ML15215A366
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/22/2015
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2015-204
Download: ML15215A366 (13)


Text

0July FPL.

I=PL 22, 2015 10L-2015-204 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 In-Service Inspection Program ISI Fourth Interval - Third Period SL1-26 Owner' s Activity Report (OAR-i1)

Enclosed is the St. Lucie Unit 1, SL1-26 outage, Owner's Activity Report, Form OAR-i.

Form OAR-i implements Code Case N-532-4. The OAR-i report is prepared, certified, and submitted upon completion of each refueling outage. The SL 1-26 refueling outage ended on April 24, 2015.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Eric S. Katzman ,.:.

Licensing Manager ..

St. Lucie Plant Attachment ESKIKWF cc: NRC Region II Administrator NRC Site .Resident Inspector Florida Power &

6501 S. Ocean Drive, Jensen Beach, FL 34957

L-201 5-204 Attachment Page 1 of 12 Report Number: ISI-PSL-i-201b Plant: St. Luode Nuclear Power Plant Unit I 0501 South Ocean Drive Jensen Beach, Florida 3't957 Commercial Servic~e Dal e: D,-,p..'r..r 5, Refueling Outage No.: SL-2 Current Inspection Interval: Fourth Current Inspection Period: .Third Edition and Addenda of Section Xl applicable to the inspection plan: 2001 Edition with, Addenda tthrouoh 2003.

Date and Revisiornot inspection plan: March 1g92015, Rev. 3 Edition and Addenda of Section ,Xl applicable to repairs and replacements, it different than the inspection plan: Same Code Cases Used: N-460, N-508-4. N-532-5, N-556-2. N-624, N-658, N-661-1. N-666-1. N-700, N-722-1l N-729-1, N-753, N-770-1 i CERTIFICATE OF CONFORMANCE SIcertif'y that (a) the statements made in this rpepor are correct; (b) the examinations and tests meet the Inspection plan as8reqtttfed by the ASME Code,Section XI; and (c) the repair/replacemenet activities and evaluations suipporting the I oplelion ot SLi1-216 conform to the requirements of Section Xi.

SSigned  : Date 7"'

SOwner or Owner's Designee, Tille CERTIFICATE OF INSERVICE INSPEGTION I, the undersigned, holding a valid cornnission issued by the Nations! Board of Boiler atnd pressure Vessel Inspectors and the State or Province of Georgia and employed by HSBCT of Hartford Connecticut have inspected the llema described in this Owner's Activity Rpepor, and stats that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements 01 Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied.

concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inmspector nor ehc mployee shall be itsble in anty manner for any persomnal injury or property damage or loss ol any kind ansing from or connected with t~h04Rec.,ion.

te'smIarCre.'siSiglbtlew rtem~i~smm Beard, State. Pmavlrmm,',

sir fCedorrsemirr Dale

  • 1=i.. 4:).i

L-20 15-204 Attachment Page 2 of 12 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description I Evaluation Description None None None

L-20 15-204 Attachment Page 3 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1- 4th Interval, 3rd Period, Outage 26 Code ItemDae epiRelemn Class Description Description of Work Daplted RPai/elaceNmbent 2 V2324 REPLACE VALVE DISC AND SPINDLE 2/6/2014 SL1-10108 2 V21 58 REPLACED VALVE, ELBOW AND PIPE SECTION 2/6/2014 SL1-1 1050 3 ~~~REPLACEMENT OF FASTENERS IN CHECK VALVE 2/204L1103 V111 COVER STUDS /NUTS.

2 V2326 RELIEF VALVE V2326. REPLACE DISC AND NOZZLE. 2/6/2014 SL1-12050 3 V225 REPLACE THE CHECK VALVE, FLANGE BOLTING 2/6/2014 SL1-12053 V225 AND EXPANSION JOINT.

3 V2345 REBUILD RELIEF VALVE 6/2/2015 SL1-1 3012 3 V2345 REPLACE RELIEF VALVE BOLTING 5/22/2015 SL1-13012 REPLACE VALVES AND ADJACENT PIPING BY 1 SE-02-1 7/20/2015 SLI1-13038 WELDING 1 RCP 1Al REPLACE RCP SEAL ASSEMBLY 7/16/2015 SLi1-1 3079 3 ~~~PERFORMED THROUGH WALL REPAIR BY 2621 L-39 C-0 WELDING.

3 ~~~REPLACE VALVE TO EXPANSION JOINT FLANGE 2621 L-39 V226 BOLTING.

