L-2010-202, In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1)

From kanterella
Jump to navigation Jump to search
In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1)
ML102520487
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/01/2010
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2010-202
Download: ML102520487 (5)


Text

0 Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 September 1, 2010 FPL L-2010-202 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 In-Service Inspection Program ISI Fourth Interval - First Period - Second Outage (SL1-23)

Owner's Activity Report (OAR-I)

Enclosed is the St. Lucie Unit 1, SL1-23 outage, Owner's Activity Report, Form OAR-1.

Form OAR-i implements Code Case N-532-4. The OAR-I report is prepared, certified, and submitted upon completion of each refueling outage. The SL1-23 refueling outage ended on June 14, 2010.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Eric S. atzman Licensing Manager St. Lucie Plant Attachment ESK/KWF jLf/~/~

an FPL Group company

St. Lucie Unit 1 L-2010-202 Docket No. 50-335 Attachment Page 1 of4 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number: ISI-PSL-1-2010 Plant: St. Lucie Nuclear Power Plant Unit 1 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: December 21, 1976 Refueling Outage No.: SL1-23 Current Inspection Interval: Fourth Current Inspection Period: First Edition and Addenda of Section Xl applicable to the Inspection plans: 2001 Edition with Addenda through 2003.

Date and Revision of inspection plan: 41h Interval-February 11, 2008, Rev. 0 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan:

Same Code Cases Used: N-460, N-532-4, N-533-1, N-566-2. N-613-1, N-624. N-648-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL-1-23 conform to the requirements of Section;XI.

Signed C;',*" ,'.44'*-,. Date /'+/-/

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

~ Commissions Z; -2

.. " Inspector's Signature National Board, State, Province, and Endorsements Date _ Y_- U -10

St. Lucie Unit I L-2010-202 Docket No. 50-335 Attachment Page 2 of 4 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE

St. Lucie Unit 1 L-2010-202 Docket No. 50-335 Attachment Page 3 of 4 TABLE 2 ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4th Interval, , st Period, Outage 23 Code Class Item Description Date Repelr)Replacement Description of Work Completed Plan Number 3 CC-32 REPLACE 1C CCW PP SUCTION AND 11/23/2009 5L 1- 09008 DISCHARGE SPRING CAN SUPPORTS.

2 SI-4.20 Replacement of threaded rod for hngi8770- 6h13/20 10 5L 1- 09030 0-198 SIH-12 for Line no 10" SI-420, 3 CC-3 GC-3 INSTALL NEW YPH-113 MSP 09160 4(19/2010 SL 1- 10008 1 SE-02-4 WELD BUILDUP ON BONNET 519/201U SL1- 10200 SE-02-4 WELD BUILD-UP ON EXISTING VALVE 5/2512010 SL 1- 10020 1 RC-113 REPLACE V1235/RC-113, 1Al 5/D/2010 SL 1- 10021 INTERMEDIATE DRAIN BY WELDING 1 R--116 REPLACE V1234/RC-116 1A2 5/23/2010 SL 1- 10022 INTERMEDIATE DRAIN BY WELDING RC-122 REPLACE RC-122 181 INTERMEDIATE 5/22/2010 SL 1z' 10023 DRAIN NOZZLE-TO-SAFE-END BY WELDING RC-125 REPLACE V12321RC-125 182 5/2212010 SL 1- 10024 INTERMEDIATE DRAINBYWELDING RO-148 REPLACE RC-148 IA2 CHARGING 5/24/2010 SL 1- 10025 NOZZLE-TO-SAFE-END BYWELDING R1C-150 REMOVE GRINDING MARKS BY 50/21/2010 SL 1- 10026 MECHANICAL MEANS RO-150 REPLACE RC-150 101 CHARGING 1/0/2010 SL 1- 19026 NOZZLE-TO-SAFE-END BYWELDING PC-109 REPLACE RC-109 131 SPRAY NOZZLE- 5/912010 SL 1- )0027 TO-SAFE-END BY WELDING RC-141 REPLACE RC-111 1B2 SPRAY NOZZLE- 5/812010 SL 1- 10028 -

TO-SAFE-END BY WELDING

St. Lucie Unit I L-2010-202 Docket No. 50-335 Attachment Page 4 of 4 TABLE 2 ABSTRACT OF REPAIRJREPLACCMENTACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4th Inlerval. 1 t Period, Outage 23 code Cleaes Iturn Description Date Repalr/Replacemenl Description of Work Completed Plan Number 1 RC-145 REPLACE RC-145 HOT LEO DRAIN BY 6/u/2010 SL 1- 10029 WELDING I SE-02-3 WELD BUILD-UP ON VALVE BODY 5/0712010 SL 1- 10036 3 CW-407 CW-407; REPLACE " FLANGE BY 5/3/2010 SL 1- 10042 WELDING 3 CW-11 CW-11:REPLACE PIPE SUPPORT ISH-3 613/2010 SL 1- 10058 3 CW-11 CW-11 REMOVE 2" DRAIN CON'N AND 5/3/2010 SL 1- 1000 PATCH BY WELDING.

1 PRZR PRZR;REPLACE MANWAY COVER BOLT 5/23/2010 SL 1- 10071