Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-2022-048, Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report2022-03-21021 March 2022 Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report L-2021-220, Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1)2021-12-27027 December 2021 Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1) L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report L-2021-112, In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1)2021-08-13013 August 2021 In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1) L-2020-030, In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1)2020-02-18018 February 2020 In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1) L-2020-025, Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-42020-02-0707 February 2020 Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-4 L-2018-239, In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1)2018-12-28028 December 2018 In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1) L-2018-135, In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1)2018-07-0909 July 2018 In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1) L-2018-110, Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 02018-05-0202 May 2018 Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 0 L-2018-069, Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan2018-03-30030 March 2018 Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan L-2018-042, Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval2018-02-0909 February 2018 Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval L-2017-152, Refueling Outage SL2-23, Steam Generator Tube Inspection Report2017-09-13013 September 2017 Refueling Outage SL2-23, Steam Generator Tube Inspection Report L-2017-070, Refueling Outage SL1-27 Steam Generator Tube Inspection Report2017-04-27027 April 2017 Refueling Outage SL1-27 Steam Generator Tube Inspection Report L-2017-019, Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1)2017-02-0606 February 2017 Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1) L-2017-017, Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 02017-02-0202 February 2017 Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 0 L-2016-088, Report of 10 CFR 50.59 Plant Changes - Docket No. 50-3892016-04-19019 April 2016 Report of 10 CFR 50.59 Plant Changes - Docket No. 50-389 L-2016-089, Refueling Outage SL2-22, Steam Generator Tube Inspection Report2016-04-15015 April 2016 Refueling Outage SL2-22, Steam Generator Tube Inspection Report ML16076A4312016-03-0707 March 2016 St. Lucie, Unit 2, In-Service Inspection Plans Fourth Ten-Year Interval Relief Request 11 L-2016-015, In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1)2016-01-21021 January 2016 In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1) L-2015-204, In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1)2015-07-22022 July 2015 In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1) L-2015-126, License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan2015-05-11011 May 2015 License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan L-2015-063, In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply2015-03-0505 March 2015 In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply L-2014-360, Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 02014-12-0303 December 2014 Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 0 L-2014-339, Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 142014-11-0303 November 2014 Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-331, TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements2014-10-23023 October 2014 TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements L-2014-277, Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 172014-08-28028 August 2014 Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-224, In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l)2014-07-17017 July 2014 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l) L-2014-206, Third Ten-Year Interval Unit 2 Relief Request No. 142014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-208, Third Ten-Year Interval Unit 2 Relief Request No. 172014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-113, Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report2014-04-29029 April 2014 Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report L-2014-039, Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I)2014-02-0606 February 2014 Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I) L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2013-240, Fourth Ten-Year Interval, Relief Request No. 7, Rev. 02013-08-0505 August 2013 Fourth Ten-Year Interval, Relief Request No. 7, Rev. 0 L-2013-063, In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1)2013-02-20020 February 2013 In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1) L-2013-066, Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 02013-02-13013 February 2013 Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 0 L-2013-044, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 02013-02-0404 February 2013 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 0 L-2012-301, In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1)2012-07-20020 July 2012 In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1) L-2010-207, Fourth Ten-Year Interval Relief Request PR-92010-09-14014 September 2010 Fourth Ten-Year Interval Relief Request PR-9 L-2010-202, In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1)2010-09-0101 September 2010 In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1) L-2009-183, Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1)2009-08-14014 August 2009 Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1) L-2009-168, Response to Request for Additional Information, Third Interval Relief Request 312009-07-20020 July 2009 Response to Request for Additional Information, Third Interval Relief Request 31 L-2009-091, Steam Generator Tube Inspection Report2009-04-13013 April 2009 Steam Generator Tube Inspection Report L-2009-036, In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal2009-02-0909 February 2009 In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal L-2008-253, Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 112008-12-0303 December 2008 Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 11 L-2008-158, Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages2008-07-21021 July 2008 Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages L-2008-098, In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 22008-04-29029 April 2008 In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 2 L-2008-067, In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1)2008-03-26026 March 2008 In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1) L-2008-043, Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 02008-03-13013 March 2008 Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 0 L-2008-014, Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 302008-02-0404 February 2008 Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 30 L-2007-172, In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 102007-10-24024 October 2007 In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 10 2022-03-21
[Table view] Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
0I PL.