3 ~~~REPLACE PUMP WITH SPARE PUMP ASSEMBLY AND7/021 L-02 CWPBNEW FLANGE FASTENERS.

L-20 15-204 Attachment Page 4 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTI VITIES REQUIRED FOR CONTINUED SERVICE PSL1 - 4th Interval, 3rd Period, Outage 26 Code Item DsrpinfWokDate Repair/Replacement Class Description DsrpinoWrkCompleted Plan Number 3 ~~~REPLACEMENT OF FLANGE FASTENERS DUE TO 7/021 SL-09 S215 CORROSION.

INSTALL SPARE PUMP ASSEMBLY WITH NEW 3 ICW PP lA CLMFATNR.5/6/2015 SL1-1 3099 REPLACED RELIEF VALVE NOZZLE DISC AND 2 V2324 SPINDLE FOR SPARE VALVE REMOVED FROM 6/2/2015 SL1-131 17 V2324.

1 RCP 1A2REPLACEMENT OF THE MECHANICAL SEAL FLANGE 2621 L-32 WITH SPARE REMOVED FROM RCP 1A1.

2 MV-08-13 INSTALLED BODYTO BONNET SEAL WELD. 2/6/2014 SL1-13124 REPLACEMENT OF CHECK VALVE AND ADJACENT 2 V02133 PIPING BY WELDING. 2" SOCKET WELD 2/20/2014 SL1-14001 CONNECTIONS.

3 HCV-25-6 REPLACEMENT OF VALVE DISC 7/14/2014 SL1-14032 1 RCP 1A2 INSTALL NEW RCP SEAL 5/22/2015 SL1-14033 1 RCP1A2 REPLACED PUMP COVER AND PUMP COVER 6221 L-43 FASTENERS.

1 CH-147 REPLACE PIPE BY WELDING. 7/1/2015 SL1-14035 2 CH-A73 REMOVE CH-A73 AND MOVE CH-A65 TO CH-124 BY 7/201 L-43 WELDING.

3 SB21206 REPAIR THROUGH WALL LEAK BY WELD BUILDUP. 7/16/2015 SLi1-14037

L-20 15-204 Attachment Page 5 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1- 4th Interval, 3rd Period, Outage 26 Code Item Date Repair/Replacement Class Description DsrpinoWrkCompleted Plan Number 3 S226 CW-10 INTERNAL PIPE REPAIR BY WELDING; 7/8/2015 SL1-14037 B226 REPLACE CHECK VALVE BOLTING.

3 C-0 Weld build up at two degraded locations internal to pipe. 7/8/2015 SL1-14037 Perform weld repair per SPEC-M-023.

3 V09951 Install FLEX connection assembly by welding. 7/1/2015 SL1-14039 3 V09952 Install FLEX connection assembly by welding. 7/20/2015 SL1-14039 3 V114 Install FLEX Connection assembly by welding. Replace 7/17/2015 SL1-14040 V114 check valve bonnet fasteners.

3 V121080 Prefabricate FLEX connection assembly by welding. 7/8/2015 SL1-14040 3 ~~~FABRICATE FLEX CONNECTION ASSEMBLY BY 7821 L-44 V179 WELDING INSTALL FLEX CONNECTION ASSEMBLY BY 2 V03994 7/20/2015 SL1-14041 WELDING.

2 V03995 INSTALLFLEX CONNECTION ASSEMBLY BY BOLTED 7//21 L-41 CONNECTION PER EC 279190 2 V03995 PREFABRICATE FLEX CONNECTION ASSEMBLY BY 7/021 L-41 2 V03995 RFBIAEFE ONETO SEBYB 7/20/2015 SL1-14041 WELDING.

2 V03993 PREFABRICATE FLEX CONNECTION ASSEMBLY BY 7/021 L-41 WELDING.

L-2015-204 Attachment Page 6 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL1 -4th Interval, 3rd Period, Outage 26 Code Item Date Repair/Replacement Class Description DsrponfWrkCompleted Plan Number 2 V03993 INSTALL FLEX CONNECTION ASSEMBLY BY7//21 SL-41 2 V03993 RFBIAEFE ONETO SEBYB 7/17/2015 SL1-14041 WELDING.

INSTALLIAT FLEX CONNECTION ASSEMBLY BY 2 V03994 7/15/2015 SL1-14041 WELDING.

