Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I)
ML14049A285
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/06/2014
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-039
Download: ML14049A285 (9)


Text

0FPL.

February 6, 2014 L-2014-039 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit I Docket No. 50-335 In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner's Activity Report (OAR-i)

Enclosed is the St. Lucie Unit 1, SL1-25 outage, Owner's Activity Report, Form OAR-1.

Form OAR-I implements Code Case N-532-4. The OAR-I report is prepared, certified, and submitted upon completion of each refueling outage. The SL1-25 refueling outage ended on November 9, 2013.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant Attachment ESK/KWF pal Ný Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment Report Number: ISI-PSL-1-2013 Plant: St. Lucie Nuclear Power Plant Unit 1 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: December 21, 1976 Refueling Outage No.: SL1 -25 Current Inspection Interval: Fourth Current Inspection Period: Second Edition and Addenda of Section XI applicable to the inspection plan: 2001 Edition with Addenda through 2003.

Date and Revision of inspection plan: September 30, 2011, Rev. 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases Used: N-460, N-532-4, N-533-1, N-566-2, N-616, N-624, N-658, N-686-1, N-700, N-722-1,N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL1-25 conform to the requirements of Section XI.

Signed r, o-.. Date /.&9 /1 uwner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall bpaliable in any manner for any personal injury or property damage or loss of any kind arising fronm o is i pection.

Commissions A(/A d,*.2 /I -lq3_,

Insp3-cor's Si ature . National Board, State, Province, and Endorsements Date // * '

Page 1 of 8

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None None None Page 2 of 8

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/Replacement Class Completed Plan Number 1PRZR REPLACEMENT OF PRESSURIZER MANWAY STUDS AND NUTS 4 1/16/2014 SL1-23125 EACH.

2SI-85312521SL-38 MODIFY 3" BUTT WELDED PIPING CLASS 2 & 3 AND NEW VALVE 1/15/2014 5L1-13089 V02360 PER EC 274002.

FABRICATE 3" BUTT WELDED BYPASS PIPING FOR LETDOWN HT 2 LTDN HT EXCH EX AND NEW WELDED ANCHOR SUPPORT CHVH-107 PER EC 1/15/2014 SL1-13089 274002 CLASS 2 & 3 PIPING.

3 INSTALL NEW 3" WELDED BYPASS LETDOWN BY PASS PIPING LINE LTDN HT EXCH1//01SL-38 1/15/2014 SLI-13089 NO. 3" CH-1003.

3 SB21232 VALVE WAS REPLACED WITH NEW VALVE ASSEMBLY. 1/14/2014 SL1-13035 3 SB21233 REPLACED VALVE WITH NEW VALVE ASSEMBLY 1/14/2014 SL1-13036 CUT OUT EXISTING PIPING AND INSTALL NEW SOCKET WELDED 2 V09118 NIPPLE AND PIPE CAP. CRACK IDENTIFIED IN 1" SOCKET WELD 1/14/2014 SL1-13107 FOR OUTLET FITTING FOR DRAIN VALVE.

3BF-3311421SL-35 PERFORMED WELD BUILD-UP OF BF-33 TO RESTORE PIPE WALL THICKNESS LOST DUE TO EXTERNAL CORROSION.

3BF-401//24 FABRICATED SUPPORT BF-4-H7 LOCATED ON 2" BF-40 BY 1/14/2014 SL1-13116 SL-36 WELDING.

2 V07130 REPLACE VALVE WEDGE. 1/13/2014 SL1-11028 2 FE-3322 REPLACE FLANGE BOLTING. 1/13/2014 SLI-11054 2 REPLACEMENT OF NOZZLE, DISC INSERT AND SPINDLE ASSEMBLY SR-07-1A1/324SL-00 1/13/2014 SLI-13010 IN RELIEF VALVE.

2 V09135 REPLACEMENT OF VALVE BONNET FASTENERS. 1/13/2014 SL1-13023 1 RCP lAl REPLACEMENT OF ROTATING ASSEMBLY, PUMP COVER AND 1/13/2014

/321 SL1-13078 L-37 COVER FASTENERS.

REPAIR BASE METAL ON EXTERNAL PIPE SURFACE BY WELDING. 1/13/2014 SL1-13112 3

BF-40 WELD BUILD UPUP TO NOMINAL WALL THICKNESS. SNM-W3HK2 Page 3 of 8

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 3 BF-28 REPLACED 4" BUTT WELDED PIPING. 1/13/2014 SL1-13114 3 BF-28 REPLACEMENT OF DEGRADED 4" PIPING BY WELDING. 1/13/2014 SL1-13114 3BF-281/304 PERFORM WELD BUILDUP OF EXCAVATION FW 02009 ON BF-28 1/13/2014 SLI-13114 SL-34 TO RESTORE WALL THICKNESS.

3 BF-33 REPLACEMENT OF PIPING BY WELDING. 1/8/2014 SL1-13104 3 TCV-14-4B Replaced disc assembly, bottom cover, bottom cover fasteners. 1/7/2014 SL1-13033 3 CW-11 WELD REPAIR OF 30" ICW PIPING DUE TO THROUGH WALL 1/7/2014 1721 5L1-13119 L-31 LEAKAGE IDENTIFIED PER CR 1916684.

2 1-042 REPLACE 2 MECHANICAL SNUBBERS WITH NEW LISEGA 1/6/2014 SL1-13070 HYDRAULIC SNUBBERS.

