICIENCY 33.79% 33.43% 32.51%

NET PLANT HEAT RATE BTU/KWH 10,100.2 10,207.2 10,495.9 NUMBER OF DAYS OF OPERATION DAYS 31 90 9,180 UNIT NET CAPACITY FACTOR 100.1% 94.2% 79.8%

UNIT SERVICE FACTOR 100.0% 96.7% 83.4%

SCHEDULED OUTAGES 0 0 92 FORCED OUTAGES 0 1 59 FORCED OUTAGE HOURS HRS 0.0 71.7 4,901.0 UNIT FORCED OUTAGE RATE 0.0% 3.3% 2.2%

NUCLEAR UNITS MONTH YEAR CUMULATIVE HOURS CRITICAL HRS 744.0 2,099.3 219,880.9 TOTAL HOURS POSSIBLE HRS 744.0 2,160.0 260,040.0 INADVERTANT REACTOR TRIPS 0 0 50 DURATION OF REACTOR DOWN TIME HRS 0.0 60.7 40,159.1 REACTOR CAPACITY FACTOR 99.9% 95.0% 79.3%

REACTOR SERVICE FACTOR 100.0% 97.2% 84.6%

THERMAL POWER GENERATED MWTHR 1,128,214.0 3,114,956.0 313,163,373.0

ýTHERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 16,476,480.0

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE: 04/02/02 MONTH MARCH - 2002 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 503 11 507 21 505 2 504 12 507 22 506 3 503 13 507 23 427 4 501 14 505 24 449 5 503 15 506 25 502 6 505 16 505 26 507 7 504 17 506 27 505 8 505 18 505 28 507 9 505 19 505 29 506 10 505 20 505 30 499 31 503

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 AVERAGE DAILY UNIT POWER LEVEL DATE: 04/02/02 MONTH MARCH - 2002 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 512 11 514 21 513 2 515 12 514 22 513 3 513 13 514 23 513 4 509 14 512 24 513 5 511 15 513 25 513 6 513 16 512 26 515 7 511 17 513 27 513 8 512 18 513 28 514 9 512 19 508 29 513 10 512 20 513 30 507 31 511

Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0025 GL 97-02 April 15, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc: J. D. Loock, PSCW NRC Region Ill NRC Senior Resident Inspector NRC Project Manager

Docket 50-266 and 50-301 NRC-2002-0025 Bcc: R. A. Abdoo (WE) D. E. Day M. E. Reddemann K. E. Peveler R. A. Anderson(NMC) K. Kretzer G. A. Chamoff C. B. Jilek INPO Records Center A. J. Cayia R. G. Mende McGraw-Hill Companies R. R. Grigg (WE) R. M. Daflucas C. S. Smoker (NMC) T. E. Ruiz E. J. Weinkam IH (NMC) T. W. Hanna G. D. Strharsky R. R. Winget D. A. Weaver (WE) R. P. Pulec (KNPP) RSL File (3) B. D. Kemp T.H. Taylor File A-2

Docket 50-266 and 50-301 NRC-2002-0025 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated April 2, 2002 Re: Monthly Operating Report -March 2002

OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 04/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: March - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 530.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 510.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): n/a
10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 2,160.0 275,255.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 225,769.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ONLINE 744.0 2,160.0 222,254.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,118,820.0 3,266,081.0 317,268,532.0
17. GROSS ELECTRICAL ENERGY GENERATED 388,500.0 1,134,520.0 107,676,620.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 372,311.0 1,087,610.5 102,663,130.5
19. UNIT SERVICE FACTOR 100.0% 100.0% 80.7%
20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 81.1%
21. UNIT CAPACITY FACTOR (USING MDC NET) 98.1% 98.7% 76.2%
22. UNIT CAPACITY FACTOR (USING DER NET) 97.2% 97.8% 74.8%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 4.4%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 04/03/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 1 average daily power for the month of March was 500.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 04/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
2. REPORTING PERIOD: March - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 532.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): 0
10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 2,160.0 260,040.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,099.3 219,880.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ONLINE 744.0 2,088.3 216,942.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,214.0 3,114,956.0 313,163,373.0
17. GROSS ELECTRICAL ENERGY GENERATED 396,950.0 1,087,270.0 106,815,310.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 381,210.0 1,041,477.5 101,824,984.5
19. UNIT SERVICE FACTOR 100.0% 96.7% 83.4%
20. UNIT AVAILABILITY FACTOR 100.0% 96.7% 83.5%
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.1% 94.2% 79.8%
22. UNIT CAPACITY FACTOR (USING DER NET) 99.5% 93.6% 78.5%
23. UNIT FORCED OUTAGE RATE 0.0% 3.3% 2.2%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LET-'ER DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 04/03/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H Other (Explain)

SUMMARY

Unit 2 average daily power for the month of March was 512.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

PBNP UNIT I CYCLE 27 MARCH 2002 - BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 27 TOTAL CYCLE AVERAGE 1055. 10335. 30773.

