In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1)
ML080950524
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/26/2008
From: Johnston G
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2008-067
Download: ML080950524 (4)


Text

I I L 0

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 26, 2008 FPL L-2008-067 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-3 89 In-Service Inspection Program Third Interval - Second Period - First Outage (SL2-17)

Owner's Activity Report (OAR-1)

Enclosed is the St. Lucie Unit 2 Third Interval, Second Period, First Outage (SL2-17),

ASME Section XI Form OAR-I, Owner's Activity Report. The SL2-17 outage ended on January 4, 2008. The Form OAR- 1, Owner's Activity Report, implements Code Case N-532-4. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Very truly yours, cordon L. Johnston Site Vice President St. Lucie Plant Attachment GLJ/KWF N7 an FPL Group company

St. Lucie Unit 2 Attachment Docket No. 50-389 Page 1 of3 L-2008-067 Report Number: ISI-PSL-2-2007 Plant: St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-17 Current Inspection Interval: Third Current Inspection Period: Second Edition and Addenda of Section XI applicable to the inspection plan: 1998 with Addenda through 2000, and for section IWE, 1992 Edition with addenda through 1992 (IWL not applicable to St. Lucie Unit 2).

Date and Revision of inspection plan: August 31, 2006, Rev. 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan:

Same Code Cases Used: N-460, N-532-4, N-533-1, N-566-1, N-616, N-623, N-624. N-658 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations sup orting the completion of SL-2-1 7 conform to the requirements of Section XI.

Signed L* , C L- - Date _ /__ a-/_

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions

  • -* Inspectbr's Signature National Board, State, Province, and Endorsements Date 0 9

4#

St. Lucie Unit 2 Attachment Docket No. 50-389 Page 2 of 3 L-2008-067 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE 2

St. Lucie Unit 2 Attachment Docket No. 50-389 Page 3 of 3 L-2008-067 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description Date Repair/Replacement Code Class Item Description of Work Completed Plan Number 3 1-30-CW-9 Weld Repair Through-Wall Leak 4/3/2007 SL2-07002 Steam Prepare Nozzles and Safe Ends, SG 2A 1 Generator 2A Primary Side 12/1012007 SL2-070112 Steam Prepare Nozzles and Safe Ends, SG 2B 1 Generator 2B Primary Side 12/10/2007 SL2-07012 Steam Prepare Nozzles and Safe Ends, SG 2A 2 Generator 2A Secondary Side 12110/2007 SL2-07012 Steam Prepare Nozzles and Safe Ends, SG 2B 2 Generator 2B Secondary Side 12110/2007 SL2-07012 Steam Install Replacement Steam Generator 2A by 1 Generator 2A Welding, 12/12/2007 SL2-07014 Steam Install Replacement Steam Generator 2B by 1 Generator 2B Welding 12/12/2007 SL2-07015 B H/L SDC Outlet Nozzle Structural Weld 1 1-12-RC-147 Overlay 12/8/2007 .SL.2-07026 Pressurizer Surge Line Outlet Nozzle 1 1-12-RC-108 Structural Weld Overlay 11/29/2007 SL2-07029 Final Assembly and Installation of the 1 Reactor Vessel Replacement Reactor Vessel Closure Head 12/12/2007 SL2-07038 Replace Pressurizer Spray Tee and Reducer 1 RC-103 by Welding 12/6/2007 SL2-07039 Replace (3) Pressurizer Safety Relief Valve 1 1-3-RC-827 Nozzle Flanges by Welding . 12/5/2007 SL2-07040 A H/L Drain Line Nozzle Structural Weld 1 1-2-RC-145 Overlay 11/28/2007 SL2-07041 B H/L Surge Line Nozzle Structural Weld 1 1-12-RC-108 Overlay 1218/2007 SL2-07042 Pressurizer Relief Outlet Nozzle Structural 1 I-4-RC-104 Weld Overlay 11/29/2007 SL2-07043 A H/L SDC Outlet Nozzle Structural Weld I 1-12-RC-162 Overlay 12/8/2007 SL2-07044 3