ML030580571

From kanterella
Jump to navigation Jump to search

Technical Specification Pages for Amendment No. 211, Revise Testing Frequency for Containment Spray Nozzles
ML030580571
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/24/2003
From:
NRC/NRR/DLPM
To:
References
TAC MB4282
Download: ML030580571 (1)


Text

Containment Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.6.6.7 Verify each containment spray pump starts automatically on an actual or simulated actuation signal.

SR 3.6.6.8 Verify each containment cooling fan starts automatically on an actual or simulated actuation signal.

FREQUENCY 18 months 18 months SR 3.6.6.9 Verify each spray nozzle is unobstructed.

Following maintenance which could result in nozzle blockage Amendment No. 489, 211 Palisades Nuclear Plant I I 1

I 3.6.6-3