MONTHYEARML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18347B3592019-01-11011 January 2019 12-13-18-License Transfer Conforming Amendment Markup ML18253A2022018-10-11011 October 2018 Conforming License Amendment Approval of License Transfer Request(License DPR-28, Docket 50-271 and 72-59) ML18156A1812018-08-15015 August 2018 ISFSI Only Tech Spec Amendment Package ML16014A1692016-03-14014 March 2016 Vermont Yankee Nuclear Power Station - Issuance of Amendment No. 265 to Renewed Facility Operating License Re: Cyber Security Plan Implementation Schedule (CAC No. MF6403) ML15117A5512015-10-0707 October 2015 Issuance of Amendment for Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML14304A5882015-02-12012 February 2015 Issuance of Amendment No. 261, Revise Technical Specifications to Eliminate Certain Requirements During Movement of Irradiated Fuel and Core Alterations Consistent with TSTF-51 ML14346A0652015-02-0404 February 2015 Issuance of Amendment No. 261, Revise Site Emergency Plan for Permanently Defueled Condition to Reflect Change in On-Shift Staffing and Emergency Response Staffing ML14217A0722014-12-22022 December 2014 Issuance of Amendment No. 260, Revise and Remove Certain Requirements from Technical Specification Section 6.0, Administrative Controls, No Longer Applicable for Its Permanently Defueled Condition BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 ML13212A2012013-08-15015 August 2013 Issuance of Amendment No. 258 Change to Licensing Basis Regarding Station Blackout BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves ML0917400402009-07-13013 July 2009 License Amendment, Relocation of Reactor Building Crane Technical Specification BVY 09-035, Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages2009-05-20020 May 2009 Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages ML0901206582009-02-11011 February 2009 Issuance of Amendment Battery Systems BVY 08-084, Technical Specifications Proposed Change No. 273, Supplement 5, Response to Request for Additional Information2008-12-18018 December 2008 Technical Specifications Proposed Change No. 273, Supplement 5, Response to Request for Additional Information BVY 08-075, Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 22008-12-15015 December 2008 Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 2 BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-062, Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information2008-09-15015 September 2008 Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-047, Technical Specification Proposed Change No. 276, Response to Request for Additional Information2008-07-29029 July 2008 Technical Specification Proposed Change No. 276, Response to Request for Additional Information ML0817601182008-06-23023 June 2008 Technical Specifications, Amendments to Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits ML0811201212008-04-17017 April 2008 Technical Specifications, Amendment No. 231 ML0806602032008-02-12012 February 2008 Vermont Yankee, Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits ML0708607332007-03-26026 March 2007 Technical Specifications, Modify Requirements for Inoperable Snubbers by Relocating the Current TS Requirements Limiting Condition for Operation (LCO) 3.6.1 and Surveillance Requirement (SR) 4.6.1 ML0629103402006-08-28028 August 2006 Correction to Technical Specification Page 255 Amendment No. 226 BVY 06-067, Correction to Technical Specification Page2006-07-27027 July 2006 Correction to Technical Specification Page ML0603901072006-03-0202 March 2006 Vermont Yankee, Tech Spec Pages for Amendment 229 Regarding Extended Power Uprate BVY 06-018, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages2006-02-22022 February 2006 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages ML0604101192006-02-0303 February 2006 2006/02/03-Vermont Yankee - Technical Specification Proposed Change No. 263 Extended Power Uprate - Regulatory Commitment Information Regarding Potential Adverse Flow Effects BVY 05-105, Vermont Yankee Nuclear Power Station Correction to Technical Specifications Pages2005-12-12012 December 2005 Vermont Yankee Nuclear Power Station Correction to Technical Specifications Pages ML0526400902005-09-20020 September 2005 Technical Specifications, Drywell Spray Header and Nozzle Air Test Frequency BVY 05-083, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 32 Extended Power Uprate - Additional Information2005-09-10010 September 2005 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 32 Extended Power Uprate - Additional Information ML0522800592005-08-15015 August 2005 Tech Spec Pages for Amendment 226 Administrative Changes ML0519202762005-07-0707 July 2005 Tech Spec Pages for Amendment 225 Regarding Extend Intermediate Range Monitor Surveillance Test Frequencies ML0519202462005-06-30030 June 2005 Attachment 1 - Response to Request for Additional Information - Instrumentation Technical Specifications, Vermont Nuclear Power Station, Technical Specifications BVY 05-032, Vermont Nuclear Power Station - Response to Request for Additional Information Regarding Intermediate Range Monitor Surveillance Test Frequencies2005-03-31031 March 2005 Vermont Nuclear Power Station - Response to Request for Additional Information Regarding Intermediate Range Monitor Surveillance Test Frequencies ML0509003992005-03-29029 March 2005 Technical Specification Pages Re Alternative Source Term ML0508004322005-03-16016 March 2005 TS Pages for Amendment 221 to License DPR-28, Relocating Current Definition of Surveillance Frequency to New Technical Specification (TS) Sections 4.0.2 and 4.0.3 and Revises Requirements for Missed Surveillance in TS Section 4.0.3 ML0435102452004-12-14014 December 2004 Technical Specification Pages, Elimination of Requirements for Hydrogen/Oxygen Monitors ML0514500312004-06-0909 June 2004 E-Mail from R. Ennis of USNRC to Various, Regarding State of Vermont Comments on EPU and AST ML0411202522004-04-14014 April 2004 Technical Specification Pages for Vermont Yankee Nuclear Power Station, License Amendment, Issuance of Amendment Implementation of Arts/Mellla 2019-09-11
[Table view] |
Text
VYNPS 3.5 LIMITING CONDITION FOR 4.5 SURVEILLANCE REQUIREMENT OPERATION
- 5. All recirculation pump 5. Operability testing of discharge valves and recirculation pump bypass valves shall be discharge valves and operable or closed prior bypass valves shall be to reactor startup. in accordance with Specification 4.6.E.