January 21,2016L-0105 10-FR20.36-1 10 CFR 50.536 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Fourth Interval - First Period - 5L2-22 Refueling Outage Owner's Activity Report (OAR-i)
Enclosed is the St. Lucie Unit 2, SL2-22 outage, Owner's Activity Report, Form OAR- 1.
The OAR-i report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-22 refueling outage ended on October 26, 2015.
Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.
Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-20 16-015 Attachment Page 1 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number, ISl-PSL-2-2018 Plant St Lucie Nuclear Powfer Plant Unit 2 6501 South Ocean Drive Jansen Beach, Florida 34957 Corn rercis Service Date: August 8,1"983 Refueling Outage No.: SL2-22 Current inspection Interval: 1S14:ourth, IWE-Second Current Inspection Period: 1St-First; IWE-Thtird Edition and Addenda of Section Xl applicable to the inspection plansw 1S1- 2007 w~ith Addenda through 2008 IWVE- 2001 Edition with Addenda through 2003 Date and Reviision of inspeclion plans: tSI-September 28, 2015, Revision I, IWE-July 17, 2016, Revision 2 Edition and Addenda of Section Xl applicable te rpaierse nd replacem#ents, itdifferent than th*e Inapectiorn plan: Same Code Cases Use:N525 -561 -4.N708-1. N-722-1. N-1-5"1 & N-i70-i.
CERTiI!CATE* OF CONFORM¢ANCE I certify that (a) the statements made in this report are con-act; (b) the examinations and tests meet the inspection plan as required by the ASME Code, Section Xl; and (c) t-he repairlreplacemnent activities and evaluations supportng the completion of SL2-22. conform to the requirements of Section Xi.
Owqner or Owner's Designee. Title CERTIFICATE OF INSERVJICE INSPECTION 1,[the undersigned, holding a valid commission issued by the National Board of B-oiler and Pressure Vessel Inspectors and the State or Province of Georgia and empioyed by the Hartford Steam Boiler inspection and Insurance Companyf of Connectiut have inspected the items described in this Owner's Actiwly Report, and state that, to the beat of my knowledge and ba~tlf, the :Owner has performed all activities represented by this report in accordance with the requirements oj Secton XI, By signing this certifi~cate nePjier the inspector :nor his employer ma'kes any warranty, expressed or implied, concerning th~erapaidreplacement aclivilies and ev'alualion desc_ribed in this report. Furthermore, anether the inspector nor his employer shal.l be Iiaplt*i any manner for any personal injuny or property damage or toaa of any kind arising from or connected with t nsposctgion)
Date I - I#%*Oi/*
L-20 16-0 15 Attachment Page 2 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE I ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, 1 st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3 rd Period Outage 22
L-2016-015 Attachment Page 3 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, jst Period Outage 22 PSL 2 - IWE 2 nd Interval, 3r* Period Outage 22 Code Class Item Description Description Date Repair/Replacement
