L-2012-301, In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1)

From kanterella
Jump to navigation Jump to search
In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1)
ML12214A432
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/20/2012
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2012-301 ISI-PSL-1-2011
Download: ML12214A432 (4)


Text

July 20, 2012 L-2012-301 S 10 CFR 50.36 FPL. 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 In-Service Inspection Program ISI Fourth Interval - Second Period - SL1-24 Owner's Activity Report (OAR- 1)

Enclosed is the St. Lucie Unit 1, SL1 -24 outage, Owner's Activity Report, Form OAR-1.

Form OAR-1 implements Code Case N-532-4. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL 1-24 refueling outage ended on April 21, 2012.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant Attachment ESK/KWF 0(4(7 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Unit 1 L-2012-301 Docket No. 50-335 Attachment Page 1 of 3 Report Number: ISI-PSL-1-2011 Plant: St. Lucie Nuclear Power Plant Unit 1 6501 South Ocean Drive Jensen.Beach,.Florida 34957 Commercial Service Date: December 21, 1976 Refueling Outage No.: SL1-24 Current Inspection Interval: Fourth Current Inspection Period: Second Edition and Addenda of Section XI applicable to the Inspection plan: 2001 Edition with Addenda through 2003.

Date and Revision of inspection plan: February 11, 2008, Rev. 1 Edition and Addenda of Section Xl applicable to repairs and replacements, If different than the inspection plan: Same Code Cases Used: N-460, N-532-4, N-533-1, N-566-2. N-616. N-6247 N-658, N-686-1, N-700, N-722-1,N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of SL1 -24 conform to the requirements of Section XI.

Signed oate Owner or Owner's Designee, Title

-* - 411. , i4'f4A #I~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from nnec d with this inspection.

_________________________________ Commissions A/IA6"#/= A,IV(',5 -- 4/"7//oo i...f'poctor'ss Sinature National Board, Slate. Province, and Endorsements Date ..TL, I% .

St. Lucie Unit 1 L-2012-301 Docket No. 50-335 Attachment Page 2 of 3 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED.SERVI CE Category and Item Number Item Description Evaluation Description None None None

St. Lucie Unit 1 L-2012-301 Docket No. 50-335 Attachment Page 3 of 3 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4th Interval, 2nd PeriDod,Outage 24 Code Class Item Description Date Repair/Replacement Description ol Wort Completds Plan Number 3 CC-33 REPLACEMENT OF SPRINGCAN AND 212(2012 SL 1- 11055

.. .. .... ... ........- DE-G. ADEO-* OPPO S RVST R UCT..... ................. . . .. .

STEEL.

3 CC-16 WELDBUILDUP REPAIR OF PIPING f1/12012 SL 1- 11076 DUETO CORROSION AT YPH-16 3 CW-30 REPAIR OF DEGRADED PIPING WITH 1/312012 SL 1- 11095 INTERNAL BOLTED ON PATCH PLATES.

3 CW-30 WELDED REPAIR OF CORROSION 1V212012 SL 1- 11099 AREAS 3 CW-73 WELDBUILDUP OF CORROSION 1/3=2012 SL1- 11100 AREAS, NOT THROUGH-WALL 3 CW-385 WELD BUILDUP OF CORRODED AREAS 1/312012 SL 1- 11108 ON FLANGE (INTERNAL) 3 CW-29 REPLACE DEGRADED ICWPIPING BY 211212012 SL 1- 12022 WELDING 3 CW-30 REPLACE DEGRADED ICW PIPING BY 3/3/2012 SL 1- 12025 WELDING 2 150 REPLACE PIPE CLAIP AND PERFORM 2/13(2012 SL 1- 12029 FUNCTIONAL TEST OF SNUBBER.

3 CW-29 REPAIR OF DEGRADED PIPING WITH 2114/2012 SL 1- 12029 INTERNAL BOLTED ON PATCH PLATES, 2 BF-19 REMOVE BASE METAL FLAW BY 2117(2012 SL 1- 12033 MECHANICAL MEANS 3 CW-30 REPAIR OF DEGRADED PIPING WITH 3/12/2012 SL 1- 12038 INTERNAL BOLTED ON PATCH PLATES.

3 CW-10 REPLACEMENT OF STRUCTURAL 3/27/2012 SL 1- 12043 STEEL MEMBERS ON DEGRADED SUPPORT ISH-`1 BYWELDING.

3 CWT78 REPLACEMENT OF SPHERICAL 3/212012 SL 1- 1 BEARINGS, CW-999-372.