L-2013-063, In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1)

From kanterella
Jump to navigation Jump to search
In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1)
ML13071A420
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/20/2013
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2013-063
Download: ML13071A420 (4)


Text

0FPL.

February 20, 2013 L-2013-063 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20)

Owner's Activity Report (OAR-1)

Enclosed is the St. Lucie Unit 2, SL2-20 outage, Owner's Activity Report, Form OAR-1.

Form OAR-I implements Code Case N-532-4. The OAR-I report is prepared, certified, and submitted upon completion of each refueling outage.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant Attachment ESK/KWF Florida Power & Light Company Ao~$'7 6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Unit 2 L-2013-063 Docket No. 50-389 Attachment Page 1 of3 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISI-PSL-2-2012 Plant: St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8,1983 Refueling Outage No.: SL2-20 Current Inspection Interval: ISI-Third, IWE-Second Current Inspection Period: ISI-Third, IWE-Second Edition and Addenda of Section Xl applicable to the inspection plans: ISI-1 998 with Addenda through 2000, and for Subsection IWE, 2001 Edition with Addenda through 2003 (IWL not applicable to St. Lucie Unit 2).

Date and Revision of inspection plans: ISI-July 31, 2012, Rev. 7, IWE-August 31, 2009, Rev. 1 Edition and Addenda of Section Xl applicable to repairs and replacements, ifdifferent than the inspection plan: Same Code Cases Used: N-460, N-532-4, N-533-1. N-566-2. N-616, N-623, N-624, N-658, N-686-1. N-700, N-722-1. N-729-1, N-753. N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SIL2-20 conform to the requirements of Section XI.

Signed

  • CSz ,'-",C Date J/9-/3.'i Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or con ted with this inspection.

Commissions NB#9150 A,N,I,B,NSC FL 11-000694 Inspecto rs ature National Board, State, Province, and Endorsements Date Fe A V , Zoi5

St. Lucie Unit 2 L-2013-063 Docket No. 50-389 Attachment Page 2 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 - 3rd Interval, 3rd Period, Outage 20 Examination Category and Item Number Item Description Evaluation Description None None None

St. Lucie Unit 2 L-2013-063 Docket No. 50-389 Attachment Page 3 of 3 TABLE 2 ABSTRACT OF REPAIRJREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - 3rd Interval, 3rd Period. Outage 20 Code Class Item Description Date Repair/Replacement Description of Work Completed Plan Number 2 MS-IO REPAIR DEGRADED PIPE SUPPORT BY 10/19/2012 SL 2- 12079 WELDING 3 CW-29 INSTALL INTERNAL PATCH PLATE BY 8/26/2012 SL 2- 12086 MECHANICAL MEANS 1 RX CORRECTIVE MEASURE CLEANING 10/2/2012 SL2- 12113 BORIC ACID DEPOSITS PER CODE CASE N-729-1 3 CW-96 WELD BUILDUP REPAIR OF 9/17/2012 SL 2- 12121 CORROSION AREA 3 CC-27 CORRECTIVE MEASURE: MODIFY 11/7/2012 SL 2- 12128 SUPPORT CC-2074-8200 BY WELDING 3 CW-11 PIPING REPLACEMENT AND WELD 11/6/2012 SL2- 12135 BUILD UP AREAS OF WALL THINNING DUE TO EXTERNAL CORROSION.