_____________of Work Completed Plan Number 3 SB21 163 Replace valve, fasteners, and elbow 11/6/2015. SL2-1 2017 3 CW-3000-77 Remove/reinstall support by welding 10/28/2015 SL2-1 2017 3 CW9 Perform weld buildup on internal surface 11/9/2015 SL2-12017 CW9 of pipe elbow to restore wall thickness 3 CW9 Perform weld buildup of pipe elbow to 11/6/2015 SL2-12017 CW9 restore wall thickness 3 SJ2-A Tack weld expansion joint cover 11/19/2015 SL2-12017 SJ-21-4A attachments to expansion joint 1 VI1200 Replace relief valve inlet flange bolting 1/14/2016 SL2-1 3059 Perform weld buildup on internal surface of pipe elbow to restore wall thickness in six 3CW-1 1 locations. One repair is through-wall. 1/14/2016 SL2-1 3072 Remove/reinstall tube steel in support 2998-CW-3000-5 by welding. ______
3 V21162 Replace check valve flange fasteners 11/10/2015 SL2-13076 1 V3527 Replace check valve by welding 1/13/2016 SL2-14015 2 SE-03-2B Perform seal weld on solenoid valve 10/28/2015 SL2-14038 3 ~~~~~Prefabricate FLEX connection assemblies 1/2205 S-140 DOi0by welding______
3 D0-10 Install FLEX assemblies by welding 11/19/2015 SL2-14040 1 RCP 2A Replace RCP rotating assembly, pump 1/14/2016 SL2-1 5001 cover, and fasteners 2 H31 Remove abandoned RCP Seal Injection 10/28/2015 SL2-15001 2 CH-331 Charging system components and 1 SG 2B Install 2B Steam Generator tube plugs 11/13/2015 SL2-1 5004 3 CW-21 Replace CW-21 elbow fasteners following 10/10/2015 SL2-1 5005
__________________pipe inspection 2 SI1-459 Replace pipe with new spool pieces by 9/3/2015 SL2-1 5009
___________welding
L-2016-015 Attachment Page 4 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, 1 st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3 rd Period Outage 22 Code Class Item Description Description Date Repair/Replacement of Work Completed Plan Number 3 CW-10 Replace fasteners and valve by bolted 11/10/2015 SL2-15010 connection 3 CW-10 Remove/reinstall support by welding 1/14/2016 SL2-15010 3 C-0 Prefab replacement spool piece by 11/19/2015 SL2-1 5010 CWO welding 3 CW1 Replace pipe section by welding and 11/12/2015 SL2.-15010 bolted connection.
3 V207 Prefabricate V121067 FLEX assembly by 1/13/2016 SL2-15013 V121067 welding _____
3 V121068 Prefabricate V121068 FLEX assembly by 11/19/2015 SL2-15013
___________welding 3 ~~~~~InstallV121 067 FLEX connection 1//05 S2151 C-8 assembly by welding 3 C-68 ~~~Install V121 068 FLEX connection1/2205 S-103
_________ ~assembly by welding______
3 FS-502 ~~Prefabricate FLEX assembly on 11021 L-51 3 FS-502 ~~replacement spooi piece by welding 1/021 L-51 3 FS-502 Install replacement spool piece that includes new FLEX connection by bolted 11/12/2015 SL2-1 5014 2 V03061 Prefabricate FLEX connection assembly 11/18/2015 SL2-15015
__________________by welding 2 V03061 Install FLEX Connection assembly by 11/6/2015 SL2-15015 welding 2 V03062 Prefabricate FLEX connection assembly 11/11/12015 SL2-15015
___________by welding 2 V03062 Install FLEX Connection assembly by 11/12/2015 SL2-15015
_________ ~Welding.______
2 V03063 Prefabricate FLEX connection assembly 11/18/2015 SL2-15015
________by welding 2 V03063 Install FLEX connection assembly by 11/9/2015 S2-15015
________welding 2 V03064 Prefabricate FLEX connection assembly 11/19/2015 SL2-15015
___________by welding______
2 V03064 Install FLEX connection assembly by 11/6/2015 SL2-15015
__________________welding
L-2016-015 Attachment Page 5 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, 1st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3 rd Period Outage 22 CdCls ItmDsrpinDescription Date Repair/Replacement CdCls ItmDsrpinof Work Completed Plan Number 2 V03081 Install blind flange by bolted connection 11/12/2015 SL2-15015 2 V03062 Install blind flange by bolted connection 11/212015 SL2-15015 2 V03063 Install blind flange by bolted connection 11/2/2015 SL2-15015 2 V03064 Install blind flange by bolted connection 11/12/2015 SL2-15015 1 Pressurizer Replace PZR manway fasteners 1/14/2016 SL2-1 5016 2 V8204 Rebuild relief valve V8204 and replace 11/17/2015 SL2-15018 fasteners 2 RWT Prefab manway assembly 11/12/2015 SL2-1 5019 22RT RWT Replace includes manway assemblyV07496 FLEX Connection which by 11/10/2015 SL2-15019 3 BF-33 Install FLEX Connection assembly by 11/18/2015 SL2-15020 welding. ______________
