ML052160348

From kanterella
Jump to navigation Jump to search

Technical Specifications, Reactor Building Spray Nozzle Surveillance Requirements
ML052160348
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/04/2005
From: Mozafari B
NRC/NRR/DLPM/LPD2
To: Young D
Florida Power Corp
Mozafari B,NRR/DLPM, 415-2020
Shared Package
ML051870353 List:
References
TAC MC4878
Download: ML052160348 (1)


Text

Reactor Building Spray and Containment Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.6.7


NOTE--------------------

Not applicable in MODE 4.

Verify each required containment cooling 24 months train starts automatically on an actual or simulated actuation signal.

SR 3.6.6.8 Verify each spray nozzle is unobstructed.

Following maintenance that could result in nozzle blockage Crystal River Unit 3 3.6-20 Amendment No.219