L-2009-036, In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal

From kanterella
Jump to navigation Jump to search
In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal
ML090420491
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/09/2009
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2009-036
Download: ML090420491 (4)


Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 February 9, 2009 FPL L-2009-036 10 CFR 50.36 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 In-Service Inspection Program Fourth Interval - First Period Owner's Activity Report (OAR-1) Submittal Attached is the St. Lucie Unit 1 Forth Interval, First Period, first outage ASME Section XI Form OAR-1, Owner's Activity Report, for the SL 1-22 Outage. The Form OAR-1, Owner's Activity Report, implements Code Case N-532-4.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Eric S. Katzman Site Licensing Manager St. Lucie Plant ESK/KWF Attachment

  • -47

ýJWA an FPL Group company

St. Lucie Unit 1 L-2009-036 Docket No. 50-335 Attachment Page 1 of 3 FORM OAR-1 OWNER'S ACTMITY REPORT Report Number ISI-PSL-1-2008 Plant: St. Lucie Nuclear Power Plant Unit 1 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: December 21, 1976 Refueling Outage No.: SLI-22 Current Inspection Interval: Third/Fourth Current Inspection Period: Third/First Edition and Addenda of Section XI applicable to the inspection plans: 3 rdInterval-1989 Edition, No Addenda 4' Interval-2001 Edition with Addenda through 2003.

Date and Revision of Inspection plan: 3" Interval- August 31, 2006, Rev. 5 4?ý Interval-February 11. 2008. Rev, 0 Edition and Addenda of Section XI applicable to repairs and replacements, ifdifferent than the Inspection plan:

Same Code Cases Used: N-460, N-532-4. N-533-1. N-566-2. N-613-1. N-624, N-648-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL-1-22 conform to the requirements of Section XI.

Signed©Z ry.L M~ -SI Date /______

-?Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCT of Hartford Connecticut have Inspected the items described In this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report In accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repairlreplacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shail be liable In any manner for aný personal Injury or property damage or a loss of any kind arising from or connected with this Inspection, SCommissions F- tz tIz C, )

I'-nspector's Signature National Board, State, Province, and Endorsements Date__________

St. Lucie Unit 1 L-2009-036 Docket No. 50-335 Attachment Page 2 of 3 TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examinatjon Category and Item Number Item Description Evaluation Desciption None None None

7' A

St. Lucie Unit 1 L-2009-036 Docket No. 50-335 Attachment Page 3 of 3 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 1 - 4 th Interval, 1st Period, Outage 22 Code Item Description of Work Date Repair/Replacement Class Description Completed Plan Number 1 RC-108 Surge Nozzle Structural Weld 11/16/2008 SL-1-08018 Overlay 1 RC-147 "B" Hot Leg SDC Outlet 11/16/2008 SL-1-08019 Nozzzle Structural Weld Overlay 1 RC-162 "A" Hot Leg SDC Outlet 11/16/2008 SL-1-08020 Nozzzle Structural Weld Overlay 1 125 Adjust Snubber Cold Set By 11/13/2008 SL-1-08034 Cutting and Rewelding Strut