Letter Sequence Approval |
---|
|
|
MONTHYEARML0515203442005-05-31031 May 2005 Tech Spec Pages for Millstone, Unit 3, License Amendment 222 Regarding Quench Spray and Recirculation Spray Nozzle Surveillance Project stage: Approval ML0506700282005-05-31031 May 2005 License Amendment 222 Regarding Quench Spray and Recirculation Spray Nozzle Surveillance Project stage: Approval 2005-05-31
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits 2024-09-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23058A4542023-03-16016 March 2023 Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints ML23005A1702023-01-17017 January 2023 Correction to Issuance of Amendment No. 283 to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definition ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML22007A1512022-02-16016 February 2022 Issuance of Amendment No. 282 Regarding Shutdown Bank Technical Specification Requirements and Alternate Control Rod Position Monitoring Requirements ML21326A0992022-01-0707 January 2022 Issuance of Amendment No. 281 Regarding Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21262A0012021-11-0909 November 2021 Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident ML21222A2302021-09-0909 September 2021 Issuance of Amendment No. 343 Revision to Technical Specifications for Steam Generator Inspection Frequency (L-2020-LLA-0227) ML21043A1622021-03-25025 March 2021 Issuance of Amendment No. 278 Regarding Revision to Battery Surveillance Requirements ML21026A1422021-02-23023 February 2021 Issuance of Amendment No. 342 Revision to Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML20161A0002020-07-15015 July 2020 Issuance of Amendment No. 276 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML20140A3692020-06-24024 June 2020 Issuance of Amendment No. 339 Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19340A0252020-01-30030 January 2020 Issuance of Amendment No. 337 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components of Nuclear Power Reactors ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19150A3672019-05-30030 May 2019 Current Facility Operating License No. DPR-21, Tech Specs, Revised 5/30/2019 ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18246A0072018-09-25025 September 2018 Issuance of Amendment No. 335 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML18038B2002018-02-26026 February 2018 Issuance of Amendment Nos. 118, 334, and 271 to Revise Licensee'S Name (CAC Nos. MF9844, MF9845, and MF9848; EPID L-2017-LLA-0245 and EPID L-2017-LLA-0346) ML17025A2182017-01-24024 January 2017 Issuance of Amendment Realistic Large Break Loss-of-Coolant Accident Analysis ML16308A4852016-12-22022 December 2016 Issuance of Amendment No. 331 Revision to Emergency Core Cooling System Technical Specification and Final Safety Analysis Report Ch. 14 to Remove Charging ML16249A0012016-09-30030 September 2016 Issuance of Amendments Small Break Loss of Coolant Accident Reanalysis ML16206A0012016-08-0404 August 2016 Issuance of Amendment No. 270 to Revise Technical Specification 5.6.3, Fuel Storage Capacity ML16193A0012016-07-28028 July 2016 Issuance of Amendments Removal of Severe Line Outage Detection from the Offsite Power System ML16131A7282016-07-28028 July 2016 Issuance of Amendment 268 Adopting Dominion Core Design and Safety Analysis Methods and Addressing the Issues Identified in Three Westinghouse Communication Documents ML16189A0762016-06-29029 June 2016 Supplement to Information Regarding License Amendment Request for Removal of Severe Line Outage Detection from the Offsite Power System ML16003A0082016-06-23023 June 2016 Issuance of Amendment No. 327 Proposed Technical Specification Changes for Spent Fuel Storage ML16068A3122016-03-31031 March 2016 Issuance of Amendment No. 326 to Revise Technical Specifications for Containment Leak Rate Testing ML16011A4002016-01-29029 January 2016 Issuance of Amendments Nos. 325 and 267 to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15288A0042015-11-30030 November 2015 Issuance of Amendment No. 266: Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times ML15280A2422015-10-29029 October 2015 Issuance of Amendment No. 324 Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, Adoption of TSTF-425,Rev 3 ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15225A0102015-08-28028 August 2015 Issuance of Amendment No. 264 Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15246A1422015-08-27027 August 2015 Connecticut, Inc. Millstone Power Station Unit 3 Supplement to License Amendment Request to Revise Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15225A0082015-08-26026 August 2015 Issuance of Amendment No. 322 Revision to the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds ML15187A3262015-07-29029 July 2015 Issuance of Amendment No. 321, Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C ML15187A1862015-07-28028 July 2015 Issuance of Amendment No. 263, Regarding Technical Specification Changes to Auxiliary Feedwater System (MF4692) ML15187A0112015-07-27027 July 2015 Issuance of Amendment No. 262, Refueling Water Storage Tank Allowable Temperatures ML15093A0022015-05-20020 May 2015 Issuance of Amendment No. 320, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15098A0342015-05-20020 May 2015 Issuance of Amendment No. 261, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15093A4412015-05-18018 May 2015 Issuance of Amendment No. 319, Use of Areva M5 Alloy Clad Fuel Assemblies ML14178A5992014-07-11011 July 2014 Issuance of Amendment Proposed Changes to Technical Specification 3/4 7.5, Ultimate Heat Sink (Tac MF1780) 2024-06-04