- 6. If the requirements of Specifications 3.5.A cannot be met, an orderly shutdown of the reactor shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. B. Containment Spray Cooling Capability B. Containment Spray Cooling 1. Surveillance of the Capability drywell spray loops shall be performed as
- 1. Both containment cooling follows. An air test I spray loops are required shall be performed on to be operable when the the drywell spray reactor water headers and nozzles temperature is greater following maintenance than 2120 F except that a that could result in Containment Cooling nozzle blockage.
Subsystem may be inoperable for thirty days.
- 2. Deleted.
- 2. If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Amendment No. Go, -. 11, 444, 44-&, &, 2G49, 2-2i 228 102
VYNPS BASES:
4.5 CORE AND CONTAINMENT COOLANT SYSTEMS A. Core Spray and LPCI During normal plant operation, manual tests of operable pumps and valves shall be conducted in accordance with Specification 4.6.E to demonstrate operability.
During each refueling shutdown, tests (as summarized below) shall be conducted to demonstrate proper automatic operation and system performance.
Periodic testing as described in Specification 4.6.E will demonstrate that all components which do not operate during normal conditions will operate properly if required.
The automatic actuation test will be performed by simulation of high drywell pressure or low-low water level. The starting of the pump and actuation of valves will be checked. The normal power supply will be used during the test. Testing of the sequencing of the pumps when the diesel generator is the source of power will be checked during the testing of the diesel. Following the automatic actuation test, the flow rate will be checked by recirculation to the suppression chamber.
The pump and valve operability checks will be performed by manually starting the pump or activating the valve. For the pumps, the pump motors will be run long enough for them to reach operating temperatures.
B. and C. Containment Spray Cooling Capability and RHR Service Water Systems The periodic testing requirements specified in Specifications 4.5.B and C will demonstrate that all components will operate properly if required. Since this is a manually actuated system, no automatic actuation test is required. The system will be activated manually and the flow checked by an indicator in the control room.
Surveillance 4.5.B.1 is performed following maintenance that could result in nozzle blockage, to verify that the spray nozzles are free of obstructions by blowing air through them and demonstrating an open flow path. The frequency for performance of this surveillance test is adequate due to the passive nozzle design, its normally dry state and has been shown to be acceptable through operating experience.
Amendment No. Z, 144,4-2G,4-77, 228 113
VYNPS BASES: 4.5 (Cont'd)
D., E., and F. Station Service Water and Alternate Cooling Tower Systems and High Pressure Coolant Injection and Automatic Depressurization System HPCI system testing demonstrates operational readiness of equipment and detects degradations which may affect reliable operation. Testing is conducted during each reactor startup if maintenance that affects operability was performed on the HPCI system. Periodic testing is also performed in accordance with Specification 4.6.E and the inservice testing program.
Sufficient steam flow must be available prior to HPCI testing to avoid inducing an operational transient when steam is diverted to the HPCI system. Reactor startup is allowed prior to performing the required surveillance testing in order to achieve adequate steam pressure and flow. However, a 24-hour limitation is imposed for performing operability testing once reactor steam pressure exceeds 150 psig. The short duration before full functional testing is performed is considered acceptable.
The Automatic Depressurization System is tested during refueling outages to avoid an undesirable blowdown of the Reactor Coolant System.
The HPCI Automatic Actuation Test will be performed by simulation of the accident signal. The test is normally performed in conjunction with the automatic actuation of all Core Standby Cooling Systems.
G. Reactor Core Isolation Cooling System The frequency and conditions for testing of the RCIC system are the same as for the HPCI system. Testing is conducted in accordance with Specification 4.6.E and provides assurance that the system will function as intended.
H. Minimum Core and Containment Cooling System Availability Deleted.
I. Maintenance of Filled Discharge Pipe Observation of water flowing from the discharge line high point vent as required by Specification 4.5.I assures that the Core Cooling Subsystems will not experience water hammer damage when any of the pumps are started. Core Spray Subsystems and LPCI Subsystems will also be vented through the discharge line high point vent following a return from an inoperable status to assure that the system is "solid" and ready for operation.