3 F-5 Install FLEX Connection assembly by 11/18/2015 SL2-15020 B35 welding______ ________
V09826 /
3 V09827 Install blind flanges by bolted connection 10/27/2015 SL2-1 5020 1 SG 2A Install 2A Steam Generator tube plugs 11/17/2015 SL2-1 5021 3 SS-21-lA SS-21-1A replace flange fasteners 11/9/2015 SL2-1 5023 3 SS-21-1A Perform weld buildup of flange face 11/5/2015 SL2-15023 2 2-212 Replace Snubber 2-212 per EC 283056 9/24/2015 SL2-1 5025 2 2-217 & 2-218 Replace Snubbers 2-217 & 2-218 per EC 9/24/2015 SL2-15026 283066 ______________
2 2-225 Replace Snubber 2-225 per EC 283056 11/20/2015 SL2-15027 1 2-036 Replace Snubber 2-036 per EC 283066 11/20/2015 SL2-1 5028
L-2016-015 Attachment Page 6 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, Ist Period Outage 22 PSL 2 - IWE 2 nd Interval, 3* Period Outage 22 Code Class Item Description Description Date RepairlReplacement of Work Completed Plan Number 2 2-110 &2-111 Replace Snubbers 2-110 & 2-111 per EC 92/05 S2152
_____2830669/421 SL-59 1 2-113 Replace Snubber 2-113 per EC 283066 9/24/2015 SL2-1 5030 2 2-119 Replace Snubber 2-119 per EC 283066 9/24/2015 SL2-1 5031 2 2-112 Replace Snubber 2-112 per EC 283066 11/20/2015 SL2-15032 1 V1474 Replace PORV V1474 inlet flange 1/14/2016 SL2-15033 fasteners 1 V1474 Replace relief valve internals 10/29/2015 SL2-1 5033 1 SE-02-4 Replace solenoid valve SE-02-4 11/5/2015 SL2-1 5035 2 MV-08-1B Replace seal weld MV-08-1B 11/20/2015 SL2-15037 1 Vi1475 Replace inlet flange fasteners 10128/2015 SL2-1 5038 1 V3525 Replace valve by welding 1/14/2016 SL2-1 5040 2 LPSI PP 2B Replace inlet flange fasteners LPSI PP 1/7205 L2104 2B _1/7/2_5_L2-504 1 RPH-9 Replace RCP 2B1 spring can support nut 1/14/2016 SL2-1 5042 3 CW-3000- Replace support CW-3000-7010 by 1/13/2016 SL2-1 5044 7010 welding 3 HCV-21-7A Replaced degraded valve disc 11/9/2015 SL2-15046 3 V08130 Replace check valve by welding 11/18/2015 SL2-15048 2 MNT H AIR Replace flange fasteners on IA 11/18/2015 SL2-15049 AC 2B Accumulator flange 3 2-325 Spherical bearing is worn and in need of replacement 92/05 S2155 9/24/2015_SL2-1505 2 23091 MS-4103A- Replace parts on pipe restraint 10/28/2015 SL2-1 5051
L-2016-015 Attachment Page 7 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - SI 41M Interval, 1st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3* Period Outage 22 CdCls ItmDsrponDescription Date Repair/Replacement odCls ItmDsrponof Work Completed Plan Number 2 MS-79 Prep welds on MS-79 10/10/2015 SL2-15052 1 V3527 Perform VT'-I inspection on removed 11/10/2015 SL2-1 5054
_________ ~bolting.______
1 V3527 . Replace check valve V3527 by welding 10/29/2015 SL2-1 5054 1 V1200 Replace code safety relief valve inlet 10/28/2015 SL2-15057
___________________flange fasteners 1 V1201 Replace code safety relief valve inlet 10/27/2015 SL2-15058
___________________flange nuts______
1 V1202 Replace code safety relief valve inlet 10/27/2015 SL2-1 5059
___________________flange nuts 3 SH212042 Replace valve and adjacent pipe by 10/29/2015 SL2-1 5061 threaded connection and welding ______________
3 V2344 Install seal weld for V2344 11/18/2015 SL2-15062 2 CC-2080-20 Replace load pin on support CC-2080-20 1/13/2016 SL2-1 5063
0I PL.
