L-2014-224, In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l)

From kanterella
Jump to navigation Jump to search
In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l)
ML14209A010
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/17/2014
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-224
Download: ML14209A010 (10)


Text

July 17, 2014 a

FPL. L-2014-224 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner's Activity Report (OAR-l)

Enclosed is the St. Lucie Unit 2, SL2-21 outage, Owner's Activity Report, Form OAR-I.

The OAR-i report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-21 refueling outage ended on April 23, 2014.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company ACw7 (f

6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 1 of9 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISI-PSL-2-2014 Plant: St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-21 Current Inspection Interval: ISI-Fourth, IWE-Second Current Inspection Period: ISI-First, IWE-Second Edition and Addenda of Section Xl applicable to the inspection plans: ISI-2007 with Addenda through 2008, and for Subsection IWE, 2001 Edition with Addenda through 2003 (IWL not applicable to St. Lucie Unit 2).

Date and Revision of inspection plans: ISI-October 25, 2013, Rev. 0, IWE-August 31, 2009, Rev. 1 Edition and Addenda of Section Xt applicable to repairs and replacements, if different than the inspection plan:

1998 Edition with Addenda through 2000 for repairs or replacements performed prior to August 8, 2013.

Code Cases Used: N-460, N-532-4, N-586-1. N-649, N-706-1. N-722-1. N-729-1, N-733, N-735, N-751, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL2-21 conform to the requirements of Section XI.

Signed /---Date Owner or Ownjr's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HSB Global Standards have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liab'bi any manner for any personal injury or property damage or loss of any kind arising from or connected wihti. pn orcon ____________________ Commissions //1, /2 * /,/Vi Inspectors Signare NailonaiBoard, State, ProvinceandEndorserments Date /2o A/-. /

Page 1 of 9

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 2 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 - 4th Interval, 1st Period, Outage 21 Examination Category and Item Number Item Description Evaluation Description None None None

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 3 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 -4th Interval, 1st Period, Outage 21 Code Item Date Repair/Replacement Class Description Completed Plan Number 2 V3124 REPLACEMENT OF VALVE DISC. 13-Apr-14 10054 1 V1475 REPLACEMENT OF PORV DISC, AND FLANGE 21-May-14 11065 FASTENERS 3 ICW PP 2B REPLACEMENT OF PUMP ASSEMBLY 28-Feb-14 12009 1 V3247 REPLACEMENT OF COVER FASTENERS. 21-May-14 12085 2 V2167 REPLACE CHECK VALVE DISC. 23-Jan-14 13002 2 SS-02-2A REPLACEMENT OF FLANGE FASTENERS IN FLANGE 23-Jan-14 13005 CONNECTION.

1 037 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13006 OLD SNUBBER 2 047 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13007 OLD SNUBBER.

2 052 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13008 OLD SNUBBER.

NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 057 OLD SNUBBER. 12-Apr-14 13009 2 074 NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 12-Apr-14 13010 OLD SNUBBERS.

1 076 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13011 OLD SNUBBER.

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 4 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 -4th Interval, 1st PerIod, Outage 21 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 079 OLD SNUBBER. 12-Apr-14 13012 1 1 081 ~OLD NEWSNUBBER.12Ar4 SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 133 13013 3 085 REPLACE SNUBBERS WITH NEW SNUBBER 12-Apr-14 13014 3085 ASSEMBLIES.

NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 087 OLD SNUBBER 12-Apr-14 13015 1 090 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13016 OLD SNUBBER.

NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 2 095 OLD SNUBBERS. 12-Apr-14 13017 2 101 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13018 OLD SNUBBER.

2 102 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13019 OLD SNUBBER.

1 1 105 ~OLD NEW SNUBBER.1-A-4 SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 132 13020 2 116 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13021 OLD SNUBBER.

NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 117 OLD SNUBBER. 12-Apr-14 13022 1 118 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13023 OLD SNUBBER.

