In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1)
ML20049A012
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/18/2020
From: Godes W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2020-030
Download: ML20049A012 (4)


Text

FEB 1 8 ZOZO L-2020-030 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner's Activity Report (OAR-1)

Enclosed is the St. Lucie Unit 1, SL1-29 outage, Owner's Activity Report, Form OAR-1. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL1-29 refueling outage ended on November 18, 2019.

Please contact Ken Frehafer at 772-467-77 48 if there are any questions about this submittal.

Sincerely, w;~~

Wyatt Gades Licensing Manager St. Lucie Plant Attachment WG/KWF cc: NRC Region II Administrator NRC Site Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

L-2020-030 Attachment Page 1of3 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISl-PSL-1-2019 Plant: St. Lucie Nuclear Power Plant Unit 1 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: December 21. 1976 Refueling Outage No.: SL 1-29 Current Inspection Interval: ISi-Fifth Interval, !WE-Third Interval Current Inspection Period: ISi - Second Outage First Period, IWE - First Outage First Period Edition and Addenda of Section XI applicable to the inspection plan: ISi Fifth Interval and IWE Third Interval - 2007 Edition through 2008 Addenda Date and Revision of inspection plan: ISi - Fifth Interval February 5, 2018 Rev. 0 IWE - July 15, 2018, Rev. 0 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases Used: N-532-5, N-706-1, N-722-1, N-729-4, N770-2 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL 1-29 conform to the requirements of Section XI.

'.Signed ~ /4., /ft_ /2.(f,1'1.; > ffL t!.AtJ ('(Jfol.,...,f 11;.. ... y Date '2.. h~/z .

.** Owner or Owner's Des1gnee, Title ' "1 **

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from r connected

  • his inspection.

Date ,2/14

, ,./d-0/l[J

L-2020-030 Attachment Page 2 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

L-2020-030 Attachment Page 3 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Repair I Code Item Date Description of Work Replacement Class Description Completed Plan Number 2 V08117 Perform Grinding on Valve Body to Remove Flaw 1/22/2020 SL1-19052