January 21,2016L-0105 10-FR20.36-1 10 CFR 50.536 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Fourth Interval - First Period - 5L2-22 Refueling Outage Owner's Activity Report (OAR-i)
Enclosed is the St. Lucie Unit 2, SL2-22 outage, Owner's Activity Report, Form OAR- 1.
The OAR-i report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-22 refueling outage ended on October 26, 2015.
Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.
Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-20 16-015 Attachment Page 1 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number, ISl-PSL-2-2018 Plant St Lucie Nuclear Powfer Plant Unit 2 6501 South Ocean Drive Jansen Beach, Florida 34957 Corn rercis Service Date: August 8,1"983 Refueling Outage No.: SL2-22 Current inspection Interval: 1S14:ourth, IWE-Second Current Inspection Period: 1St-First; IWE-Thtird Edition and Addenda of Section Xl applicable to the inspection plansw 1S1- 2007 w~ith Addenda through 2008 IWVE- 2001 Edition with Addenda through 2003 Date and Reviision of inspeclion plans: tSI-September 28, 2015, Revision I, IWE-July 17, 2016, Revision 2 Edition and Addenda of Section Xl applicable te rpaierse nd replacem#ents, itdifferent than th*e Inapectiorn plan: Same Code Cases Use:N525 -561 -4.N708-1. N-722-1. N-1-5"1 & N-i70-i.
CERTiI!CATE* OF CONFORM¢ANCE I certify that (a) the statements made in this report are con-act; (b) the examinations and tests meet the inspection plan as required by the ASME Code, Section Xl; and (c) t-he repairlreplacemnent activities and evaluations supportng the completion of SL2-22. conform to the requirements of Section Xi.
Owqner or Owner's Designee. Title CERTIFICATE OF INSERVJICE INSPECTION 1,[the undersigned, holding a valid commission issued by the National Board of B-oiler and Pressure Vessel Inspectors and the State or Province of Georgia and empioyed by the Hartford Steam Boiler inspection and Insurance Companyf of Connectiut have inspected the items described in this Owner's Actiwly Report, and state that, to the beat of my knowledge and ba~tlf, the :Owner has performed all activities represented by this report in accordance with the requirements oj Secton XI, By signing this certifi~cate nePjier the inspector :nor his employer ma'kes any warranty, expressed or implied, concerning th~erapaidreplacement aclivilies and ev'alualion desc_ribed in this report. Furthermore, anether the inspector nor his employer shal.l be Iiaplt*i any manner for any personal injuny or property damage or toaa of any kind arising from or connected with t nsposctgion)
Date I - I#%*Oi/*
L-20 16-0 15 Attachment Page 2 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE I ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, 1 st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3 rd Period Outage 22
L-2016-015 Attachment Page 3 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, jst Period Outage 22 PSL 2 - IWE 2 nd Interval, 3r* Period Outage 22 Code Class Item Description Description Date Repair/Replacement
