Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-MT-23-051, Update to the Technical Specification Bases28 November 2023Update to the Technical Specification Bases
L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.610 November 2023License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6Safe Shutdown
Surveillance Frequency Control Program
L-MT-22-048, Update to the Monticello Technical Specification Bases28 November 2022Update to the Monticello Technical Specification Bases
L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency18 March 2022License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance FrequencyUltimate heat sink
Foreign Material Exclusion
Power Operated Valves
L-MT-21-067, Update to the Monticello Technical Specification Bases29 November 2021Update to the Monticello Technical Specification Bases
L-MT-20-043, Update to the Monticello Technical Specification Bases24 November 2020Update to the Monticello Technical Specification Bases
L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR3 November 2020License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPRReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Offsite Dose Calculation Manual
Anticipated operational occurrence
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
L-MT-19-049, Technical Specification Bases8 November 2019Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Post Accident Monitoring
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Squib
Qualified Offsite Circuit
Incorporated by reference
Missed surveillance
Abnormal operational transient
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Battery sizing
Overtravel
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Scaffolding
Power change
ML18324A67916 November 2018Update to the Monticello Technical Specification Bases
L-MT-17-083, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program19 December 2017License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ProgramSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Squib
Multiple Spurious Operation
Incorporated by reference
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Large early release frequency
Battery sizing
Overtravel
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
L-MT-16-064, Update to Technical Requirements Manual and Technical Specification Bases21 November 2016Update to Technical Requirements Manual and Technical Specification Bases
ML16047A27210 February 2016License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen YearsSafe Shutdown
Probabilistic Risk Assessment
Coatings
Aging Management
Moisture barrier
Scaffolding
ML15335A50820 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 34
ML15335A50720 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 33
ML15335A50620 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 32
ML15335A50520 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 31
ML15335A50420 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 30
ML15335A49420 November 2015Technical Requirements Manual, Technical Specification Bases, Revision 39
ML15335A50920 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 35
ML15335A51020 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 36
ML15335A51120 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 37
ML15335A51220 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 38
L-MT-15-088, Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 3920 November 2015Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 39Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Abnormal operational transient
Fuel cladding
ML15275A0392 October 2015Revision 38 to Technical Specification BasesReactor Vessel Water Level
Anticipated operational occurrence
Hydrostatic
ML15275A0382 October 2015Revision 17 to Technical Requirements Manual Specifications and BasesOffsite Circuit
ML15275A0402 October 2015Revision 37 to Technical Specification BasesShutdown Margin
Reactor Vessel Water Level
Hydrostatic
Scram Discharge Volume
Fuel cladding
Power change
ML15135A22412 May 2015Technical Specification BasesSafe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Hydrostatic
Qualified Offsite Circuit
Offsite Circuit
L-MT-13-041, License Amendment Request: Revision of Technical Specification 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing14 November 2013License Amendment Request: Revision of Technical Specification 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing
ML13261A14612 September 2013MNGP Technical Specification Bases Updating InstructionsShutdown Margin
Safety Limit Minimum Critical Power Ratio
Hydrostatic
Cyber Security
B.5.b
Missed surveillance
Scram Discharge Volume
Safeguards Contingency Plan
ML13233A09616 August 2013MNGP ISFSI Amendment 10 to Technical SpecificationsTornado Missile
Earthquake
Fuel cladding
Liquid penetrant
L-MT-12-077, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities6 December 2012License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing ActivitiesAnticipated operational occurrence
Hydrostatic
Incorporated by reference
Power change
ML12083A25122 March 2012Enclosure 1 - Monticello Nuclear Generating Plant Technical Specification Bases Revision 19Safe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Post Accident Monitoring
Internal Flooding
Hydrostatic
Squib
Qualified Offsite Circuit
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Battery sizing
Overtravel
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML12033A1768 September 2011License Amendment Request Revise the Technical Specifications to Include a Pressure Temperature Limits Report Pressure and Temperature Limits Report, Enclosure 4Hydrostatic
Pressure and Temperature Limits Report
MELLLA
ML11129A23927 April 2011001 Monticello - Technical Specification Bases, Revision 16Safe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Post Accident Monitoring
Internal Flooding
Hydrostatic
Squib
Qualified Offsite Circuit
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Battery sizing
Overtravel
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML10084056818 February 2010Monticello - Technical Specification Bases RevisionSafe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Post Accident Monitoring
Internal Flooding
Hydrostatic
Squib
Qualified Offsite Circuit
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Battery sizing
Overtravel
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
ML10028055821 January 2010Monticello - License Amendment Request: Maximum Extended Load Line Limit Analysis PlusReactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Minimum Critical Power Ratio
Large early release frequency
MELLLA
Fuel cladding
ML09141012013 May 2009Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009
ML09105061915 April 2009License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26Safe Shutdown
ML09029104528 January 2009Monticello Nuclear Generating Plant Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Squib
Qualified Offsite Circuit
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Battery sizing
Overtravel
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Coast down
Unidentified leakage
L-MT-08-034, License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling System26 June 2008License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling SystemSafe Shutdown
Unanalyzed Condition
Reactor Vessel Water Level
Ultimate heat sink
Fuel cladding
L-MT-08-025, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process3 April 2008Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Reactor Vessel Water Level
Incorporated by reference
Recently irradiated fuel
ML08059054121 February 2008Issuance of Amendment Request to Revise Technical Specification Surveillance Requirements 3.5.1.3 to Correct the Alternate Nitrogen System Pressure (Tac MD4292)
L-MT-07-036, License Amendment Request, Remove Table of Contents from Technical Specifications9 July 2007License Amendment Request, Remove Table of Contents from Technical SpecificationsShutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
L-MT-07-009, License Amendment Request: Revision to the Allowable Values and Surveillance Intervals for the Low Pressure Coolant Injection Loop Select Logic Time Delay Relays29 January 2007License Amendment Request: Revision to the Allowable Values and Surveillance Intervals for the Low Pressure Coolant Injection Loop Select Logic Time Delay RelaysSafe Shutdown
Reactor Vessel Water Level
Probabilistic Risk Assessment
Large early release frequency
Grace period
L-MT-06-054, Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST)21 August 2006Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST)Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
Hydrostatic
Squib
Qualified Offsite Circuit
Scram Discharge Volume
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
L-MT-04-047, Technical Specification Bases Change 138a26 July 2004Technical Specification Bases Change 138a
ML04118061221 May 2004Issuance of Amendment Re. Elimination of Requirements for Hydrogen Recombiners and Hydrogen and Oxygen MonitorsProbabilistic Risk Assessment
Fuel cladding
ML04042042430 January 2004Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement ProcessReactor Vessel Water Level
Post Accident Monitoring
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
L-MT-03-085, Technical Specification Bases Pages Changes11 November 2003Technical Specification Bases Pages ChangesSafe Shutdown
Safety Limit Minimum Critical Power Ratio
Grab sample
Hydrostatic
Missed surveillance
Scram Discharge Volume
Excess Flow Check Valve
Safeguards Contingency Plan
Pressure Boundary Leakage
Unidentified leakage
ML03198027521 August 2003License Amendment, Revise Drywell Leakage and Sump Monitoring Detection Section of the Current Plant Technical SpecificationPacking leak
Pressure Boundary Leakage