2 122 NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 11-Apr-14 13024 OLD SNUBBERS.

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 5 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 131 OLD SNUBBER. 12-Apt-14 13025 2 135 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13026 OLD SNUBBER.

1 190 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13027 OLD SNUBBER.

NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 2 195 OLD SNUBBERS. 12-Apr-14 13028 2 197 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13029 OLD SNUBBER.

NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 3 201 OLD SNUBBER. 12-Apr-14 13030 2 203 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13031 OLD SNUBBER.

2 205 NEW SNUBBER ASSEMBLIES INSTALLED IN PLACE OF 12-Apr-14 13032 OLD SNUBBERS.

2 213 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13033 OLD SNUBBER.

2 215 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13034 OLD SNUBBER.

NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 223 OLD SNUBBER. 12-Apr-14 13035 1

224 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13036 1 2 OLD SNUBBER.

2 228 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 12-Apr-14 13037 OLD SNUBBER

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 6 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVm ES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 NEW SNUBBER ASSEMBLY INSTALLED IN PLACE OF 2 332 OLD SNUBBER. 12-Apr-14 13038 2 103 REPLACEMENT OF EXISTING SNUBBERS WITH NEW 12-Apr-14 13039 SNUBBERS.

2 V8201 REPLACEMENT 23-May-14 13042 ASSEMBLY AND OF VALVEFASTENERS WITH NEW VALVE FLANGE 2 V8207 REPLACEMENT OF SPINDLE IN SPARE RELIEF VALVE. 05-Jun-14 13043 2 V8207 REPLACEMENT OF VALVE WITH NEW VALVE 23-May-14 13043 ASSEMBLY AND FLANGE FASTENERS.

2 V8208 INSTALL NEW VALVE ASSEMBLY AND FLANGE 07-May-14 13044 FASTENERS.

2 V8211 REPLACEMENT OF VALVE ASSEMBLY AND FLANGE 23-May-14 13045 FASTENERS.

2 V8213 REPLACEMENT OF VALVE ASSEMBLY AND FLANGE 07-May-14 13046 FASTENERS.

1 RCP 2A1 REPLACEMENT OF THE ROTATING ASSEMBLY, PUMP 21-May-14 13047 COVER AND COVER FASTENERS 2 V09157 REPLACEMENT OF FLANGE FASTENERS 02-Jun-14 13056 3 V2115 REPLACED RELIEF VALVE WITH SPARE VALVE 02-Jun-14 13058 ASSEMBLY AND NEW FLANGE FASTENERS.

1 V1202 INSTALLED SPARE RELIEF VALVE IN PLACE OF 11-Apr-14 13061 ORIGINAL VALVE.

2 CNTMT SPR REPLACEMENT OF MECHANICIAL SEAL ASSEMBLY. 21-May-14 13063 PP2B

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 7 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 CUT OUT SEAL WELD ON BODY TO BONNET 2 V3414 CONNECTION. 08-May-14 13065 2 V09119 REPLACEMENT OF CHECK VALVE COVER FASTENERS. 02-Jun-14 13067 2 MV-08-18B REPLACEMENT OF VALVE DISC AND BONNET 02-Jun-14 13068 FASTENERS 3 CCW HX 2B REPLACEMENT OF END COVER FASTENERS ON HEAT 02-Jun-14 13071 EXCHANGER.

3 V21208 REPLACE FLANGE FASTENERS. 02-Jun-14 13072 PERFORM WELD BUILD UP OF EXCAVATED AREAS 3 CW-11 INSIDE OF 30" PIPE ELBOW AT SIX LOCATIONS. ONE 23-May-14 13072 OF THE REPAIRS IS THROUGH WALL.

2 049 REPLACED MECHANICAL SNUBBER WITH HYDRAULIC 12-Apr-14 13073 PER EC 278812.

