|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2022-048, Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report2022-03-21021 March 2022 Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report L-2021-220, Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1)2021-12-27027 December 2021 Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1) L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report L-2021-112, In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1)2021-08-13013 August 2021 In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1) L-2020-030, In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1)2020-02-18018 February 2020 In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1) L-2020-025, Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-42020-02-0707 February 2020 Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-4 L-2018-239, In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1)2018-12-28028 December 2018 In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1) L-2018-135, In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1)2018-07-0909 July 2018 In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1) L-2018-110, Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 02018-05-0202 May 2018 Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 0 L-2018-069, Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan2018-03-30030 March 2018 Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan L-2018-042, Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval2018-02-0909 February 2018 Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval L-2017-152, Refueling Outage SL2-23, Steam Generator Tube Inspection Report2017-09-13013 September 2017 Refueling Outage SL2-23, Steam Generator Tube Inspection Report L-2017-070, Refueling Outage SL1-27 Steam Generator Tube Inspection Report2017-04-27027 April 2017 Refueling Outage SL1-27 Steam Generator Tube Inspection Report L-2017-019, Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1)2017-02-0606 February 2017 Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1) L-2017-017, Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 02017-02-0202 February 2017 Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 0 L-2016-088, Report of 10 CFR 50.59 Plant Changes - Docket No. 50-3892016-04-19019 April 2016 Report of 10 CFR 50.59 Plant Changes - Docket No. 50-389 L-2016-089, Refueling Outage SL2-22, Steam Generator Tube Inspection Report2016-04-15015 April 2016 Refueling Outage SL2-22, Steam Generator Tube Inspection Report ML16076A4312016-03-0707 March 2016 St. Lucie, Unit 2, In-Service Inspection Plans Fourth Ten-Year Interval Relief Request 11 L-2016-015, In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1)2016-01-21021 January 2016 In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1) L-2015-204, In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1)2015-07-22022 July 2015 In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1) L-2015-126, License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan2015-05-11011 May 2015 License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan L-2015-063, In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply2015-03-0505 March 2015 In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply L-2014-360, Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 02014-12-0303 December 2014 Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 0 L-2014-339, Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 142014-11-0303 November 2014 Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-331, TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements2014-10-23023 October 2014 TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements L-2014-277, Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 172014-08-28028 August 2014 Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-224, In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l)2014-07-17017 July 2014 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l) L-2014-208, Third Ten-Year Interval Unit 2 Relief Request No. 172014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-206, Third Ten-Year Interval Unit 2 Relief Request No. 142014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-113, Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report2014-04-29029 April 2014 Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report L-2014-039, Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I)2014-02-0606 February 2014 Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I) L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2013-240, Fourth Ten-Year Interval, Relief Request No. 7, Rev. 02013-08-0505 August 2013 Fourth Ten-Year Interval, Relief Request No. 7, Rev. 0 L-2013-063, In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1)2013-02-20020 February 2013 In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1) L-2013-066, Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 02013-02-13013 February 2013 Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 0 L-2013-044, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 02013-02-0404 February 2013 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 0 L-2012-301, In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1)2012-07-20020 July 2012 In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1) L-2010-207, Fourth Ten-Year Interval Relief Request PR-92010-09-14014 September 2010 Fourth Ten-Year Interval Relief Request PR-9 L-2010-202, In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1)2010-09-0101 September 2010 In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1) L-2009-183, Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1)2009-08-14014 August 2009 Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1) L-2009-168, Response to Request for Additional Information, Third Interval Relief Request 312009-07-20020 July 2009 Response to Request for Additional Information, Third Interval Relief Request 31 L-2009-091, Steam Generator Tube Inspection Report2009-04-13013 April 2009 Steam Generator Tube Inspection Report L-2009-036, In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal2009-02-0909 February 2009 In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal L-2008-253, Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 112008-12-0303 December 2008 Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 11 L-2008-158, Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages2008-07-21021 July 2008 Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages L-2008-098, In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 22008-04-29029 April 2008 In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 2 L-2008-067, In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1)2008-03-26026 March 2008 In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1) L-2008-043, Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 02008-03-13013 March 2008 Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 0 2024-07-29
[Table view] Category:Letter type:L
MONTHYEARL-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) 2024-08-07
[Table view] |
Text
July 17, 2014 a
FPL. L-2014-224 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner's Activity Report (OAR-l)
Enclosed is the St. Lucie Unit 2, SL2-21 outage, Owner's Activity Report, Form OAR-I.
