|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-2022-048, Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report2022-03-21021 March 2022 Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report L-2021-220, Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1)2021-12-27027 December 2021 Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1) L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report L-2021-112, In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1)2021-08-13013 August 2021 In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1) L-2020-030, In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1)2020-02-18018 February 2020 In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1) L-2020-025, Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-42020-02-0707 February 2020 Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-4 L-2018-239, In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1)2018-12-28028 December 2018 In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1) L-2018-135, In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1)2018-07-0909 July 2018 In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1) L-2018-110, Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 02018-05-0202 May 2018 Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 0 L-2018-069, Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan2018-03-30030 March 2018 Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan L-2018-042, Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval2018-02-0909 February 2018 Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval L-2017-152, Refueling Outage SL2-23, Steam Generator Tube Inspection Report2017-09-13013 September 2017 Refueling Outage SL2-23, Steam Generator Tube Inspection Report L-2017-070, Refueling Outage SL1-27 Steam Generator Tube Inspection Report2017-04-27027 April 2017 Refueling Outage SL1-27 Steam Generator Tube Inspection Report L-2017-019, Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1)2017-02-0606 February 2017 Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1) L-2017-017, Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 02017-02-0202 February 2017 Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 0 L-2016-088, Report of 10 CFR 50.59 Plant Changes - Docket No. 50-3892016-04-19019 April 2016 Report of 10 CFR 50.59 Plant Changes - Docket No. 50-389 L-2016-089, Refueling Outage SL2-22, Steam Generator Tube Inspection Report2016-04-15015 April 2016 Refueling Outage SL2-22, Steam Generator Tube Inspection Report ML16076A4312016-03-0707 March 2016 St. Lucie, Unit 2, In-Service Inspection Plans Fourth Ten-Year Interval Relief Request 11 L-2016-015, In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1)2016-01-21021 January 2016 In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1) L-2015-204, In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1)2015-07-22022 July 2015 In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1) L-2015-126, License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan2015-05-11011 May 2015 License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan L-2015-063, In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply2015-03-0505 March 2015 In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply L-2014-360, Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 02014-12-0303 December 2014 Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 0 L-2014-339, Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 142014-11-0303 November 2014 Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-331, TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements2014-10-23023 October 2014 TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements L-2014-277, Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 172014-08-28028 August 2014 Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-224, In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l)2014-07-17017 July 2014 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l) L-2014-206, Third Ten-Year Interval Unit 2 Relief Request No. 142014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-208, Third Ten-Year Interval Unit 2 Relief Request No. 172014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-113, Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report2014-04-29029 April 2014 Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report L-2014-039, Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I)2014-02-0606 February 2014 Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I) L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2013-240, Fourth Ten-Year Interval, Relief Request No. 7, Rev. 02013-08-0505 August 2013 Fourth Ten-Year Interval, Relief Request No. 7, Rev. 0 L-2013-063, In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1)2013-02-20020 February 2013 In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1) L-2013-066, Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 02013-02-13013 February 2013 Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 0 L-2013-044, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 02013-02-0404 February 2013 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 0 L-2012-301, In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1)2012-07-20020 July 2012 In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1) L-2010-207, Fourth Ten-Year Interval Relief Request PR-92010-09-14014 September 2010 Fourth Ten-Year Interval Relief Request PR-9 L-2010-202, In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1)2010-09-0101 September 2010 In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1) L-2009-183, Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1)2009-08-14014 August 2009 Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1) L-2009-168, Response to Request for Additional Information, Third Interval Relief Request 312009-07-20020 July 2009 Response to Request for Additional Information, Third Interval Relief Request 31 L-2009-091, Steam Generator Tube Inspection Report2009-04-13013 April 2009 Steam Generator Tube Inspection Report L-2009-036, In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal2009-02-0909 February 2009 In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal L-2008-253, Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 112008-12-0303 December 2008 Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 11 L-2008-158, Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages2008-07-21021 July 2008 Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages L-2008-098, In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 22008-04-29029 April 2008 In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 2 L-2008-067, In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1)2008-03-26026 March 2008 In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1) L-2008-043, Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 02008-03-13013 March 2008 Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 0 L-2008-014, Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 302008-02-0404 February 2008 Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 30 L-2007-172, In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 102007-10-24024 October 2007 In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 10 2022-03-21
[Table view] Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
0FPL.