[Table view] Category:Safety Evaluation
MONTHYEARML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23058A4542023-03-16016 March 2023 Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22201A5082022-07-28028 July 2022 Authorization and Safety Evaluation for Alternative Request No. IR-04-09 ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22039A3392022-03-0303 March 2022 Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements in the Fourth 10-year Valve Inservice Testing Program ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML22007A1512022-02-16016 February 2022 Issuance of Amendment No. 282 Regarding Shutdown Bank Technical Specification Requirements and Alternate Control Rod Position Monitoring Requirements ML21326A0992022-01-0707 January 2022 Issuance of Amendment No. 281 Regarding Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21262A0012021-11-0909 November 2021 Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate ML21284A0062021-10-29029 October 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-04 and IR-4-02 ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident ML21222A2302021-09-0909 September 2021 Issuance of Amendment No. 343 Revision to Technical Specifications for Steam Generator Inspection Frequency (L-2020-LLA-0227) ML21174A0202021-08-0202 August 2021 Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML21167A3552021-07-16016 July 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-06 ML21167A2112021-06-30030 June 2021 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088) ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML21043A1622021-03-25025 March 2021 Issuance of Amendment No. 278 Regarding Revision to Battery Surveillance Requirements ML21026A1422021-02-23023 February 2021 Issuance of Amendment No. 342 Revision to Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20312A0022020-12-10010 December 2020 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) ML20312A0012020-12-10010 December 2020 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML20287A4712020-10-20020 October 2020 Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML20189A2062020-07-16016 July 2020 Relief Request IR-4-03 Concerning Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping ML20161A0002020-07-15015 July 2020 Issuance of Amendment No. 276 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML20140A3692020-06-24024 June 2020 Issuance of Amendment No. 339 Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML20080K5082020-03-24024 March 2020 Alternative Request RR-05-03 for the Fifth 10-Year Inservice Inspection Interval ML19340A0252020-01-30030 January 2020 Issuance of Amendment No. 337 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components of Nuclear Power Reactors ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19340A0012019-12-18018 December 2019 Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19338G3722019-12-18018 December 2019 Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval ML19340A0002019-12-13013 December 2019 Relief Request IR-3-39, Proposed Alternative to ASME Code Weld Preheat Requirements ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18290A6022018-11-13013 November 2018 Alternative Requests Related to the Fifth and Fourth 10-Year Interval Pump, Valve, and Snubber Inservice Testing Programs, Respectively (EPID L-2018-LLR- 0012 Through EPID L-2018-LLR-0022) ML18275A0122018-10-0404 October 2018 Alternative Request P-06 for the 'C' Charging Pump Test Frequency ML18246A0072018-09-25025 September 2018 Issuance of Amendment No. 335 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML18252A0032018-09-17017 September 2018 Alternative Requests RR-04-27 and IR-3-38 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography 2024-06-04
[Table view] |
Text
May 31, 2005 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 3 - ISSUANCE OF AMENDMENT RE: QUENCH SPRAY AND RECIRCULATION SPRAY NOZZLE SURVEILLANCE (TAC NO. MC4743)
Dear Mr. Christian:
The Commission has issued the enclosed Amendment No. 222 to Facility Operating License No. NPF-49 for the Millstone Power Station, Unit No. 3, in response to your application dated September 7, 2004.
The amendment revises the required frequency of quench and recirculation spray nozzle surveillances from once every 10 years to following maintenance which could result in nozzle blockage. The proposed change also revises wording to correct grammar.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
George Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosures:
- 1. Amendment No. 222 to NPF-49
- 2. Safety Evaluation cc w/encls: See next page
Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 3 - ISSUANCE OF AMENDMENT RE: QUENCH SPRAY AND RECIRCULATION SPRAY NOZZLE SURVEILLANCE (TAC NO. MC4743)
Dear Mr. Christian:
The Commission has issued the enclosed Amendment No. 222 to Facility Operating License No. NPF-49 for the Millstone Power Station, Unit No. 3, in response to your application dated September 7, 2004.