The OAR-i report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-21 refueling outage ended on April 23, 2014.
Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.
Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company ACw7 (f
6501 S. Ocean Drive, Jensen Beach, FL 34957
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 1 of9 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISI-PSL-2-2014 Plant: St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-21 Current Inspection Interval: ISI-Fourth, IWE-Second Current Inspection Period: ISI-First, IWE-Second Edition and Addenda of Section Xl applicable to the inspection plans: ISI-2007 with Addenda through 2008, and for Subsection IWE, 2001 Edition with Addenda through 2003 (IWL not applicable to St. Lucie Unit 2).
Date and Revision of inspection plans: ISI-October 25, 2013, Rev. 0, IWE-August 31, 2009, Rev. 1 Edition and Addenda of Section Xt applicable to repairs and replacements, if different than the inspection plan:
1998 Edition with Addenda through 2000 for repairs or replacements performed prior to August 8, 2013.
Code Cases Used: N-460, N-532-4, N-586-1. N-649, N-706-1. N-722-1. N-729-1, N-733, N-735, N-751, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL2-21 conform to the requirements of Section XI.
Signed /---Date Owner or Ownjr's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HSB Global Standards have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liab'bi any manner for any personal injury or property damage or loss of any kind arising from or connected wihti. pn orcon ____________________ Commissions //1, /2 * /,/Vi Inspectors Signare NailonaiBoard, State, ProvinceandEndorserments Date /2o A/-. /
Page 1 of 9
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 2 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 - 4th Interval, 1st Period, Outage 21 Examination Category and Item Number Item Description Evaluation Description None None None
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 3 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 -4th Interval, 1st Period, Outage 21 Code Item Date Repair/Replacement Class Description Completed Plan Number 2 V3124 REPLACEMENT OF VALVE DISC. 13-Apr-14 10054 1 V1475 REPLACEMENT OF PORV DISC, AND FLANGE 21-May-14 11065 FASTENERS 3 ICW PP 2B REPLACEMENT OF PUMP ASSEMBLY 28-Feb-14 12009 1 V3247 REPLACEMENT OF COVER FASTENERS. 21-May-14 12085 2 V2167 REPLACE CHECK VALVE DISC. 23-Jan-14 13002 2 SS-02-2A REPLACEMENT OF FLANGE FASTENERS IN FLANGE 23-Jan-14 13005 CONNECTION.
1 037 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13006 OLD SNUBBER 2 047 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13007 OLD SNUBBER.
2 052 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13008 OLD SNUBBER.
NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 057 OLD SNUBBER. 12-Apr-14 13009 2 074 NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 12-Apr-14 13010 OLD SNUBBERS.
1 076 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13011 OLD SNUBBER.
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 4 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 -4th Interval, 1st PerIod, Outage 21 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 079 OLD SNUBBER. 12-Apr-14 13012 1 1 081 ~OLD NEWSNUBBER.12Ar4 SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 133 13013 3 085 REPLACE SNUBBERS WITH NEW SNUBBER 12-Apr-14 13014 3085 ASSEMBLIES.
NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 087 OLD SNUBBER 12-Apr-14 13015 1 090 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13016 OLD SNUBBER.
NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 2 095 OLD SNUBBERS. 12-Apr-14 13017 2 101 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13018 OLD SNUBBER.
2 102 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13019 OLD SNUBBER.
