L-2017-019, Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1)

From kanterella
Jump to navigation Jump to search
Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1)
ML17039A669
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/06/2017
From: Synder M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2017-019
Download: ML17039A669 (9)


Text

  • F=PL..

FEB0 &' 2017 L-2017-019 10 CFR 50.36 10 CFR 50.55a U.S. Nuclear Regulatoty Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 In-Service Inspection Program lSI Fourth Interval- Third Period- SL1-27 Owner's Activity Report (OAR-1)

Enclosed is the St. Lucie Unit 1, SL1-27 outage, Owner's Activity Report, Form OAR-1. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL1-27 refueling outage ended on November 9, 2016.

Please contact Ken Frehafet at 772-467-77 48 if there ate any questions about this submittal.

Sincerely, Michael J Snyder Licensing Manager St. Lucie Plant Attachment MJS/KWF cc: NRC Region II Administrator NRC Site Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

L-2017-019 Attachment Page 1 of8 Report Number. ISI-PSL-i-2016 Plant: St. Lucie NvcJear Power Plant Unit 1 6501 South Ocean.Drive Jensen .Be101ch, Florida 34957 Commercial Service Date: DeCmber 21, 1976 Refueling Outage No.; SL 1-27 Current inspection Interval: lSI-Fourth Interval, IWE- Second Interval Current Inspection :Period: lSI- Third Period. !WE- Third Period

&lition and Addenda of Section XI applicable to the i!ispEiction plan: lSI & !WE

  • 2001 Ediiion v.~tn Addenda through 2003.

Pate and Revision .of inspection plan: lSI

  • March 19. .2615. Rev. 3

!WE- July 17.2015. Rev. 2 Edition and Addenda of Section Xl *appficable to repairs and replacements, if different than the .inspection plan: Same Code Cases Used: N-460. N-508-4, N-532'5. Nc566-2. N-624. N-658, Nc6S1-1. N-686-1 . N-700. N~722-1 . N-729-1. N-753, N-770~1 . .

CERTIFICATE OF CONFORMANCE.

I certifythat (a) the statements made in this ri;!p9rt a.re. correct. (b) the exanii(iations and tests meet ihe Inspection pian as required py !he ASfvlECode, Sectiqn XI; and (d) the repair/replaCment activities and evah;ations supporting the completion ofSL1-27 conform to the requirements of Section. XI:

Signed Q~QQQ_~ F> !l..R,\:'), C:...1L Date --=z."-'/'-'t_I<.JI~J"-*_

  • 0.(mer or Owner's Designee, Title CERTIFICATE OF II'JSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pre.ssureVessel Inspectors and the Stat£) or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut haveinspected the items described in this Owner's Activity Report, and state that, to the best of .my *knowledge and belief, the Ovmer has performed all acfivilies represented by this report in .accordance with the

, requirements of Section XI.

By' sig'ning this certificate neither !he Inspector nor his employer malses any warranty, expressed or Implied, I concerning the repair/replacement activities and -evaluation described in this report Furthermore, neither !he inspector I nor his e~mployer sh.ail b"' liablei.n aA~nner for any personal injury .or p  !

from or connecte w~ t~1 ~ i5;J.,Wiop("J)

. r.op.erty damag.e or loss of any kind arising

_ I

  • .* * . ~ Commissions N6J4c?CJ:LIJ{£,1 t91J983! 1

!nspe-~or'~ SJgQ<i!ture* / National ~o.atd, Stele, Pro.vince* .and Endoffi~ errts Date Q,Z 1

/0f !cJDt7//

1

L-2017-019 Attachment Page 2 of 8 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None None None

