MONTHYEARL-2022-048, Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report2022-03-21021 March 2022 Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report L-2021-220, Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1)2021-12-27027 December 2021 Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1) L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report L-2021-112, In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1)2021-08-13013 August 2021 In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1) L-2020-030, In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1)2020-02-18018 February 2020 In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1) L-2020-025, Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-42020-02-0707 February 2020 Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-4 L-2018-239, In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1)2018-12-28028 December 2018 In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1) L-2018-135, In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1)2018-07-0909 July 2018 In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1) L-2018-110, Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 02018-05-0202 May 2018 Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 0 L-2018-069, Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan2018-03-30030 March 2018 Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan L-2018-042, Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval2018-02-0909 February 2018 Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval L-2017-152, Refueling Outage SL2-23, Steam Generator Tube Inspection Report2017-09-13013 September 2017 Refueling Outage SL2-23, Steam Generator Tube Inspection Report L-2017-070, Refueling Outage SL1-27 Steam Generator Tube Inspection Report2017-04-27027 April 2017 Refueling Outage SL1-27 Steam Generator Tube Inspection Report L-2017-019, Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1)2017-02-0606 February 2017 Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1) L-2017-017, Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 02017-02-0202 February 2017 Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 0 L-2016-088, Report of 10 CFR 50.59 Plant Changes - Docket No. 50-3892016-04-19019 April 2016 Report of 10 CFR 50.59 Plant Changes - Docket No. 50-389 L-2016-089, Refueling Outage SL2-22, Steam Generator Tube Inspection Report2016-04-15015 April 2016 Refueling Outage SL2-22, Steam Generator Tube Inspection Report ML16076A4312016-03-0707 March 2016 St. Lucie, Unit 2, In-Service Inspection Plans Fourth Ten-Year Interval Relief Request 11 L-2016-015, In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1)2016-01-21021 January 2016 In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1) L-2015-204, In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1)2015-07-22022 July 2015 In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1) L-2015-126, License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan2015-05-11011 May 2015 License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan L-2015-063, In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply2015-03-0505 March 2015 In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply L-2014-360, Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 02014-12-0303 December 2014 Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 0 L-2014-339, Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 142014-11-0303 November 2014 Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-331, TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements2014-10-23023 October 2014 TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements L-2014-277, Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 172014-08-28028 August 2014 Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-224, In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l)2014-07-17017 July 2014 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l) L-2014-206, Third Ten-Year Interval Unit 2 Relief Request No. 142014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-208, Third Ten-Year Interval Unit 2 Relief Request No. 172014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-113, Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report2014-04-29029 April 2014 Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report L-2014-039, Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I)2014-02-0606 February 2014 Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I) L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2013-240, Fourth Ten-Year Interval, Relief Request No. 7, Rev. 02013-08-0505 August 2013 Fourth Ten-Year Interval, Relief Request No. 7, Rev. 0 L-2013-063, In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1)2013-02-20020 February 2013 In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1) L-2013-066, Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 02013-02-13013 February 2013 Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 0 L-2013-044, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 02013-02-0404 February 2013 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 0 L-2012-301, In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1)2012-07-20020 July 2012 In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1) L-2010-207, Fourth Ten-Year Interval Relief Request PR-92010-09-14014 September 2010 Fourth Ten-Year Interval Relief Request PR-9 L-2010-202, In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1)2010-09-0101 September 2010 In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1) L-2009-183, Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1)2009-08-14014 August 2009 Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1) L-2009-168, Response to Request for Additional Information, Third Interval Relief Request 312009-07-20020 July 2009 Response to Request for Additional Information, Third Interval Relief Request 31 L-2009-091, Steam Generator Tube Inspection Report2009-04-13013 April 2009 Steam Generator Tube Inspection Report L-2009-036, In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal2009-02-0909 February 2009 In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal L-2008-253, Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 112008-12-0303 December 2008 Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 11 L-2008-158, Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages2008-07-21021 July 2008 Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages L-2008-098, In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 22008-04-29029 April 2008 In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 2 L-2008-067, In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1)2008-03-26026 March 2008 In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1) L-2008-043, Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 02008-03-13013 March 2008 Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 0 L-2008-014, Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 302008-02-0404 February 2008 Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 30 L-2007-172, In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 102007-10-24024 October 2007 In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 10 2022-03-21
[Table view] Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
FEB O9 2018 L-2018-042 10 CFR 50.55a U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
St. Lucie Unit 1 Docket No. 50-335 Renewed Operating License DPR-67 Snubber Program Plan Submittal Pursuant to 10 CFR 50.55a (g)(4), Florida Power & Light Company (FPL) is updating its snubber program for the fifth 10-year inservice testing interval at the St Lucie Nuclear Plant, Unit 1 (PSL-1).