1 1 105 ~OLD NEW SNUBBER.1-A-4 SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 132 13020 2 116 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13021 OLD SNUBBER.
NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 117 OLD SNUBBER. 12-Apr-14 13022 1 118 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13023 OLD SNUBBER.
2 122 NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 11-Apr-14 13024 OLD SNUBBERS.
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 5 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 131 OLD SNUBBER. 12-Apt-14 13025 2 135 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13026 OLD SNUBBER.
1 190 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13027 OLD SNUBBER.
NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 2 195 OLD SNUBBERS. 12-Apr-14 13028 2 197 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13029 OLD SNUBBER.
NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 3 201 OLD SNUBBER. 12-Apr-14 13030 2 203 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13031 OLD SNUBBER.
2 205 NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 12-Apr-14 13032 OLD SNUBBERS.
2 213 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13033 OLD SNUBBER.
2 215 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13034 OLD SNUBBER.
NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 223 OLD SNUBBER. 12-Apr-14 13035 1
224 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13036 1 2 OLD SNUBBER.
2 228 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13037 OLD SNUBBER
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 6 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVm ES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 332 OLD SNUBBER. 12-Apr-14 13038 2 103 REPLACEMENT OF EXISTING SNUBBERS WITH NEW 12-Apr-14 13039 SNUBBERS.
2 V8201 REPLACEMENT 23-May-14 13042 ASSEMBLY AND OF VALVEFASTENERS WITH NEW VALVE FLANGE 2 V8207 REPLACEMENT OF SPINDLE IN SPARE RELIEF VALVE. 05-Jun-14 13043 2 V8207 REPLACEMENT OF VALVE WITH NEW VALVE 23-May-14 13043 ASSEMBLY AND FLANGE FASTENERS.
2 V8208 INSTALL NEW VALVE ASSEMBLY AND FLANGE 07-May-14 13044 FASTENERS.
2 V8211 REPLACEMENT OF VALVE ASSEMBLY AND FLANGE 23-May-14 13045 FASTENERS.
2 V8213 REPLACEMENT OF VALVE ASSEMBLY AND FLANGE 07-May-14 13046 FASTENERS.
1 RCP 2A1 REPLACEMENT OF THE ROTATING ASSEMBLY, PUMP 21-May-14 13047 COVER AND COVER FASTENERS 2 V09157 REPLACEMENT OF FLANGE FASTENERS 02-Jun-14 13056 3 V2115 REPLACED RELIEF VALVE WITH SPARE VALVE 02-Jun-14 13058 ASSEMBLY AND NEW FLANGE FASTENERS.
1 V1202 INSTALLED SPARE RELIEF VALVE IN PLACE OF 11-Apr-14 13061 ORIGINAL VALVE.
2 CNTMT SPR REPLACEMENT OF MECHANICIAL SEAL ASSEMBLY. 21-May-14 13063 PP2B
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 7 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 CUT OUT SEAL WELD ON BODY TO BONNET 2 V3414 CONNECTION. 08-May-14 13065 2 V09119 REPLACEMENT OF CHECK VALVE COVER FASTENERS. 02-Jun-14 13067 2 MV-08-18B REPLACEMENT OF VALVE DISC AND BONNET 02-Jun-14 13068 FASTENERS 3 CCW HX 2B REPLACEMENT OF END COVER FASTENERS ON HEAT 02-Jun-14 13071 EXCHANGER.
3 V21208 REPLACE FLANGE FASTENERS. 02-Jun-14 13072 PERFORM WELD BUILD UP OF EXCAVATED AREAS 3 CW-11 INSIDE OF 30" PIPE ELBOW AT SIX LOCATIONS. ONE 23-May-14 13072 OF THE REPAIRS IS THROUGH WALL.
2 049 REPLACED MECHANICAL SNUBBER WITH HYDRAULIC 12-Apr-14 13073 PER EC 278812.