February 6, 2014 L-2014-039 10 CFR 50.36 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit I Docket No. 50-335 In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner's Activity Report (OAR-i)
Enclosed is the St. Lucie Unit 1, SL1-25 outage, Owner's Activity Report, Form OAR-1.
Form OAR-I implements Code Case N-532-4. The OAR-I report is prepared, certified, and submitted upon completion of each refueling outage. The SL1-25 refueling outage ended on November 9, 2013.
Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.
Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant Attachment ESK/KWF pal Ný Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment Report Number: ISI-PSL-1-2013 Plant: St. Lucie Nuclear Power Plant Unit 1 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: December 21, 1976 Refueling Outage No.: SL1 -25 Current Inspection Interval: Fourth Current Inspection Period: Second Edition and Addenda of Section XI applicable to the inspection plan: 2001 Edition with Addenda through 2003.
Date and Revision of inspection plan: September 30, 2011, Rev. 2 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases Used: N-460, N-532-4, N-533-1, N-566-2, N-616, N-624, N-658, N-686-1, N-700, N-722-1,N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL1-25 conform to the requirements of Section XI.
Signed r, o-.. Date /.&9 /1 uwner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall bpaliable in any manner for any personal injury or property damage or loss of any kind arising fronm o is i pection.
Commissions A(/A d,*.2 /I -lq3_,
Insp3-cor's Si ature . National Board, State, Province, and Endorsements Date // * '
Page 1 of 8
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None None None Page 2 of 8
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/Replacement Class Completed Plan Number 1PRZR REPLACEMENT OF PRESSURIZER MANWAY STUDS AND NUTS 4 1/16/2014 SL1-23125 EACH.
2SI-85312521SL-38 MODIFY 3" BUTT WELDED PIPING CLASS 2 & 3 AND NEW VALVE 1/15/2014 5L1-13089 V02360 PER EC 274002.
FABRICATE 3" BUTT WELDED BYPASS PIPING FOR LETDOWN HT 2 LTDN HT EXCH EX AND NEW WELDED ANCHOR SUPPORT CHVH-107 PER EC 1/15/2014 SL1-13089 274002 CLASS 2 & 3 PIPING.
3 INSTALL NEW 3" WELDED BYPASS LETDOWN BY PASS PIPING LINE LTDN HT EXCH1//01SL-38 1/15/2014 SLI-13089 NO. 3" CH-1003.
3 SB21232 VALVE WAS REPLACED WITH NEW VALVE ASSEMBLY. 1/14/2014 SL1-13035 3 SB21233 REPLACED VALVE WITH NEW VALVE ASSEMBLY 1/14/2014 SL1-13036 CUT OUT EXISTING PIPING AND INSTALL NEW SOCKET WELDED 2 V09118 NIPPLE AND PIPE CAP. CRACK IDENTIFIED IN 1" SOCKET WELD 1/14/2014 SL1-13107 FOR OUTLET FITTING FOR DRAIN VALVE.
3BF-3311421SL-35 PERFORMED WELD BUILD-UP OF BF-33 TO RESTORE PIPE WALL THICKNESS LOST DUE TO EXTERNAL CORROSION.
3BF-401//24 FABRICATED SUPPORT BF-4-H7 LOCATED ON 2" BF-40 BY 1/14/2014 SL1-13116 SL-36 WELDING.
2 V07130 REPLACE VALVE WEDGE. 1/13/2014 SL1-11028 2 FE-3322 REPLACE FLANGE BOLTING. 1/13/2014 SLI-11054 2 REPLACEMENT OF NOZZLE, DISC INSERT AND SPINDLE ASSEMBLY SR-07-1A1/324SL-00 1/13/2014 SLI-13010 IN RELIEF VALVE.
