f BBC Brown Boven.
Switchgear Products Group esc Brown soveri,inc.
Spring House. PA 19477 June 6, 1985 Phone:(215)628-7400 Mr. R. C. DeYoung, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D C 20555
Subject:
Supplement to:
BBC Brown Boveri K-Line Circuit Breaker with Overcurrent Trip Device Model OD-4 or OD-5 (10CFR Part 21 Reports)
Dear Mr. DeYoung:
This report'is to supplement the BBC Brown Boveri 10CFR Part 21 Report on the same subject dated May 13, 1985.
Enclosed is a list of additional overcurrent trip devices that were furnished as spare part assemblies and circuit breakers, also furnished as spares, that could have an incorrect short time delay band lever (link) that had been inadvertently installed in the electro-mechanical overcurrent trip devices (Model OD-4 and OD-5 only) manufactured between October, 1983 and March, 1985 These items also require inspection and repincement of the link if it is found to be incorrect. As before, if the correct link (Part Number 707970 K1) is required it can be ordered through the local district office of BBC Brown Boveri at no charge.
BBC Brown Boveri is sending a copy of this report to all Nuclear Stations util-izing K-line circuit breakers in Nucicar and Non-Nuclear applications, since it is recommended that all K-line circuit breakers utilizing the OD-4 or OD-5 and OD-4 or OD-5 spare overcurrent trip assemblies manufactured between October, 1983 and March,1985 be inspected for this reported condition, b
- A h f
A. F. KAISER President Switchgear Products Group AFK/jm Enclosure cci A. V. Boetticher F. M. D' Antonio J. A. Iluntaman E. W. Rhoads G.11. Rodney BM611 4
M606
~
[g,/f L.11. Schmidt PDR A
K O
G. II. Taylor 8
/
/
.x w
?
s.
ADDITIONAL BBC BROWN BOVERI SPARE OD-4, OD-5, AND K-1600 CIRCUIT BREAKER WITH OD-4
-IN NUCLEAR APPLICATIONS MANUFACTURED-BETWEEN OCTOBER 1983 AND MARCH 1985 DATE-MANUFACTURED USER SALES ORDER PURCHASE ORDERS (QTY) ITEM Nov. 1984 Cleveland Electric Illuminating 37-05762 Q-2885-69 (11)
OD-4 Perry Nuclear Plant Feb. 1985 Gulf States Utilities 37-06507 8A-3Q-78778-(1)
OD-4 River Bend Nov. 1983 Public Service New Hampshire 33-03923 365002 (9)
OD-4 Seabrook Jan.'1984 BBC Brown Boveri 33-04267 HT-00443-01 (2)
OD-5 Hartford, Conn.
(Seabrook)
Jan. 1984 Carolina Power & Light 33-04330 786531AX (8)
OD-5 Brunswick Plant (16)
OD-4 Feb. 1985 Stone & Webster 33-04549 NMP-2E015N-20 (6)
OD-4 Niagara Mohawk Nine Mile Point #2 Sept. 1984 Duquesne Light Co.
33-05527 C500244 (1)
OD-4 Beaver Valley Sept. 1984 Virginia Electric Power 33-05423 1P 67295 (1)
OD-4 Surrey Station Aug. 1984 Florida Power & Light 33-05383 12619-79901W (1)
OD-4 St. Lucie Plant May 1984 Stone & Webster 33-04867 NMP2-FPO-20458 (2)
OD-4 Niagara Mohawk
~
Nine Mile Point #2 May 1984 Arkansas Power & Light 33-04905 07199 (3)
OD-4 Arkansas Nuclear one 1
~
- ~
ADDITIONAL BBC BROWN BOVERI SPARE.0D-4, OD-5, AND K-1600 CIRCUIT BREAKER WITH OD-4 IN NUCLEAR APPLICATIONS MANUFACTURED BEIWEEN OCTOBER 1983 AND MARCH 1985.
DATE MANUFACTURED USER SALES ORDER PURCHASE ORDERS (QTY) ITEM Feb. 1985 Stone & Webster 37-06431 NMP2-FPO-22782 (1)
OD Niagara Mohawk Nine Mile Point #2 March 1985 Arkansas Power & Light 37-06206 22080 (1).
OD-4 Arkansas Nuclear One Jan 1985 Public Service New Hampshire 37-06121 SNH-177 9763.006 (3)
OD-4 Seabrook Station
- 145,
-3, 00 #70 Oct. 1984 Ceorgia Power Company 37-05721 PAV-91 CO #24 (2)
OD-4 Plant Vogtle (2)
K-1600 CB with OD-4 Oct. 1984 Georgia Power Company 37-05719 PAV-2146 CO #25 (2)
K-1600 CB Plant Vogtle with OD-4 2