2 050 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14001 HYDRAULIC SNUBBER lAW EC278812 2 082 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14002 HYDRAULIC SNUBBER lAW EC278812 2 083 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14003 HYDRAULIC SNUBBER lAW EC278812 REPLACE MECHANICAL SNUBBER WITH LISEGA 1 097 HYDRAULIC SNUBBER lAW EC278812 12-Apr-14 14004 1 106 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14005 HYDRAULIC SNUBBER IAW278812 3 200 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14006 200 3 HYDRAULIC SNUBBER lAW EC278812
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 8 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 1 PRZR REPLACEMENT OF PRZR MANWAY STUDS AND NUTS. 23-May-14 14007 2 011 REPLACE SNUBBER WITH NEW SNUBBER ASSEMBLY 12-Apr-14 14008 TO FACILITATE TESTING.
2 MV-09-10 INSTALLED NEW VALVE DISC. 02-Jun-14 14011 2 MV-09-9 REPLACEMENT OF VALVE DISC / PLUG 08-May-14 14012 PERFORM LIGHT METAL REMOVAL TO REDUCE INDICATIONS FOUND DURING ISI EXAMINATION SDC HX 2A REPORTED PER AR 01949718.LIQUID PENETRANT 23-May-14 14016 EXAMINATION WILL BE PERFORMED TO VERIFY REPLACEMENT OF VALVE DISC IN SWING CHECK V09135 VALVE.21-May-14 14017 2 V09135 REPLACEMENT OF BODY TO BONNET FASTENERS IN 21-May-14 14017 CHECK VALVE.
2 SE-03-2B REPLACEMENT OF VALVE DISC. 08-May-14 14018 2 SE-03-2B3 REMOVED AND REMADE SEAL WELD ON VALVE BONNET IN SUPPORT OF VALVE MAINTENANCE. 08-May-14 14018 2 SE-03-2A REMOVE REMAKE SEAL WELD FOR VALVE BONNET IN 12-Apr-14 14019 SUPPORT OF VALVE MAINTENANCE.
REPLACEMENT OF BODY TO BONNET FASTENERS IN 38MV-08-3 23-May-14 14020 REMOVE / REPLACE BOX SUPPORTS ON LINES BF-38, 3 BF-40 BF-39 & BF-40, BF1-R5, R6, R9 AND BF-2-R2, R3, R4, R5 02-Jun-14 14021
& R7 BY WELDING.
3 C-85 REPLACE PIPE SUPPORTS C-2204-58, C-2204-66, & C- 23-May-14 14021 2202-200 BY WELDING.
St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 9 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 2 FCV-23-3 REPLACEMENT OF VALVE DISC. 22-May-14 14022 FUEL TRANS REPLACEMENT OF BLIND FLANGE WITH MODIFIED 2 FLANGE CLOSURE ASSEMBLY FOR FUEL TRANSFER FLANGE. 21-May-14 14023 2 V3241 REPLACEMENT OF VALVE INTERNALS DISC, SPRING 23-May-14 14024 SPINDLE AND NOZZLE.
REPLACEMENT OF SPRING AND SPINDLE IN RELIEF 2 V3211 VALVE.21-May-14 14026 3 CW-9 MODIFY SUPPORT CW-3000-7010 BY WELDING. 08-May-14 14027 1 PRZR REPLACEMENT OF MANWAY BOLTING 08-May-14 14030 SG 2B 1 INSTALL EXPANDED TUBE PLUG IN STEAM 08-May-14 14031 GENERATOR 2B.
2 FCV-25-36 REPLACED VALVE DISC. 21-May-14 14033 1 SG 2B INSTALL EXPANDED TUBE PLUG IN STEAM 22-Mar-14 14035 GENERATOR 2B.
1 SG-2A INSTALL EXPANDED TUBE PLUGS IN STEAM 23-Mar-14 14036 GENERATOR 2A.