In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1)
ML18362A112
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/28/2018
From: Snyder M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2018-239
Download: ML18362A112 (4)


Text

DEC 2 8 2018

  • I=PL.

U. S. Nuclear Regulatory Commission L-2018-239 10 CFR 50.36 10 CFR 50.55a Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program lSI Fourth Interval- Second Period- SL2-24 Refueling Outage Owner's Activity Report (OAR-1)

Enclosed is the St. Lucie Unit 2, SL2-24 outage, Owner's Activity Report, Form OAR-1.

The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-24 refueling outage ended on October 3, 2018.

Please contact Ken Frehafer at 772-467-7748 if there are any questions about this submittal.

Sincerely, Michael J Snyder Licensing Manager St. Lucie Plant MJS/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

L-2018-239 Attachment Page 1 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: lSI - PSL2 2018 Plant: St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: PSL2-24 Current Inspection Interval: lSI-Fourth !WE-Third Current Inspection Period: lSI-Second, !WE-First Edition and Addenda of Section XI applicable to the inspection plans: lSI - 2007 Edition through 2008 Addenda and IWE - 2007 Edition through 2008 Addenda Date and Revision of inspection plans: lSI-January 30, 2017. Revision 2. IWE-July 15. 2018, Revision 0 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan :

Same Code Cases Used: N-532-5. N-586-1, N-638-4, N-706-1, N-722-1, N-751, N-729-4, N-770-2. & 2142-2 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and J evaluations supporting the completion of PSL2-24 conform to the requirements of Section XL CERTIFICATE OF INSE.RVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this OWner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, ,

concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the ~

inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of i any kind a 'sir - nnected 11.~th this inspection.

  • Commissions NB 14292 R, N, I
  • GA983 National Board, State, Province, and Endorsements Date [Z -t 0 - I /j

L-2018-239 Attachment Page 2 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 - lSI 4th Interval, 2nd Period- Outage 24 PSL 2- IWE 3rd Interval, 1st Period- Outage 24 Examination Category and Item Description Evaluation Description Item Number None None None

L-2018-239 Attachment Page 3 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT Table 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 -IS 14th Interval, 2nd Period- Outage 24 PSL 2 -IWE 3rd Interval, 1st Period- Outage 24 Repair I Code Item Date Description of Work Replacement Class Description Completed Plan Number REPLACE PRESSURIZER NOZZLE ALLOY 1 PZR 12/5/2018 SL2-18064 600 WELD PAD WITH ALLOY 690