ML052160348
Jump to navigation
Jump to search
| ML052160348 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/04/2005 |
| From: | Mozafari B NRC/NRR/DLPM/LPD2 |
| To: | Young D Florida Power Corp |
| Mozafari B,NRR/DLPM, 415-2020 | |
| Shared Package | |
| ML051870353 | List: |
| References | |
| TAC MC4878 | |
| Download: ML052160348 (1) | |
Text
Reactor Building Spray and Containment Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.6.7
NOTE--------------------
Not applicable in MODE 4.
Verify each required containment cooling 24 months train starts automatically on an actual or simulated actuation signal.
SR 3.6.6.8 Verify each spray nozzle is unobstructed.
Following maintenance that could result in nozzle blockage Crystal River Unit 3 3.6-20 Amendment No.219