REGION AVERAGE 126B 389. 3634. 39621.

127A 331. 3054. 44436.

127B 747. 7144. 47085.

128A 1237. 12321. 34238.

128B 1338. 13406. 33331.

129A 1426. 13802. 13802.

129B 1256. 12291. 12291.

CORE MWTHR 1118820. 10963862. 3 2644261.

DAYS IN PERIOD/CYCLE 31 322 POWER FACTOR 99.0% 93.4%

  • BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

PROJECTED EOL BURNUP 15983. 15664.

  • BASED ON DAYS REMAINING UNTIL REFUELING DATE ASSUMING PERIOD OR CYCLE POWER FACTOR REFUELINGSSCHEDULE DATA SCHEDULED REFUELING DATE 9/14/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS BURNUP FOR CYCLE 27 (MWD/MTU) 16285. 16200. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS REMAINING EFFECTIVE FULL POWER DAYS 173.2 170.7 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON FRACTION OF CYCLE LIFE EXPENDED 63.5% 63.8% BASED ON CURRENT BORON FOLLOW RESULTS.

ESTIMATED DATE FOR DESIGN AND TEN PPM BURNUPS ASSUMING VARIOUS POWER FACTORS POWER FACTOR 100.% 95.% 90.% 85.% 80.% 75.% 70.% 65.%

TEN PPM BORON DATE 9/18/2002 9/27/2002 10,/ 7/2002 10/18/2002 10/31/2002 11/14/2002 11/30/2002 12/19/2002 DESIGN BURNUP DATE 9/21/2002 9/30/2002 10,110/2002 10/21/2002 11/ 3/2002 11/17/2002 12/ 4/2002 12/23/2002

PBNP UNIT 2 CYCLE 25 MARCH 2002 - BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 25 TOTAL CYCLE AVERAGE 1056. 15429. 34585.

REGION AVERAGE 223D 350. 4589. 48348.

224A 312. 4087. 39392.

225A 712. 10011. 39052.

225B 449. 6083. 43751.

226A 1127. 16441. 44651.

226B 1272. 18977. 42555.

227A 1353. 19863. 19863.

227B 1184. 17441. 17441.

CORE MWTHR 1128214. 16476480. 3E 932307.

DAYS IN PERIOD/CYCLE 31 470 POWER FACTOR 100.0% 96.2%

  • BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

.q PROJECTED EOL BURNUP 15838. 15823.

  • BASED 01O DAYS REMAINING UNTIL REFUELING DATE 3

ASSUMINC PERIOD OR CYCLE POWER FACTOR

  • EFUELINC SCHEDULE DATA SCHEDULED REFUELING DATE 4/13/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS BURNUP FOR CYCLE 25 (MWD/MTU) 16660. 16660. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS REMAINING EFFECTIVE FULL POWER DAYS 36.1 36.1 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON FRACTION OF CYCLE LIFE EXPENDED 92.6% 92.6% BASED ON CURRENT BORON FOLLOW RESULTS.

ESTIMATED DATE FOR DESIGN AND TEN PPM BURNUPS ASSUMING VARIOUS POWER FACTORS POWER FACTOR 100.% 95 . 90.% 85.% 80.% 75.% 70.% 65.%

TEN PPM BORON DATE 5/ 7/2002 5/ 8/2002 5/ /11/2002 5/13/2002 5/16/2002 5/19/2002 5/22/2002 5/26/2002 DESIGN BURNUP DATE 5/ 7/2002 5/ 8/2002 5/ /11/2002 5/13/2002 5/16/2002 5/19/2002 5/22/2002 5/26/2002

