ML030580571
Jump to navigation
Jump to search
| ML030580571 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/24/2003 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MB4282 | |
| Download: ML030580571 (1) | |
Text
Containment Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.6.6.7 Verify each containment spray pump starts automatically on an actual or simulated actuation signal.
SR 3.6.6.8 Verify each containment cooling fan starts automatically on an actual or simulated actuation signal.
FREQUENCY 18 months 18 months SR 3.6.6.9 Verify each spray nozzle is unobstructed.
Following maintenance which could result in nozzle blockage Amendment No. 489, 211 Palisades Nuclear Plant I I 1
I 3.6.6-3