L-83-241, Final Deficiency Rept 83-007 Re High Pressure Safety Injection Pump Bearing Bracket Drain.Initially Reported on 830318.Lines & Valves Will Be Removed & Replaced.Deficiency Not Reportable Per 10CFR50.55(e)

From kanterella
(Redirected from L-83-241)
Jump to navigation Jump to search
Final Deficiency Rept 83-007 Re High Pressure Safety Injection Pump Bearing Bracket Drain.Initially Reported on 830318.Lines & Valves Will Be Removed & Replaced.Deficiency Not Reportable Per 10CFR50.55(e)
ML20069L441
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/18/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, 83-007, 83-7, L-83-241, NUDOCS 8304280206
Download: ML20069L441 (2)


Text

~

'g Lh P O. BOX 14000. JUNO BEACH. FL 33408

?

h d Dg

/1 be ,.

FLOmOA POWER & LIGHT COMPANY A/(): 12 April 18, 1983 L-83-241 Mr. James P. O'Reilly Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 bbrietta Street, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

RE: St. Lucie Plant - Unit #2 Docket No. 50-389 /50.55(e) 007

,HPSI Pump Bearing Bracket Drain on March 18, 1983, Florida Power & Light Company notified NRC, Region II, of a potential 10 CFR 50.55(e) condition existing at the site involving HPSI Pump Bearing 3 racket Drains.

Pursuant to the requirements of 10 CFR 50.55(e), a final report is attached.

Very truly yours, A hu l Robert E. Uh Vice President Advanced Systems and Technology or FICIAL COPY

_....s

.se * '

8304280206 830418 PDR ADOCK 05000389 S PDR PEOPLE. . SERVING PEOPLE

.. . m

, I. Summary .

4 During an inspection'of the high pressure safety injection (HPSI) pumps, the existence of closed valves in the bearing bracket drain lines was observed. If these valves remained closed, water leaking from the pump shaft seals could collect and contaminate the oil fn the bearings.

Such contamination could result in bearing damage, however, it is very unlikely that.any significant bearing damage would go undetected. There-fore safe operation would not he affected and this issue is not report-able according to the criteria of 10 CFR 50.55(e).

II. Description a

Drawing number E-13172-310-105, Revision 15 shows the following HPSI pump bearing bracket drain lines and valves:

HPSI Pump Drain Line Drain Valve

  1. 2A 3/8-SI-831 V-3762
  1. 2A 3/4-SI-832 V-3677
  1. 2B 3/8-SI-835 V-3763
  1. 2B 3/4-SI-836 V-3681

^

III. Corrective Action The drain lines and valves identified above will be removed and replaced with an un-valved drain line. This change will be completed prior to full power operation. In the meantime, the drain valves identified above will be maintained in the open position.

IV. Safety Implication If the drain valves were closed and if there was enough seal leakage to result in contamination of the bearing oil, some bearing damage could occur. However, any such damage would be detected during routine testing and surveillance, which is performed according to the ASME Code,Section XI, (as required by Technical Specification 4.0.5). Any damage would occur gradually and would be detected prior to impacting on the safety function of the HPSI pumps. Therefore, safe operation of St. Lucie Unit 2 would not be affected by closed HPSI pump bearing bracket drain valves.

V. Conclusions This issue is not reportable according to the criteria of 10 CFR 50.55(e).

This report is final and completes requirements for reporting to the NRC, r-- t,---. , - , , , . . - r --r-,,, ~-,,,,,er,,,,m ,