2 050 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14001 HYDRAULIC SNUBBER lAW EC278812 2 082 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14002 HYDRAULIC SNUBBER lAW EC278812 2 083 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14003 HYDRAULIC SNUBBER lAW EC278812 REPLACE MECHANICAL SNUBBER WITH LISEGA 1 097 HYDRAULIC SNUBBER lAW EC278812 12-Apr-14 14004 1 106 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14005 HYDRAULIC SNUBBER IAW278812 3 200 REPLACE MECHANICAL SNUBBER WITH LISEGA 12-Apr-14 14006 200 3 HYDRAULIC SNUBBER lAW EC278812

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 8 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 1 PRZR REPLACEMENT OF PRZR MANWAY STUDS AND NUTS. 23-May-14 14007 2 011 REPLACE SNUBBER WITH NEW SNUBBER ASSEMBLY 12-Apr-14 14008 TO FACILITATE TESTING.

2 MV-09-10 INSTALLED NEW VALVE DISC. 02-Jun-14 14011 2 MV-09-9 REPLACEMENT OF VALVE DISC / PLUG 08-May-14 14012 PERFORM LIGHT METAL REMOVAL TO REDUCE INDICATIONS FOUND DURING ISI EXAMINATION SDC HX 2A REPORTED PER AR 01949718.LIQUID PENETRANT 23-May-14 14016 EXAMINATION WILL BE PERFORMED TO VERIFY REPLACEMENT OF VALVE DISC IN SWING CHECK V09135 VALVE.21-May-14 14017 2 V09135 REPLACEMENT OF BODY TO BONNET FASTENERS IN 21-May-14 14017 CHECK VALVE.

2 SE-03-2B REPLACEMENT OF VALVE DISC. 08-May-14 14018 2 SE-03-2B3 REMOVED AND REMADE SEAL WELD ON VALVE BONNET IN SUPPORT OF VALVE MAINTENANCE. 08-May-14 14018 2 SE-03-2A REMOVE REMAKE SEAL WELD FOR VALVE BONNET IN 12-Apr-14 14019 SUPPORT OF VALVE MAINTENANCE.

REPLACEMENT OF BODY TO BONNET FASTENERS IN 38MV-08-3 23-May-14 14020 REMOVE / REPLACE BOX SUPPORTS ON LINES BF-38, 3 BF-40 BF-39 & BF-40, BF1-R5, R6, R9 AND BF-2-R2, R3, R4, R5 02-Jun-14 14021

& R7 BY WELDING.

3 C-85 REPLACE PIPE SUPPORTS C-2204-58, C-2204-66, & C- 23-May-14 14021 2202-200 BY WELDING.

St. Lucie Unit 2 L-2014-224 Docket No. 50-389 Attachment Page 9 of 9 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL2 -4th Interval, 1st Period, Outage 21 2 FCV-23-3 REPLACEMENT OF VALVE DISC. 22-May-14 14022 FUEL TRANS REPLACEMENT OF BLIND FLANGE WITH MODIFIED 2 FLANGE CLOSURE ASSEMBLY FOR FUEL TRANSFER FLANGE. 21-May-14 14023 2 V3241 REPLACEMENT OF VALVE INTERNALS DISC, SPRING 23-May-14 14024 SPINDLE AND NOZZLE.

REPLACEMENT OF SPRING AND SPINDLE IN RELIEF 2 V3211 VALVE.21-May-14 14026 3 CW-9 MODIFY SUPPORT CW-3000-7010 BY WELDING. 08-May-14 14027 1 PRZR REPLACEMENT OF MANWAY BOLTING 08-May-14 14030 SG 2B 1 INSTALL EXPANDED TUBE PLUG IN STEAM 08-May-14 14031 GENERATOR 2B.

2 FCV-25-36 REPLACED VALVE DISC. 21-May-14 14033 1 SG 2B INSTALL EXPANDED TUBE PLUG IN STEAM 22-Mar-14 14035 GENERATOR 2B.

1 SG-2A INSTALL EXPANDED TUBE PLUGS IN STEAM 23-Mar-14 14036 GENERATOR 2A.