3 CW-407 REPLACEMENT OF FLANGE FASTENERS 1/6/2014 SL1-13128 3 CCW HX 1A REPLACED ONE END COVER NUT. 12/15/2013 SL1-13093 3BF-35 EXCAVATIONS OF CORROSION CELLS WAS PERFORMED BY 12/14/2013 1/421 SL1-12054 L-25 GRINDING. PIPING REPLACED PER WO 40125506-05.

3 BF-35 REPLACE PIPE BY WELDING. 12/14/2013 SL1-12054 1 V3217 REPLACED FASTENERS IN VALVE COVER AND HINGE PIN COVERS 1/29/2014 SL1-13094 3 V12174 REPLACE VALVE COVER FASTENERS DUE TO EXCESSIVE PAINT. 12/14/2013 SL1-13020 CONTAI NME NTT 2 REPLACED INLET FLANGE FASTENERS. 12/14/2013 SL1-13024 SPRAY PUMP 1B 3 MV-09-11 REPLACE BONNET BOLTING 12/5/2013 SL1-13025 3 SB21165 ADD NEW COUPLING NUT PER EC EC279987. 12/5/2013 SL1-13098 Page 4 of 8

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 1-001 1 Replace ITT 200 Grinnell snubber with new Lisega Model 3102 11/22/2013 SLI-12055 snubber per EC 276004. replace end paddle and bearing,.11-003 Replace ITTI200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12056 per EC 276004. Replace end paddle and bearing.

1 1-003 Replace ITIT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 S11-12057 per EC 276004. Replace end paddle and bearing.11-004 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12058 per EC 276004 11-005 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 511-12059 per EC 276004. Replace end paddle and bearing.11-006 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12060 per EC 276004.11-007 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12061 per EC 276004. Replace end paddle and bearing.

1-008 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12062 per EC 276004. Replace end paddle and bearing.11-009 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12063 per EC 276004. Replaced end paddle and bearing.11-010 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12064 per EC 276004. Replace end paddle and bearing.11-012 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12066 per EC 276004 11-013 Replace ITr 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 511-12067 per EC 276004 11-014 Replace ITT- 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12068 per EC 276004. Replace end paddle and bearing.11-015 Replace ITTI200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL112069 per EC 276004. Replace end paddle and bearing.11-016 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12070 per EC 276004. Replace end paddle and bearing.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13039 1U1-028 SNUBBER. Replace Replace eLd-p3039 end paddle.

Page 5 of 8

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 11-030 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 511-13040 L-34 SNUBBER. Replace load pin and end paddle.21-066 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13041 L-34 SNUBBER.

2 1-074 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13042 SNUBBER.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13043 2 1-077 11/22/2013 SL1-13044 SNUBBER.21-078 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13044 L-34 SNUBBER.21-081 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13046 L-34 SNUBBER.21-083 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13047 L-34 SNUBBER.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13048 2 1-088 11/22/2013 SL1-13047 SNUBBER.

2 1-089 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13048 SNUBBER. Replace bolting and load pin.11-093 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13051 L-34 SNUBBER. Replace end paddle.21-098 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13050 L-35 SNUBBER. Replace end paddle.21-106 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 511-13051 L-35 SNUBBER. Replace end paddle.21-107 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13054 L-35 SNUBBER. Replace end paddle.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13053 2U1-10820 SNUBBER.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 1/221 L-35 11-117 1/221 L-35 SNUBBER.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 1/221 L-35 11-121 1/221 L-35 SNUBBER.

Page 6 of 8

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 1 1-132 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 S11-13056 SNUBBER.

2 1-140 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13057 SNUBBER.

1 1-142 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 5L1-13058 SNUBBER.11-147 12/03 L-35 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13059 SNUBBER.

11-1511/2/03 5L-35 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 S11-13060 SNUBBER.

31-1631/2/03 SL-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13061 SNUBBER.21-173 1/221 L-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13062 SNUBBER.

2 1-174 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13063 SNUBBER.

11-1791/2/03 5L-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13064 SNUBBER. Replace cap screws.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13065 SNUBBER.

21-239912221SL-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13066 SNUBBER.11-031 12/03 L-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 S11-13067 SNUBBER. Replace end paddle.21-035 11/22/2013 SL1-13067 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC SNUBBER.

SNUBBER.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13069 SNUBBER.

REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13071 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13072 SNUBBER.

Page 7 of 8

St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 11-057 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13073 L-37 SNUBBER. Replace end paddle.21-058 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13074 L-37 SNUBBER.11-062 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13075 L-37 SNUBBER.11-063 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 1/221 L-37 SNUBBER. Replace end paddles.

3 MV-09-9 REPLACE BONNET BOLTING 11/21/2013 SL1-13026 B1-051 REPLACEMENT OF SNUBBERS AND PADDLES WITH LONGER 11/21/2013 1/121 SL1-13102 L-30 PADDLE.

2 V3143 REPLACE VALVE DISC AND SPRING IN PISTON CHECK VALVE. 11/19/2013 SL1-13007 3 TCV-14-4B REPLACED FLANGE FASTENERS. 12/3/2013 SL1-13033 3 CW-75 REPAIR PIPE SUPPORT ISH-12 welding required. 11/19/2013 SL1-13087 3 CW-16 REPLACEMENT OF STRUCTURAL STEEL IN SUPPORT ISH-16 11/18/2013 1/821 SLI-13113 L-31 LOCATED ON CW-16 BY WELDING.

1 RCP 1B2 MECHANICAL SEAL FLANGE REPLACED. 1/13/2014 SL1-13121 2 HCV-08-1B WELD IN PLACE NEW SEAT RING. 4/4/2013 SL1-13082 Page 8 of 8