L-2017-019 Attachment Page 3 of 8 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 -4th Interval, 3rd Period, Outage 27 Repair I Code Date Item Description Description of Work Replacement Class Completed Plan Number REPLACE SE-02-4 AND ADJACENT PIPING BY 1 SE-02-4 2/1/2017 SL1-13077 WELDING 1 SE-02-4 REPLACE VALVE DISC 1/11/2017 SL1-13077 2 LCV-2110P REPLACE VALVE INTERNALS 1/18/2017 SL1-13084 2 V2326 REPLACE RELIEF VALVE DISC AND NOZZLE 10/29/2016 SL1-15060 1 RCP 182 REPLACE RCP 182 SEAL CARTRIDGE 1/18/2017 SL 1-16004 1 V3113 REPLACE CHECK VALVE DISC 1/11/2017 SL 1-16005 1 S/G 1A REPLACE SG 1A MANWAY FASTENERS 1/11/2017 SL 1-16006 1 RCP 182 REPLACE RCP 182 ROTATING ASSEMBLY 1/12/2017 SL 1-16007 3 HCV-14-3A REPLACE VALVE AND FASTENERS 1/18/2017 SL 1-16009 2 V8203 REPLACE MSSV FASTENERS 1/18/2017 SL 1-16012 2 V8204 REPLACE MSSV FASTENERS 12/15/2016 SL1-16013

L-2017-019 Attachment Page 4 of 8 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 -4th Interval, 3rd Period, Outage 27 Repair I Code Date Item Description Description of Work Replacement Class Completed Plan Number 2 V8206 REPLACE MSSV FASTENERS 12/15/2016 SL 1-16014 REPLACE FASTENERS ON PIPE ELBOW 3 CW-77 10/25/2016 SL1-16015 FOLLOWING INTERNAL PIPE INSPECTION 3 CW-386 REPLACE FLANGE FASTENERS 1/18/2017 SL1-16015 REPLACE SEAL WELD ON SOLENOID VALVE 2 SE-07-1 B 11/30/2016 SL 1-16016 FOLLOWING INTERNAL VALVE INSPECTION REPLACE SEAL WELD ON TARGET ROCK 2 SE-07-1A SOLENOID FOLLOWING INTERNAL VALVE 1/23/2017 SL1-16017 INSPECTION 3 SB14325 REPLACE VALVE AND FLANGE FASTENERS 1/11/2017 SL1-16018 2 HCV-08-2A REPLACE VALVE PLUG AND FASTENERS 1/23/2017 SL 1-16020 1 V1402 REPLACE PORV PILOT DISC 1/11/2017 SL 1-16022 2 V8209 REPLACE MSSV FLANGE FASTENERS 12/14/2016 SL 1-16023 2 V8214 REPLACE MSSV INLET FLANGE FASTENERS 12/15/2016 SL 1-16024 1 V1404 REPLACE PORV MAIN DISC 12/15/2016 SL 1-16025

L-2017-019 Attachment Page 5 of 8 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 -4th Interval, 3rd Period, Outage 27 Repair I Code Date Item Description Description of Work Replacement Class Completed Plan Number REMOVE I REINSTALL SEAL WELD ON TARGET 2 SE-07-2A 112312017 SL 1-16026 ROCK SOLENOID VALVE REPLACE VALVE DISC, BODY, BODY END, AND 3 HCV-21-7B 111112017 SL 1-16029 FASTENERS INSTALL PREFABRICATED REPLACEMENT PIPE 3 ISH-1, CW-11 SPOOL CW-11-2 BY BOLTED CONNECTION. 112412017 SL 1-16030 REPLACE RESTRAINT ISH-1 BY WELDING.

PREFABRICATE PIPE SPOOL CW-11-2 AND 3 CW-11 21112017 SL 1-16030 PIPE RESTRAINT ISH-1 BY WELDING REPLACE VALVE FLANGE FASTENERS FOR 3 CW-11 1012712016 SL 1-16030 SB21209 AND V21208 1 RC-005-86 REPLACE SPRING CAN SUPPORT RC-005-86 112412017 SL 1-16033 3 CCW HX 1A REPLACE END BELL FASTENERS 111812017 SL 1-16034 REPLACE CCW HX 1B END BELL FASTENERS 3 CCW HX 1B 1012712016 SL 1-16035 AND HX TUBES 3 SS-21-1 B REPLACE STRAINER FASTENERS 111212017 SL 1-16037 INSTALL SEAL WELD ON TARGET ROCK 2 SE-07-2B SOLENOID FOLLOWING INTERNAL VALVE 1113012016 SL 1-16038 INSPECTION.