The amendment revises the required frequency of quench and recirculation spray nozzle surveillances from once every 10 years to following maintenance which could result in nozzle blockage. The proposed change also revises wording to correct grammar.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
George Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosures:
- 1. Amendment No. 222 to NPF-49
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC OGC PDI-2 R/F ACRS CHolden CRaynor CAnderson, RI RLobel GHill (2) TBoyce DRoberts GWunder Amendment: ML050670028 Package: Tech Specs:
OFFICE PDI-2/PM PDI-2/LA SPSB/SC* OGC PDI-2/SC NAME GWunder CRaynor RDennig DCummings JBoska for DRoberts DATE 4/14/05 4/14/05 02/28/05 3/27/05 5/27/05 OFFICIAL RECORD COPY
DOMINION NUCLEAR CONNECTICUT, INC., ET AL.
DOCKET NO. 50-423 MILLSTONE POWER STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 222 License No. NPF-49
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Dominion Nuclear Connecticut, Inc. dated September 7, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 222, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated in the license. Dominion Nuclear Connecticut, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of issuance, and shall be implemented within 180 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by JBoska for/
Darrell J. Roberts, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: May 31, 2005
ATTACHMENT TO LICENSE AMENDMENT NO. 222 FACILITY OPERATING LICENSE NO. NPF-49 DOCKET NO. 50-423 Replace the following pages of the Appendix A Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3/4 6-12 3/4 6-12 3/4 6-13 3/4 6-13
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 222 TO FACILITY OPERATING LICENSE NO. NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION, UNIT NO. 3 DOCKET NO. 50-423
1.0 INTRODUCTION
By letter dated September 7, 2004, Dominion Nuclear Connecticut, Inc. (the licensee),
submitted a request for changes to the Millstone Power Station, Unit No. 3 (MP3) Technical Specifications (TSs). The requested change revises the required frequency of quench and recirculation spray nozzle surveillances from once every 10 years to following maintenance which could result in nozzle blockage. The proposed change also revises wording to correct grammatical errors.
2.0 REGULATORY EVALUATION
Part 50 of Title 10 of the Code of Federal Regulations Appendix A contains General Design Criteria (GDC) for nuclear power reactors. In particular, GDC-40 requires that the containment heat removal system be designed to permit periodic testing. The quench spray system (QSS) and the recirculation spray system (RSS) are containment heat removal systems.
The Westinghouse Standard Technical Specifications, NUREG-1431, Volume 1, Revision 3, dated June 2004, Surveillance Requirement (SR) 3.6.6.D.5 specifies a testing frequency of 10 years for the QSS nozzle blockage test. SR 3.6.6.E.7 specifies a testing frequency of 10 years for the RSS nozzle blockage test. This frequency has been the Nuclear Regulatory Commissions (NRC or the Commission) and industrys judgment of an acceptable frequency for this test and this is the frequency currently required by the MP3 TSs.
The NRC has approved, on a plant-specific basis, several revisions to this requirement. The revisions require verification that each spray nozzle is unobstructed only following maintenance which could potentially result in nozzle blockage. This is based on the judgment that once the containment spray system nozzles are determined to be unobstructed, the only mechanism which can cause nozzle blockage is foreign material introduced following maintenance if the licensees foreign material exclusion (FME) program is not effective. This is substantiated by operational experience, as discussed below.
3.0 TECHNICAL EVALUATION
The MP3 containment heat removal system, as described in Section 6.2.2 of the MP3 Updated Final Safety Analysis Report (UFSAR) consists of the QSS and the RSS. The QSS has two safety functions. It removes heat from the containment atmosphere following a design basis loss-of-coolant accident (LOCA) or main steam line break accident inside containment. This reduces the driving force for containment leakage and ensures the containment structural limits are not exceeded. The QSS also removes iodine and other radionuclides from the containment atmosphere following a LOCA. The QSS consists of two trains with each train consisting of one pump and one 360-degree spray header. One quench spray header has 192 nozzles and the other header has 70 nozzles.
The RSS maintains the containment at approximately subatmospheric pressure after the initial depressurization. The RSS has the additional safety function of extended core cooling. The RSS consists of two trains with each train consisting of two recirculation coolers, two pumps, one dewatering pump and one 360-degree spray header. The upper recirculation spray header contains 160 nozzles and the lower spray header contains 162 nozzles.
The MP3 UFSAR states that the containment heat removal systems are constructed entirely of corrosion-resistant materials, primarily stainless steel. Thus, clogging by rust or other corrosion products is not an issue. The nozzle orifices will pass particles less than 0.375 inches in diameter. The fine mesh on the screens of the emergency sump, which supplies the recirculation spray pumps, is smaller (3/32 inch). The spray nozzles are made of corrosion-resistant stainless steel.
Each QSS discharge line contains a check valve inside containment and a motor operated valve outside containment. Small diameter drain lines, located downstream of the check valves within the containment, drain the quench spray headers should any water enter the headers during periodic testing. The UFSAR states that the size of the drain lines does not significantly decrease the capacity of the QSS during operation.