POINT BEACH SHIFT OPERATIONAL DATA

SUMMARY

March, 2002 I I Unit 1 1 Unit 2 1 DAY Gen X02 X04 X08 X27 Net MWhr Avg MWe I Gen X02 X04 X08 X27 Net MWhr Avg MWe 1 12590.0 482.0 37.0 1.5 6.0 12063.5 502.6 12790.0 467.0 30.0 1.5 6.0 12285.5 511.9 41.0 1.0 6.0 12098.0 504.1 12840.0 469.0 3.0 1.0 6.0 12361.0 515.0 2 12630.0 484.0 42.0 1.0 7.0 12076.0 503.2 12800.0 468.0 22.0 1.0 7.0 12302.0 512.6 3 12610.0 484.0 484.0 33.0 1.0 6.5 12035.5 501.5 12750.0 467.0 53.0 1.0 6.5 12222.5 509.3 4 12560.0 481.0 38.0 1.5 6.0 12063.5 502.6 12780.0 468.0 41.0 1.5 6.0 12263.5 511.0 5 12590.0 481.0 33.0 1.0 6.0 12129.0 505.4 12830.0 467.0 41.0 1.0 6.0 12315.0 513.1 6 12650.0 480.0 34.0 1.0 5.5 12099.5 504.1 12780.0 466.0 39.0 1.0 5.5 12268.5 511.2 7 12620.0 0.5 5.5 12126.0 505.2 12800.0 466.0 32.0 0.5 5.5 12296.0 512.3 8 12650.0 479.0 39.0 478.0 37.0 1.0 10.0 12124.0 505.2 12790.0 465.0 36.0 1.0 10.0 12278.0 511.6 9 12650.0 40.0 1.0 1.0 12127.0 505.3 12800.0 466.0 38.0 1.0 1.0 12294.0 512.2 10 12650.0 481.0 1.0 5.0 12157.0 506.5 12840.0 468.0 34.0 1.0 5.0 12332.0 513.8 11 12680.0 481.0 36.0 37.0 1.0 5.5 12156.5 506.5 12840.0 468.0 35.0 1.0 5.5 12330.5 513.8 12 12680.0 480.0 36.0 1.0 5.5 12168.5 507.0 12840.0 468.0 34.0 1.0 5.5 12331.5 513.8 13 12690.0 479.0 37.0 1.0 5.0 12127.0 505.3 12800.0 467.0 35.0 1.0 5.0 12292.0 512.2 14 12650.0 480.0 480.0 37.0 1.0 5.5 12146.5 506.1 12830.0 468.0 35.0 1.0 5.5 12320.5 513.4 15 12670.0 38.0 1.0 10.5 12131.5 505.5 12810.0 467.0 36.0 1.0 10.5 12295.5 512.3 16 12660.0 479.0 12660.0 478.0 36.0 1.0 0.0 12145.0 506.0 12820.0 467.0 32.0 1.0 0.0 12320.0 513.3 17 36.0 1.0 5.5 12117.5 504.9 12810.0 466.0 34.0 1.0 5.5 12303.5 512.6 18 12640.0 480.0 12640.0 479.0 36.0 1.5 5.0 12118.5 504.9 12710.0 462.0 46.0 1.5 5.0 12195.5 508.1 19 37.0 1.0 6.0 12127.0 505.3 12800.0 463.0 26.0 1.0 6.0 12304.0 512.7 20 12650.0 479.0 1.0 5.5 12127.5 505.3 12810.0 462.0 37.0 1.0 5.5 12304.5 512.7 21 12650.0 480.0 36.0 482.0 38.0 1.5 5.5 12143.0 506.0 12810.0 464.0 39.0 1.5 5.5 12300.0 512.5 22 12670.0 38.0 1.0 5.5 10251.5 427.1 12810.0 463.0 39.0 1.0 5.5 12301.5 512.6 23 10750.0 454.0 1.5 6.0 10767.5 448.6 12830.0 463.0 38.0 1.5 6.0 12321.5 513.4 24 11280.0 465.0 40.0 486.0 36.0 1.5 5.5 12051.0 502.1 12830.0 464.0 39.0 1.5 5.5 12320.0 513.3 25 12580.0 36.0 1.5 5.5 12168.0 507.0 12860.0 465.0 37.0 1.5 5.5 12351.0 514.6 26 12690.0 479.0 39.0 1.0 5.5 12127.5 505.3 12810.0 462.0 37.0 1.0 5.5 12304.5 512.7 27 12650.0 477.0 36.0 1.5 5.5 12166.0 506.9 12850.0 467.0 37.0 1.5 5.5 12339.0 514.1 28 12690.0 481.0 475.0 36.0 1.0 5.0 12143.0 506.0 12820.0 463.0 35.0 1.0 5.0 12316.0 513.2 29 12660.0 474.0 36.0 1.0 5.0 11964.0 498.5 12680.0 465.0 36.0 1.0 5.0 12173.0 507.2 30 12480.0 34.0 1.0 5.0 12065.0 502.7 12780.0 468.0 38.0 1.0 5.0 12268.0 511.2 31 12580.0 475.0 I i i MONTHLY TOTALS - UNIT 1 MONTHLY TOTALS - UNIT 2 Gross Generation: 388,500.0 MWhr Gross Generation: 396,950.0 MWhr Total Station Service: 16,189.0 MWhr Total Station Service: 15,740.0 MWhr Net Generation: 372,311.0 MWhr Net Generation: 381,210.0 MWhr Average Daily Power: 500.4 MWe Average Daily Power: 512.4 MWe