2 V09135 REPLACEMENT OF VALVE BONNET FASTENERS. 1/13/2014 SL1-13023 1 RCP lAl REPLACEMENT OF ROTATING ASSEMBLY, PUMP COVER AND 1/13/2014
/321 SL1-13078 L-37 COVER FASTENERS.
REPAIR BASE METAL ON EXTERNAL PIPE SURFACE BY WELDING. 1/13/2014 SL1-13112 3
BF-40 WELD BUILD UPUP TO NOMINAL WALL THICKNESS. SNM-W3HK2 Page 3 of 8
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 3 BF-28 REPLACED 4" BUTT WELDED PIPING. 1/13/2014 SL1-13114 3 BF-28 REPLACEMENT OF DEGRADED 4" PIPING BY WELDING. 1/13/2014 SL1-13114 3BF-281/304 PERFORM WELD BUILDUP OF EXCAVATION FW 02009 ON BF-28 1/13/2014 SLI-13114 SL-34 TO RESTORE WALL THICKNESS.
3 BF-33 REPLACEMENT OF PIPING BY WELDING. 1/8/2014 SL1-13104 3 TCV-14-4B Replaced disc assembly, bottom cover, bottom cover fasteners. 1/7/2014 SL1-13033 3 CW-11 WELD REPAIR OF 30" ICW PIPING DUE TO THROUGH WALL 1/7/2014 1721 5L1-13119 L-31 LEAKAGE IDENTIFIED PER CR 1916684.
2 1-042 REPLACE 2 MECHANICAL SNUBBERS WITH NEW LISEGA 1/6/2014 SL1-13070 HYDRAULIC SNUBBERS.
3 CW-407 REPLACEMENT OF FLANGE FASTENERS 1/6/2014 SL1-13128 3 CCW HX 1A REPLACED ONE END COVER NUT. 12/15/2013 SL1-13093 3BF-35 EXCAVATIONS OF CORROSION CELLS WAS PERFORMED BY 12/14/2013 1/421 SL1-12054 L-25 GRINDING. PIPING REPLACED PER WO 40125506-05.
3 BF-35 REPLACE PIPE BY WELDING. 12/14/2013 SL1-12054 1 V3217 REPLACED FASTENERS IN VALVE COVER AND HINGE PIN COVERS 1/29/2014 SL1-13094 3 V12174 REPLACE VALVE COVER FASTENERS DUE TO EXCESSIVE PAINT. 12/14/2013 SL1-13020 CONTAI NME NTT 2 REPLACED INLET FLANGE FASTENERS. 12/14/2013 SL1-13024 SPRAY PUMP 1B 3 MV-09-11 REPLACE BONNET BOLTING 12/5/2013 SL1-13025 3 SB21165 ADD NEW COUPLING NUT PER EC EC279987. 12/5/2013 SL1-13098 Page 4 of 8
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 1-001 1 Replace ITT 200 Grinnell snubber with new Lisega Model 3102 11/22/2013 SLI-12055 snubber per EC 276004. replace end paddle and bearing,.11-003 Replace ITTI200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12056 per EC 276004. Replace end paddle and bearing.
1 1-003 Replace ITIT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 S11-12057 per EC 276004. Replace end paddle and bearing.11-004 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12058 per EC 276004 11-005 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 511-12059 per EC 276004. Replace end paddle and bearing.11-006 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12060 per EC 276004.11-007 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12061 per EC 276004. Replace end paddle and bearing.