MP3 TS SR 3.6.2.1 currently requires a test every 10 years to ensure that the QSS nozzles are not obstructed. TS SR 3.6.2.2 contains a similar surveillance requirement for the RSS nozzles.
The test is currently done, according to the licensees September 7, 2004, letter, with the respective spray pump isolation valves shut and air admitted by means of a temporary flange on a downstream check valve in each line.
One postulated mode of blockage of the spray headers and nozzles is solid boric acid accumulation in the spray lines or nozzles due to evaporated borated water. This could occur following an inadvertent containment spray actuation. The licensee states that the spray headers are normally maintained dry. Should there be inadvertent flow through the nozzles, such as a spurious actuation, the licensee would evaluate the need for remedial actions or flow testing as required by the proposed TS surveillances.
The other possible blockage source is debris (foreign material) in the system. The licensees September 7, 2004, letter describes the MP3 FME program. The program is consistent with expected standards for system cleanliness and provides high confidence that debris will not be introduced during times when the QSS or RSS boundaries are breached for maintenance or testing.
Performance History at MP3 The licensees September 7, 2004, letter describes the past testing done to ensure that the containment spray nozzles are unobstructed. Pre-operational tests and tests performed since start-up have confirmed that no blockage existed in the quench and recirculation system spray lines.
The licensee described the operating experience since the last tests as follows:
A review of maintenance history on the QSS and the RSS was performed, and work that occurred since the last air/smoke tests on the systems resulted in minor issues with respect to cleanliness. In fact, two issues that were identified both involved the rotation of the spectacle flanges downstream of the QSS and RSS check valves which are used for other testing activities. Both issues identified that grafoil pieces (used for gasketing material) were found within the pipe during check valve inspections. The amount of grafoil was insignificant and would not have impacted the ability of the QSS and the RSS systems to perform their safety functions.
The staff finds that the MP3 operating experience supports the requested amendment.
Industry Experience and Failure Mechanisms Review of industry experience using the NRCs Sequence Coding and Search System for Licensee Event Reports indicates that spray systems of similar design are not susceptible to plugging. The staff reviewed industry experience and found that, with a few exceptions, once tested after construction, containment spray nozzles have not been subject to blockage. There have been several exceptions. In the case of one pressurized water reactor (PWR), a chemical added to the inner surface of a spray system pipe to eliminate corrosion detached and the loose material blocked some spray nozzles. Spray piping in PWRs, and MP3 in particular, is corrosion resistant; therefore, this failure mechanism is not applicable to MP3. The licensee for another PWR found debris, identified as construction debris, in the spray nozzle headers. The fraction of blockage was not significant and the sprays remained functional. The debris was found by visual observation, not by an air flow test.
The licensee also requested an editorial change to TS SR 4.6.2.1.a to make it grammatically correct. The change will revise the wording: At least once per 31 days: to: At least once per 31 days, by: The staff agrees that this is more appropriate and is, therefore, acceptable.
4.0
SUMMARY
The spray system is constructed from corrosion-resistant materials; therefore, it is not likely that corrosion products will clog the system. Industry operating experience indicates that systems similar to that at MP3 are not susceptible to plugging under normal operating conditions. The staff, therefore, finds that the licensees proposal to inspect the quench spray nozzles only after maintenance that could result in foreign material being introduced into the system to be acceptable.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Connecticut State official was notified of the proposed issuance of the amendment. The State official agreed with the staffs assessment.
6.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (69 FR 70715). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: R. Lobel Date: May 31, 2005 Millstone Power Station, Unit No. 3 cc:
Lillilan M. Cuoco, Esquire Building 475, 5th Floor Senior Counsel Rope Ferry Road Dominion Resources Services, Inc. Waterford, CT 06385
Edward L. Wilds, Jr., Ph.D. Site Vice President Director, Division of Radiation Dominion Nuclear Connecticut, Inc.
Department of Environmental Protection Building 475, 5th Floor 79 Elm Street Rope Ferry Road Hartford, CT 06106-5127 Waterford, CT 06385 Regional Administrator, Region I Mr. Chris Funderburk U.S. Nuclear Regulatory Commission Director, Nuclear Licensing and 475 Allendale Road Operations Support King of Prussia, PA 19406 Dominion Resources Services, Inc.
5000 Dominion Boulevard First Selectmen Glen Allen, VA 23060-6711 Town of Waterford 15 Rope Ferry Road Mr. David W. Dodson Waterford, CT 06385 Licensing Supervisor Dominion Nuclear Connecticut, Inc.
Mr. John Markowicz Building 475, 5th Floor Co-Chair Rope Ferry Road Nuclear Energy Advisory Council Waterford, CT 06385 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price