Letter Sequence Other |
---|
|
|
MONTHYEARML0234701352002-12-10010 December 2002 Tech Spec Pages for Amendments 232 and 232 Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles Project stage: Other ML0234600862002-12-10010 December 2002 License Amendment 232 and 232, Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles Project stage: Approval 2002-12-10
[Table View] |
Similar Documents at Surry |
---|
Category:Technical Specification
MONTHYEARML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML22322A1982022-11-18018 November 2022 Proposed License Amendment Request Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications Marked-up Technical Specifications Basis Page ML22278A1692022-10-0505 October 2022 Annual Submittal of Technical Bases Changes Pursuant to Technical Specification 6.4.J ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22131A3102022-05-11011 May 2022 Proposed License Amendment Request Addition of Alternate Control Rod Position Monitoring Requirements ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21279A2892021-10-0404 October 2021 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML20304A1592020-10-12012 October 2020 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML19309D1962019-10-30030 October 2019 Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML19297D1472019-10-14014 October 2019 Annual Submittal of Technical Specifications (TS) Bases Changes Pursuant to TS 6.4.J ML19269B7752019-09-19019 September 2019 Proposed License Amendment Request: Update of Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures for Subsequent License Renewal ML18289A3962018-10-11011 October 2018 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML17317A4642017-11-0707 November 2017 Proposed License Amendment Request, Temporary, One Time 21-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C and Associated Cabling ML17293A0282017-10-16016 October 2017 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML17150A3022017-05-23023 May 2017 Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML16134A0692016-05-10010 May 2016 Proposed License Amendment Request for Expansion of Primary Grade Water Lockout Requirements in TS 3.2.E ML15293A4962015-10-0707 October 2015 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 6.4.J ML13280A3112013-09-30030 September 2013 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML11297A1192011-10-13013 October 2011 Submittal of Annual Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML1029904232010-10-13013 October 2010 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML1009003912010-03-30030 March 2010 Proposed License Amendment Request Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirement to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) ML0928003582009-09-30030 September 2009 Proposed License Amendment Request One-time Alternate Repair Criteria for Steam Generator Tube Inspection/Repair for Units 1 & 2 ML0921504642009-07-28028 July 2009 Proposed License Amendment Request Permanent Alternate Repair Criteria for Steam Generator Tube Repair ML0907005522009-02-17017 February 2009 Page Correction for Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML0828905292008-10-0909 October 2008 Proposed License Amendment Request, Removal of Main Control Room Bottled Air System Requirements ML0829004942008-10-0202 October 2008 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML0728509092007-10-11011 October 2007 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML0726811712007-09-25025 September 2007 Proposed Technical Specifications Change Supplement Re Operable Definition Modification for Air Handling Units While in Temporary 45-Day Allowed Outage Times ML0726810962007-09-19019 September 2007 Proposed Technical Specifications Change Revised Setting Limits and Overtemperature T/Overpower at T Time Constants. ML0709600372007-04-0505 April 2007 Proposed Technical Specifications Change Re Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping ML0709303712007-04-0202 April 2007 Technical Specifications Pages Re Main Control Room and Emergency Switchgear Room Air Conditioning System ML0706505242007-02-26026 February 2007 Proposed Technical Specifications Change Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping ML0628301702006-10-0909 October 2006 Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML0600500262006-01-0303 January 2006 Technical Specification Pages Reactor Coolant System Pressure and Temperature Limits ML0520001542005-07-15015 July 2005 TS, Amd MC5034, Relocation of Inservice Inspection and Testing Requirements ML0515902872005-05-31031 May 2005 Technical Specifications Bases Changes Revision of References for Offsite Dose Limits ML0430905782004-11-0404 November 2004 Proposed Technical Specifications Change Request Relocation of Inservice Inspection and Testing Requirements ML0426002962004-09-15015 September 2004 Proposed Technical Specifications Change Administrative Controls Changes, Attachment 2, Mark-Up of Technical Specifications. ML0426002902004-09-15015 September 2004 Proposed Technical Specifications Change Administrative Controls Changes ML0424401692004-08-30030 August 2004 Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process ML0234701352002-12-10010 December 2002 Tech Spec Pages for Amendments 232 and 232 Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles ML0231802422002-11-0505 November 2002 Proposed Technical Specification Change, Deletion of Monthly Analog Rod Position Test ML0231802402002-11-0505 November 2002 Proposed Technical Specification Change Deletion of Fifteen Minute Degassed Beta & Gamma Activity Test & Semiannual Dose Equivalent I-131 Analysis ML0207203672002-03-0808 March 2002 Technical Specification Pages, Amendments 230 & 230 for Surry, Units 1 & 2 ML0205100092002-02-0808 February 2002 Technical Specification Basis Change, Alternate Source Term Implementation ML0600402721999-08-23023 August 1999 Technical Specifications Basis Change - Delete Tables for Reactor Vessel Toughness Data ML19094A4091977-10-26026 October 1977 Technical Assistance Request - Environmental Technical Specification Changes ML19093B3341975-07-17017 July 1975 Request for Amendment to Operating Licenses DPR-32 & DPR-37 for Technical Specification Change No. 31 ML19094A2261972-03-17017 March 1972 Technical Specifications 2023-06-16
[Table view] Category:Amendment