INSALLFLE CONNECTION.ASMBYB 3 V03919 NLUENWFLXCNECINASEBYB 7/20/2015 SL1-14042 WELDING FUE REPLACEMELTRNTSFER TUBECANE TAL PER BLECD //05 L-4 2 V204 ELCERLEFVLEFLNEFATNR 5/21/2015 S L1-14042 OFPPOOMCANCL SNUBERET PRFBIAEREPLACEMENT 2 V2041 REPLCLUE VB2W FLANEX FASTECONER 5/2MLB 12/2015 SL1-14042 1 Vi 402 REPLACE PORV MRAIN DSCE 7/15/2015NGE1PE405 3 V8-21-l REPLACE SRALINERFVASTELNGER 6ATNR

/21/2015 SL1 -140455

L-2015-204 Attachment Page 7 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4th Interval, 3rd Period, Outage 26 Code Item Date Repair/Replacement Class Description Description of Work Completed Plan Number 1 V1202 REPLACE FLANGE NUT FOR PRESSURIZER SAFETY 7/125 SL-45 VALVE 3 ~~~REPLACE END-BELL BOLTING ON lA CCW HEAT 7121 L-46 CWXAEXCHANGER 1 CH-146 REPLACE PIPE ASSEMBLY BY WNELDING; REPLACE 7621 L-46 PART OF PIPE SUPPORT.

1 CH-148 REPLACED PIPE AND ELBOW BY WELDING 7/20/2015 SL1-14064 2 V07301 Prefabricate RWT manway cover to include FLEX 7/20/2015 SL1-14065 Connection assembly by welding.

2 V07301 Install replacement manway cover which includes new 7/16/2015 SL1-14065 FLEX Connection assembly.

2 V07106 REPLACE VALVE BY WELDING 7/16/2015 SL1-14065 2 CH-A74 Remove CH-A74 and relocate CH-A68 on CH-104 by 7/20/2015 SL1-14066 welding.

2 CH-A72 Remove CH-A72 and relocate line CH-A62 on CH-137 by 7/6/2015 SL1-14067 welding.

3 CW-197 Replace cracked weld. 7/7/2015 SL1-1 4071 2 V02134 REPLACED CHECK VALVE DISC 5/6/2015 SL1-14072 3 CW-77 Replaced fastener nuts for elbow spooi piece. 6/2/2015 SL1-14073

L-201 5-204 Attachment Page 8 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED F=OR CONTINUED SERVICE PSL 1 -4th Interval, 3rd Period, Outage 26 Code Item Date Repair/Replacement Class Description DsrpinoWrkCompleted Plan Number 3 V21162 REPLACED VALVE AND FASTENERS 5/21/2015 SL1-14074 2 V02133 REPLACE VALVE DISC 5/6/2015 SL1-14075 2 V02132 REPLACED VALVE DISC 5/21/2015 SL1-14076 1 SE-02-2 REPLACED VALVE DISC AND INTERNALS 612/2015 SL1-l15003 2 CH-121 REPLACE WELD UPSTREAM OF RELIEF VALVE 7721 L-50 FLANGE.

2 V2324 REPLACE RELIEF VALVE SPINDLE IN SPARE VALVE 5/6/2015 SL1-15006 REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 27 WITH LISEGA MODEL 3052 HYDRAULIC SNUBBER 4/13/2015 SL1 -1 5009 PER EC 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 53 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SLi-15010 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 54 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15011 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 55 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15012 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 56 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1 -1 5013 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 59 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 8L1-15014 283065.

L-201 5-204 Attachment Page 9 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4th Interval, 3rd Period, Outage 26 Code Item Date Repair/Replacement Class Description DsrpinoWrkCompleted Plan Number REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 61 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2016 SL1-15015 283066.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 60 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5016 263065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 67 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15017 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 71 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/113/2015 SL1-l15018 263065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 76 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15019 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 79 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SLI-1 5020 263065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 80 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5021 263065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 66 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5022 263065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 87 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5023 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 90 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1 -15024 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 1 91 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15025 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 96 WITH LISEGA 3052 HYDRAULIC SNUBBER PER 4/13/2015 SL1 -15026 EC283055.

L-20 15-204 Attachment Page 10 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4th interval, 3rd Period, Outage 26 Code Item Date Repair/Replacement Cla~s Description Descript ion of Work Completed Plan Number REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 97 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15027 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 110 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/1312015 SL1-1 5028 283065.

REPLACEMENT OF PSA-3 MECHANICAL SNUBBER 2 202 WITH LISEGA 3052 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15029 283065.

REPLACEMENT OF PSA-1 MECHANICAL SNUBBER 1 120 WITH LISEGA 3038 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15030 263065.