_____________of Work Completed Plan Number 3 SB21 163 Replace valve, fasteners, and elbow 11/6/2015. SL2-1 2017 3 CW-3000-77 Remove/reinstall support by welding 10/28/2015 SL2-1 2017 3 CW9 Perform weld buildup on internal surface 11/9/2015 SL2-12017 CW9 of pipe elbow to restore wall thickness 3 CW9 Perform weld buildup of pipe elbow to 11/6/2015 SL2-12017 CW9 restore wall thickness 3 SJ2-A Tack weld expansion joint cover 11/19/2015 SL2-12017 SJ-21-4A attachments to expansion joint 1 VI1200 Replace relief valve inlet flange bolting 1/14/2016 SL2-1 3059 Perform weld buildup on internal surface of pipe elbow to restore wall thickness in six 3CW-1 1 locations. One repair is through-wall. 1/14/2016 SL2-1 3072 Remove/reinstall tube steel in support 2998-CW-3000-5 by welding. ______
3 V21162 Replace check valve flange fasteners 11/10/2015 SL2-13076 1 V3527 Replace check valve by welding 1/13/2016 SL2-14015 2 SE-03-2B Perform seal weld on solenoid valve 10/28/2015 SL2-14038 3 ~~~~~Prefabricate FLEX connection assemblies 1/2205 S-140 DOi0by welding______
3 D0-10 Install FLEX assemblies by welding 11/19/2015 SL2-14040 1 RCP 2A Replace RCP rotating assembly, pump 1/14/2016 SL2-1 5001 cover, and fasteners 2 H31 Remove abandoned RCP Seal Injection 10/28/2015 SL2-15001 2 CH-331 Charging system components and 1 SG 2B Install 2B Steam Generator tube plugs 11/13/2015 SL2-1 5004 3 CW-21 Replace CW-21 elbow fasteners following 10/10/2015 SL2-1 5005
__________________pipe inspection 2 SI1-459 Replace pipe with new spool pieces by 9/3/2015 SL2-1 5009
___________welding
L-2016-015 Attachment Page 4 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, 1 st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3 rd Period Outage 22 Code Class Item Description Description Date Repair/Replacement of Work Completed Plan Number 3 CW-10 Replace fasteners and valve by bolted 11/10/2015 SL2-15010 connection 3 CW-10 Remove/reinstall support by welding 1/14/2016 SL2-15010 3 C-0 Prefab replacement spool piece by 11/19/2015 SL2-1 5010 CWO welding 3 CW1 Replace pipe section by welding and 11/12/2015 SL2.-15010 bolted connection.
3 V207 Prefabricate V121067 FLEX assembly by 1/13/2016 SL2-15013 V121067 welding _____
3 V121068 Prefabricate V121068 FLEX assembly by 11/19/2015 SL2-15013
___________welding 3 ~~~~~InstallV121 067 FLEX connection 1//05 S2151 C-8 assembly by welding 3 C-68 ~~~Install V121 068 FLEX connection1/2205 S-103
_________ ~assembly by welding______
3 FS-502 ~~Prefabricate FLEX assembly on 11021 L-51 3 FS-502 ~~replacement spooi piece by welding 1/021 L-51 3 FS-502 Install replacement spool piece that includes new FLEX connection by bolted 11/12/2015 SL2-1 5014 2 V03061 Prefabricate FLEX connection assembly 11/18/2015 SL2-15015
__________________by welding 2 V03061 Install FLEX Connection assembly by 11/6/2015 SL2-15015 welding 2 V03062 Prefabricate FLEX connection assembly 11/11/12015 SL2-15015
___________by welding 2 V03062 Install FLEX Connection assembly by 11/12/2015 SL2-15015
_________ ~Welding.______
2 V03063 Prefabricate FLEX connection assembly 11/18/2015 SL2-15015
________by welding 2 V03063 Install FLEX connection assembly by 11/9/2015 S2-15015
________welding 2 V03064 Prefabricate FLEX connection assembly 11/19/2015 SL2-15015
___________by welding______
2 V03064 Install FLEX connection assembly by 11/6/2015 SL2-15015
__________________welding
L-2016-015 Attachment Page 5 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, 1st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3 rd Period Outage 22 CdCls ItmDsrpinDescription Date Repair/Replacement CdCls ItmDsrpinof Work Completed Plan Number 2 V03081 Install blind flange by bolted connection 11/12/2015 SL2-15015 2 V03062 Install blind flange by bolted connection 11/212015 SL2-15015 2 V03063 Install blind flange by bolted connection 11/2/2015 SL2-15015 2 V03064 Install blind flange by bolted connection 11/12/2015 SL2-15015 1 Pressurizer Replace PZR manway fasteners 1/14/2016 SL2-1 5016 2 V8204 Rebuild relief valve V8204 and replace 11/17/2015 SL2-15018 fasteners 2 RWT Prefab manway assembly 11/12/2015 SL2-1 5019 22RT RWT Replace includes manway assemblyV07496 FLEX Connection which by 11/10/2015 SL2-15019 3 BF-33 Install FLEX Connection assembly by 11/18/2015 SL2-15020 welding. ______________