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 1 - MARCH 2002 ELECTRICAL UNITS MONTH YEAR CUMULATIVE GROSS GENERATION MWH 388,500.0 1,134,520.0 107,676,620.0 TOTAL STATION SERVICE MWH 16,189.0 46,909.5 5,013,489.5 NET OUTPUT MWH 372,311.0 1,087,610.5 102,663,130.5 AVG. GROSS GENERATION FOR MONTH MWH 522.2 525.2 391.2 AVG. GROSS GENERATION RUNNING MWH 522.2 525.2 484.5 TOTAL STATION SERVICE/GROSS GEN. 4.2% 4.1% 4.7%

HOURS OF GENERATION HRS 744.0 2,160.0 222,254.0 PLANT PERFORMANCE UNITS MONTH YEAR CUMULATIVE NET PLANT EFFICIENCY 3.74% 8.99% 31.48%

NET PLANT HEAT RATE BTU/KWH 91,161.0 37,944.0 10,840.1 NUMBER OF DAYS OF OPERATION DAYS 31 90 10,142 UNIT NET CAPACITY FACTOR 98.1% 98.7% 76.2%

UNIT SERVICE FACTOR 100.0% 100.0% 80.7%

SCHEDULED OUTAGES 0 0 126 FORCED OUTAGES 0 0 73 FORCED OUTAGE HOURS HRS 0.0 0.0 10,227.1 UNIT FORCED OUTAGE RATE 0.0% 0.0% 4.4%

NUCLEAR UNITS MONTH YEAR CUMULATIVE HOURS CRITICAL HRS 744.0 2,160.0 225,769.8 TOTAL HOURS POSSIBLE HRS 744.0 2,160.0 275,255.0 INADVERTANT REACTOR TRIPS 0 0 57 DURATION OF REACTOR DOWN TIME HRS 0.0 0.0 49,569.2 REACTOR CAPACITY FACTOR 880.3% 368.7% 78.0%

REACTOR SERVICE FACTOR 100.0% 100.0% 82.0%

THERMAL POWER GENERATED MWTHR 9,945,128.0 12,092,389.0 326,094,840.0 STHERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 10,963,862.0

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 2 - MARCH 2002 ELECTRICAL UNITS MONTH YEAR CUMULATIVE GROSS GENERATION MWH 396,950.0 1,087,270.0 106,815,310.0 TOTAL STATION SERVICE MWH 15,740.0 45,792.5 4,990,325.5 NET OUTPUT MWH 381,210.0 1,041,477.5 101,824,984.5 AVG. GROSS GENERATION FOR MONTH MWH 533.5 503.4 410.8 AVG. GROSS GENERATION RUNNING MWH 533.5 520.6 492.4 TOTAL STATION SERVICE/GROSS GEN. 4.0% 4.2% 4.7%

HOURS OF GENERATION HRS 744.0 2,088.3 216,942.5 PLANT PERFORMANCE UNITS MONTH YEAR CUMULATIVE NET PLANT EFFICIENCY 33.79% 33.43% 32.51%

NET PLANT HEAT RATE BTU/KWH 10,100.2 10,207.2 10,495.9 NUMBER OF DAYS OF OPERATION DAYS 31 90 9,180 UNIT NET CAPACITY FACTOR 100.1% 94.2% 79.8%

UNIT SERVICE FACTOR 100.0% 96.7% 83.4%

SCHEDULED OUTAGES 0 0 92 FORCED OUTAGES 0 1 59 FORCED OUTAGE HOURS HRS 0.0 71.7 4,901.0 UNIT FORCED OUTAGE RATE 0.0% 3.3% 2.2%

NUCLEAR UNITS MONTH YEAR CUMULATIVE HOURS CRITICAL HRS 744.0 2,099.3 219,880.9 TOTAL HOURS POSSIBLE HRS 744.0 2,160.0 260,040.0 INADVERTANT REACTOR TRIPS 0 0 50 DURATION OF REACTOR DOWN TIME HRS 0.0 60.7 40,159.1 REACTOR CAPACITY FACTOR 99.9% 95.0% 79.3%

REACTOR SERVICE FACTOR 100.0% 97.2% 84.6%

THERMAL POWER GENERATED MWTHR 1,128,214.0 3,114,956.0 313,163,373.0

ýTHERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 16,476,480.0

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE: 04/02/02 MONTH MARCH - 2002 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 503 11 507 21 505 2 504 12 507 22 506 3 503 13 507 23 427 4 501 14 505 24 449 5 503 15 506 25 502 6 505 16 505 26 507 7 504 17 506 27 505 8 505 18 505 28 507 9 505 19 505 29 506 10 505 20 505 30 499 31 503

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 AVERAGE DAILY UNIT POWER LEVEL DATE: 04/02/02 MONTH MARCH - 2002 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 512 11 514 21 513 2 515 12 514 22 513 3 513 13 514 23 513 4 509 14 512 24 513 5 511 15 513 25 513 6 513 16 512 26 515 7 511 17 513 27 513 8 512 18 513 28 514 9 512 19 508 29 513 10 512 20 513 30 507 31 511