3 ISH-4 REPLACE PIPE SUPPORT BY WELDING 112412017 SL 1-16042

L-2017-019 Attachment Page 6 of 8 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 -4th Interval, 3rd Period, Outage 27 Repair I Code Date Item Description Description of Work Replacement Class Completed Plan Number 2 V2324 REPLACE RELIEF VALVE INTERNALS 12/15/2016 SL 1-16045 REPLACE DEGRADED SUPPORT MEMBERS BY 3 CW-8009-44 1/31/2017 SL 1-16047 WELDING 1 1-120 REPLACE LOAD PIN ON SNUBBER 1-120 10/31/2016 SL 1-16048 REPLACE CHECK VALVE DISC AND 1 V3217 10/29/2016 SL 1-16049 FASTENERS REPLACE RELIEF VALVE WITH NEW SPARE 2 V2325 12/15/2016 SL 1-16050 VALVE.

REPLACE PIPE SPOOLS CW-72-4 AND CW-72-5 BY WELDING AND BOLTED CONNECTIONS.

3 CW-72 2/1/2017 SL 1-16053 REMOVE AND RE-INSTALL PIPE SUPPORTS TO FACILITATE PIPE SPOOL REPLACEMENT.

2 V8210 REPLACE MSSV FLANGE FASTENERS 12/15/2016 SL 1-16054 HVS- D MTR HX REPLACE HVS-1 D MOTOR HEAT EXCHANGER SL 1-16055 3 1 1/19/2017 BY WELDING HVS- C MTR HX REPLACE HVS-1C MOTOR HEAT EXCHANGER SL 1-16056 3 1 1/19/2017 BY WELDING HVS- B MTR HX REPLACE HVS-1B MOTOR HEAT EXCHANGER SL 1-16057 3 1 1/19/2017 BY WELDING HVS- A MTR HX REPLACE HVS-1A MOTOR HEAT EXCHAGER BY SL 1-16058 3 1 1/19/2017 WELDING

L-2017-019 Attachment Page 7 of 8 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 -4th Interval, 3rd Period, Outage 27 Repair I Code Date Item Description Description of Work Replacement Class Completed Plan Number 1 PRESSURIZER REPLACE PZR MANWAY STUDS AND NUTS 1/18/2017 SL 1-16059 2 V07172 REPLACE VALVE DISC 1/23/2017 SL 1-16066 3 FE-09-2A REPLACE FLANGES AND FLANGE FASTENERS 1/23/2017 SL 1-16067 REPLACE DRAIN PIPE AND FLANGE BY 3 CW-407 1/31/2017 SL 1-16068 WELDING AND BOLTED CONNECTION PERFORM WELD BUILD-UP ON INTERNAL PIPE 3 CW-11 CORROSION PIT TO RESTORE TO NOMINAL 1/24/2017 SL 1-16069 THICKNESS.

PERFORM WELD BUILD-UP ON DISC COUNTER BORE TO RESTORE ROUNDNESS. WELD ANTI-2 V08117 1/31/2017 SL 1-16070 ROTATIONAL PIN TO DISC. REPLACE TWO STUDS.

PERFORM WELD BUILDUP ON PIPE FLANGE 3 CW-105 1/23/2017 SL 1-16071 FACE TO RESTORE SEALING SURFACE 3 V09303 REPLACE VALVE BY WELDING 1/23/2017 SL 1-16074 3 AFW PP 1C REPLACE VALVE BONNET STUD 12/15/2016 SL 1-16075 MACHINE VALVE STUFFING BOX TO RESTORE 3 V12498 1/11/2017 SL 1-16076 UNIFIROM CYLINDRICAL SHAPE INSTALL REINFORCING GUSSETS FOR ISH-10 3 ISH-10 1/24/2017 SL 1-16077 ITEM #9 BY WELDING PER EC 287704

L-2017-019 Attachment Page 8 of 8 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 -4th Interval, 3rd Period, Outage 27 Repair I Code Date Item Description Description of Work Replacement Class Completed Plan Number 2 V8215 REPLACE MSSV INLET FLANGE FASTENERS 12/14/2016 SL 1-16081 2 V8212 REPLACE MSSV FASTENERS 1/12/2017 SL 1-16082