3 F-5 Install FLEX Connection assembly by 11/18/2015 SL2-15020 B35 welding______ ________
V09826 /
3 V09827 Install blind flanges by bolted connection 10/27/2015 SL2-1 5020 1 SG 2A Install 2A Steam Generator tube plugs 11/17/2015 SL2-1 5021 3 SS-21-lA SS-21-1A replace flange fasteners 11/9/2015 SL2-1 5023 3 SS-21-1A Perform weld buildup of flange face 11/5/2015 SL2-15023 2 2-212 Replace Snubber 2-212 per EC 283056 9/24/2015 SL2-1 5025 2 2-217 & 2-218 Replace Snubbers 2-217 & 2-218 per EC 9/24/2015 SL2-15026 283066 ______________
2 2-225 Replace Snubber 2-225 per EC 283056 11/20/2015 SL2-15027 1 2-036 Replace Snubber 2-036 per EC 283066 11/20/2015 SL2-1 5028
L-2016-015 Attachment Page 6 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - ISI 4 TH Interval, Ist Period Outage 22 PSL 2 - IWE 2 nd Interval, 3* Period Outage 22 Code Class Item Description Description Date RepairlReplacement of Work Completed Plan Number 2 2-110 &2-111 Replace Snubbers 2-110 & 2-111 per EC 92/05 S2152
_____2830669/421 SL-59 1 2-113 Replace Snubber 2-113 per EC 283066 9/24/2015 SL2-1 5030 2 2-119 Replace Snubber 2-119 per EC 283066 9/24/2015 SL2-1 5031 2 2-112 Replace Snubber 2-112 per EC 283066 11/20/2015 SL2-15032 1 V1474 Replace PORV V1474 inlet flange 1/14/2016 SL2-15033 fasteners 1 V1474 Replace relief valve internals 10/29/2015 SL2-1 5033 1 SE-02-4 Replace solenoid valve SE-02-4 11/5/2015 SL2-1 5035 2 MV-08-1B Replace seal weld MV-08-1B 11/20/2015 SL2-15037 1 Vi1475 Replace inlet flange fasteners 10128/2015 SL2-1 5038 1 V3525 Replace valve by welding 1/14/2016 SL2-1 5040 2 LPSI PP 2B Replace inlet flange fasteners LPSI PP 1/7205 L2104 2B _1/7/2_5_L2-504 1 RPH-9 Replace RCP 2B1 spring can support nut 1/14/2016 SL2-1 5042 3 CW-3000- Replace support CW-3000-7010 by 1/13/2016 SL2-1 5044 7010 welding 3 HCV-21-7A Replaced degraded valve disc 11/9/2015 SL2-15046 3 V08130 Replace check valve by welding 11/18/2015 SL2-15048 2 MNT H AIR Replace flange fasteners on IA 11/18/2015 SL2-15049 AC 2B Accumulator flange 3 2-325 Spherical bearing is worn and in need of replacement 92/05 S2155 9/24/2015_SL2-1505 2 23091 MS-4103A- Replace parts on pipe restraint 10/28/2015 SL2-1 5051
L-2016-015 Attachment Page 7 of 7 FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 - SI 41M Interval, 1st Period Outage 22 PSL 2 - IWE 2 nd Interval, 3* Period Outage 22 CdCls ItmDsrponDescription Date Repair/Replacement odCls ItmDsrponof Work Completed Plan Number 2 MS-79 Prep welds on MS-79 10/10/2015 SL2-15052 1 V3527 Perform VT'-I inspection on removed 11/10/2015 SL2-1 5054
_________ ~bolting.______
1 V3527 . Replace check valve V3527 by welding 10/29/2015 SL2-1 5054 1 V1200 Replace code safety relief valve inlet 10/28/2015 SL2-15057
___________________flange fasteners 1 V1201 Replace code safety relief valve inlet 10/27/2015 SL2-15058
___________________flange nuts______
1 V1202 Replace code safety relief valve inlet 10/27/2015 SL2-1 5059
___________________flange nuts 3 SH212042 Replace valve and adjacent pipe by 10/29/2015 SL2-1 5061 threaded connection and welding ______________
3 V2344 Install seal weld for V2344 11/18/2015 SL2-15062 2 CC-2080-20 Replace load pin on support CC-2080-20 1/13/2016 SL2-1 5063