1-008 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12062 per EC 276004. Replace end paddle and bearing.11-009 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12063 per EC 276004. Replaced end paddle and bearing.11-010 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12064 per EC 276004. Replace end paddle and bearing.11-012 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12066 per EC 276004 11-013 Replace ITr 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 511-12067 per EC 276004 11-014 Replace ITT- 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SLI-12068 per EC 276004. Replace end paddle and bearing.11-015 Replace ITTI200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL112069 per EC 276004. Replace end paddle and bearing.11-016 Replace ITT 200 Grinnell snubber with Lisega Model 3102 snubber 11/22/2013 SL1-12070 per EC 276004. Replace end paddle and bearing.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13039 1U1-028 SNUBBER. Replace Replace eLd-p3039 end paddle.
Page 5 of 8
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 11-030 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 511-13040 L-34 SNUBBER. Replace load pin and end paddle.21-066 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13041 L-34 SNUBBER.
2 1-074 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13042 SNUBBER.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13043 2 1-077 11/22/2013 SL1-13044 SNUBBER.21-078 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13044 L-34 SNUBBER.21-081 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13046 L-34 SNUBBER.21-083 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13047 L-34 SNUBBER.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13048 2 1-088 11/22/2013 SL1-13047 SNUBBER.
2 1-089 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13048 SNUBBER. Replace bolting and load pin.11-093 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13051 L-34 SNUBBER. Replace end paddle.21-098 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13050 L-35 SNUBBER. Replace end paddle.21-106 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 511-13051 L-35 SNUBBER. Replace end paddle.21-107 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13054 L-35 SNUBBER. Replace end paddle.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13053 2U1-10820 SNUBBER.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 1/221 L-35 11-117 1/221 L-35 SNUBBER.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 1/221 L-35 11-121 1/221 L-35 SNUBBER.
Page 6 of 8
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 1 1-132 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 S11-13056 SNUBBER.
2 1-140 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13057 SNUBBER.
1 1-142 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 5L1-13058 SNUBBER.11-147 12/03 L-35 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13059 SNUBBER.
11-1511/2/03 5L-35 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 S11-13060 SNUBBER.
31-1631/2/03 SL-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13061 SNUBBER.21-173 1/221 L-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13062 SNUBBER.
2 1-174 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13063 SNUBBER.
11-1791/2/03 5L-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13064 SNUBBER. Replace cap screws.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13065 SNUBBER.
21-239912221SL-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SL1-13066 SNUBBER.11-031 12/03 L-36 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 S11-13067 SNUBBER. Replace end paddle.21-035 11/22/2013 SL1-13067 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC SNUBBER.
SNUBBER.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13069 SNUBBER.
REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13071 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 SLI-13072 SNUBBER.
Page 7 of 8
St. Lucie Unit 1 L-2014-039 Docket No. 50-335 Attachment TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 11-057 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13073 L-37 SNUBBER. Replace end paddle.21-058 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SL1-13074 L-37 SNUBBER.11-062 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 11/22/2013 1/221 SLI-13075 L-37 SNUBBER.11-063 REPLACE MECHANICAL SNUBBER WITH NEW LISEGA HYDRAULIC 1/221 L-37 SNUBBER. Replace end paddles.
3 MV-09-9 REPLACE BONNET BOLTING 11/21/2013 SL1-13026 B1-051 REPLACEMENT OF SNUBBERS AND PADDLES WITH LONGER 11/21/2013 1/121 SL1-13102 L-30 PADDLE.
2 V3143 REPLACE VALVE DISC AND SPRING IN PISTON CHECK VALVE. 11/19/2013 SL1-13007 3 TCV-14-4B REPLACED FLANGE FASTENERS. 12/3/2013 SL1-13033 3 CW-75 REPAIR PIPE SUPPORT ISH-12 welding required. 11/19/2013 SL1-13087 3 CW-16 REPLACEMENT OF STRUCTURAL STEEL IN SUPPORT ISH-16 11/18/2013 1/821 SLI-13113 L-31 LOCATED ON CW-16 BY WELDING.
1 RCP 1B2 MECHANICAL SEAL FLANGE REPLACED. 1/13/2014 SL1-13121 2 HCV-08-1B WELD IN PLACE NEW SEAT RING. 4/4/2013 SL1-13082 Page 8 of 8