REPLACEMENT OF PSA-1 MECHANICAL SNUBBER 2 143 WITH LISEGA 3038 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15031 283065.

REPLACEMENT OF PSA-1 MECHANICAL SNUBBER 1 148 WITH LISEGA 3038 HYDRAULIC SNUBBER PER EC 4/13/2015 SLI-1 5032 283065.

REPLACEMENT OF PSA-1 MECHANICAL SNUBBER 2 186 WITH LISEGA 3038 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15033 283065.

REPLACEMENT OF PSA-1 MECHANICAL SNUBBER 2 193 WITH LISEGA 3038 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15034 283065.

REPLACEMENT OF PSA-1 MECHANICAL SNUBBER 2 200 WITH LISEGA 3038 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5035 283065.

REPLACEMENT OF PSA-10 MECHANICAL SNUBBER 1 65 WITH LISEGA 3062 HYDRAULIC SNUBBER PER EC 4/13/2015 SLI-1 5036 283065.

REPLACEMENT OF PSA-10 MECHANICAL SNUBBER 1 68 WITH LISEGA 3062 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-15037 283065.

REPLACEMENT OF PSA-l0 MECHANICAL SNUBBER 1 69 WITH LISEGA 3062 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5038 283065.

L-20 15-204 Attachment Pagel1lofl12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSI. 1 - 4th Interval, 3rd Period, Outage 26 Code itemDae RaiReaemn Class Description ~~Description of WorkDae Clss DecrptonCompleted Rpi/pacmn Pian Number REPLACEMENT OF PSA-10 MECHANICAL SNUBBER 2 72 WITH LISEGA 3062 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5039 283065.

REPLACEMENT OF PSA-l0 MECHANICAL SNUBBER 2 75 WITH LISEGA 3062 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5040 283065.

REPLACEMENT OF PSA-lO MECHANICAL SNUBBER 2 65 WITH LISEGA 3062 HYDRAULIC SNUBBER PER EC 4/13/2015 SLI-1 5041 283065.

REPLACEMENT OF PSA-l0 MECHANICAL SNUBBER 2 222 WITH LISEGA 3062 HYDRAULIC SNUBBER PER EC 4/13/2015 SL1-1 5042 283065.

3 ~~~REPLACED PIPE SPOOL PIECE CW-9-1 AND FLANGE 7/521 SL104 CW9 FASTENERS BY BOLTED CONNECTION.

PRE-FABRICATE REPLACEMENT SPOOL PIECE BY 3 CW-9 7/15/2015 SL1 -15043 WELDING.

3 ~~~REPLACE DEGRADED PIPE SUPPORT 7721 L-54 C-B COMPONENTS BY WELDING.

CW-1001-3 1B Replace support beam on CW-76 pipe support. 7/7/2015 SLi1-1 5046 3 CW-96 REPLACE BOLTING AT SPOOL PIECE CONNECTION. 7/17/2015 SL1-15047 3 ~~~REPLACE DEGRADED SUPPORT COMPONENTS BY 7/205L1104 C96 BOLTED CONNECTION AND WELDING.

3 SS-21-lA RESTORE FLANGE SURFACE BY WELD BUiLD-UP 7/7/2015 SL1-15049 2 V08148 REPLACED CHECK VALVE DISC. 5(6/2015 SLI-1 5051

L-2015-204 Attachment Page 12 of 12 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4th Interval, 3rd Period, Outage 26 Code Item Date Repair/Replacement Class Description Description of Work Completed Plan Number 3 CW-11 PREFABRICATE SPOOL PIECE BY WELDING. 7/16/2015 SL1-15052 3 ~~~INSTALL NEW SPOOL PIECE BY WELDING AND 71/05 S1155 CW11BOLTED CONNECTIONS.

2 SG 1A REPLACE SECONDARY SIDE MANWAY BOLTING 5/21/2015 SL1 -15053 2 SG1B REPLACE BOLTING ON SECONDARY MANHOLE 5/125 L-04 COVER 1 PRZR REPLACE PRESSURIZER MANWAY STUDS AND 7/16/2015 SL1-15055 NUTS.

2 BF-19 REMOVE LINEAR INDICATION BY MECHANICAL 7121 ~ -SS PROCESS.

3 CC-26 REPLACE SECTIONS OF SUPPORTS BY WELDING 7/8/2015 SL1-15057 3 BF-40 REPLACE PIPE SUPPORT 7/7/2015 SLI-1 5058 3 CW-76 REPLACE ELBOW FLANGE FASTENERS 6/2/2015 SL1-1 5059