MONTHYEARML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22131A3102022-05-11011 May 2022 Proposed License Amendment Request Addition of Alternate Control Rod Position Monitoring Requirements ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML19309D1962019-10-30030 October 2019 Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML17150A3022017-05-23023 May 2017 Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML1009003912010-03-30030 March 2010 Proposed License Amendment Request Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirement to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) ML0921504642009-07-28028 July 2009 Proposed License Amendment Request Permanent Alternate Repair Criteria for Steam Generator Tube Repair ML0828905292008-10-0909 October 2008 Proposed License Amendment Request, Removal of Main Control Room Bottled Air System Requirements ML0726811712007-09-25025 September 2007 Proposed Technical Specifications Change Supplement Re Operable Definition Modification for Air Handling Units While in Temporary 45-Day Allowed Outage Times ML0726810962007-09-19019 September 2007 Proposed Technical Specifications Change Revised Setting Limits and Overtemperature T/Overpower at T Time Constants. ML0709600372007-04-0505 April 2007 Proposed Technical Specifications Change Re Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping ML0709303712007-04-0202 April 2007 Technical Specifications Pages Re Main Control Room and Emergency Switchgear Room Air Conditioning System ML0706505242007-02-26026 February 2007 Proposed Technical Specifications Change Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping ML0600500262006-01-0303 January 2006 Technical Specification Pages Reactor Coolant System Pressure and Temperature Limits ML0520001542005-07-15015 July 2005 TS, Amd MC5034, Relocation of Inservice Inspection and Testing Requirements ML0426002902004-09-15015 September 2004 Proposed Technical Specifications Change Administrative Controls Changes ML0426002962004-09-15015 September 2004 Proposed Technical Specifications Change Administrative Controls Changes, Attachment 2, Mark-Up of Technical Specifications. ML0234701352002-12-10010 December 2002 Tech Spec Pages for Amendments 232 and 232 Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles ML0231802422002-11-0505 November 2002 Proposed Technical Specification Change, Deletion of Monthly Analog Rod Position Test ML0231802402002-11-0505 November 2002 Proposed Technical Specification Change Deletion of Fifteen Minute Degassed Beta & Gamma Activity Test & Semiannual Dose Equivalent I-131 Analysis ML0207203672002-03-0808 March 2002 Technical Specification Pages, Amendments 230 & 230 for Surry, Units 1 & 2 ML19093B3341975-07-17017 July 1975 Request for Amendment to Operating Licenses DPR-32 & DPR-37 for Technical Specification Change No. 31 2023-06-16
[Table view] |
Text
TS 4.5-1 4.5 SPRAY SYSTEMS TESTS Applicability Applies to the testing of the Spray Systems.
Objective To verify that the Spray Systems will respond promptly and perform their design function, if required.
Specification A. Each containment spray subsystem shall be demonstrated OPERABLE:
- 1. By verifying, that on recirculation flow, each containment spray pump performs satisfactorily when tested in accordance with Specification 4.0.5.
- 2. By verifying that each motor-operated valve in the containment spray flow path performs satisfactorily when tested in accordance with Specification 4.0.5.
- 3. By verifying each spray nozzle is unobstructed following maintenance which could cause nozzle blockage.
- 4. Coincident with the containment spray pump test described in Specification 4.5.A.1, by verifying that no particulate material clogs the test spray nozzles in the refueling water storage tank.
B. Each recirculation spray subsystem shall be demonstrated OPERABLE:
- 1. By verifying each recirculation spray pump performs satisfactorily when tested in accordance with Specification 4.0.5.
AmendmentNos. 232 and 232
TS 4.5-2
- 2. By verifying that each motor-operated valve in the recirculation spray flow paths performs satisfactorily when tested in accordance with Specification 4.0.5.
- 3. By verifying each spray nozzle is unobstructed following maintenance which could cause nozzle blockage.
C. Each weight-loaded check valve in the containment spray and outside containment recirculation spray subsystems shall be demonstrated OPERABLE once per 18 months by cycling the valve one complete cycle of full travel and verifying that each valve opens when the discharge line of the pump is pressurized with air and seats when a vacuum is applied.
D. A visual inspection of the containment sump and the inside containment recirculation spray pump wells and the engineered safeguards suction inlets shall be performed once per 18 months and/or after major maintenance activities in the containment. The inspection should verify that the containment sump and pump wells are free of debris that could degrade system operation and that the sump components (i.e., trash racks, screens) are properly installed and show no sign of structural distress or excessive corrosion.
AmendmentNos. 232 and 232
TS 4.5-4 The recirculation spray pumps outside the containment have the capability of being dry-run and flow tested. The test of an outside recirculation spray pump is performed by closing the containment sump suction line valve and the isolation valve between the pump discharge and the containment penetration. This allows the pump casing to be filled with water and the pump to recirculate water through a test line from the pump discharge to the pump casing.
With a system flush conducted to remove particulate matter prior to the installation of spray nozzles and with corrosion resistant nozzles and piping, it is not considered credible that a significant number of nozzles would plug during the life of the unit to reduce the effectiveness of the subsystems. Therefore, an inspection or air or smoke test of the nozzles following maintenance which could cause nozzle blockage is sufficient to indicate that plugging of the nozzles has not occurred.
The spray nozzles in the refueling water storage tank provide means to ensure that there is no particulate matter in the refueling water storage tank and the containment spray subsystems which could plug or cause deterioration of the spray nozzles. The nozzles in the tank are identical to those used on the containment spray headers. The flow test of the containment spray pumps and recirculation to the refueling water storage will indicate any plugging of the nozzles by a reduction of flow through the nozzles.
Performing the containment sump and pump well inspections will reduce the potential for system degradation due to sump debris associated with refueling activities or major maintenance activities as well as reduce wear on the inside containment recirculation spray pumps during dry testing. Ensuring proper installation and structural integrity of the trash racks and sump screens will prevent ingress of debris generated during the DBA and will allow long term containment cooling and recirculation mode cooling of the core.
References FSAR Section 6.3.1, Containment Spray Pumps FSAR Section 6.3.1, Recirculation Spray Pumps AmendmentNos. 232 and 232