The Code Edition and Addenda applicable to PSL-1 for the fifth inservice testing interval is the ASME OM Code 2004 Edition through 2006 Addenda. Paragraph 50.55a (b)(3)(v) requires ASME OM Code, Subsection ISTD, Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants, to be used for examination and testing of snubbers. The fifth 10-year interval for snubbers begins February 11, 2018.
Attachment 1 provides the PSL-1 Snubber Program Plan for the Fifth Ten Year Interval. FPL is providing this plan for information only in accordance with the requirement of the ASME OM Code, ISTA-3200 and is not requesting NRC approval of this plan. This plan does not include any new commitments.
If you should have any questions, please contact Mr. Ken Frehafer at (772) 467-7748.
Sincerely, Michael J. Snyder Licensing Manager St. Lucie Plant Attachments:
- 1. St. Lucie Unit 1 Snubber Testing Program Plan Fifth 10-Year Interval Attachment MJS/KWF cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Units 1 and 2 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
Florida Power & Light Company Attachment 1 St. Lucie Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 St. Lucie Plant Unit 1 Snubber Testing Program Plan Fifth 10-Year Interval Beginning February 11, 2018 Ending February 10, 2028 USNRC DOCKET NO. 50-335 RENEWED OPERATING LICENSE NO. DPR-67 Revision 0 Florida Power & Light Company St. Lucie Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 2/1/2018 Rev 0 Page 1 of 6
Florida Power & Light Company Attachment 1 St. Lucie Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 Revision Log Effective Revision Description Prepared: Date Approved: Date Date IST Snubber Engineering Coordinator Manager 2/11/2018 Updated Snubber Program See EC 290451 See EC 290451 Plan for fifth 10-year Milestone 140 Milestone 140 interval 2/1/2018 Rev 0 Page 2 of 6
Florida Power & Light Company Attachment 1 St. Lucie Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 TABLE OF CONTENTS SECTION
1.0 INTRODUCTION
2.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING REQUIREMENTS:
3.0 EXAMINATION and TESTING METHODS:
4.0 EXAMINATION and TESTING FREQUENCY:
5.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING EVAUATION:
6.0 REPAIR, REPLACEMENT, AND MODIFICATION REQUIREMENTS:
7.0 SCHEDULING
8.0 REPORTS AND RECORDS:
2/1/2018 Rev 0 Page 3 of 6
Florida Power & Light Company Attachment 1 St. Lucie Plant 6501 S. Ocean Drive Jensen Beach, FL 34957
1.0 INTRODUCTION
1.1 Purpose
To provide the test plan for maintaining the operational readiness of those safety and quality related dynamic restraints (Snubbers) whose specific functions are required to ensure the integrity of the reactor coolant pressure boundary or any safety-related system as specified below.
1.2 Scope
The program meets the requirements of the following subsections of the American Society of Mechanical Engineers (ASME) OM Code 2004 Edition with 2005 and 2006 Addenda.
Subsection ISTA, General Requirements ISTA contains the requirements directly applicable to inservice examination and testing including the Owners Responsibility and Records Requirements.
Subsection ISTD, Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants ISTD establishes requirements for preservice and inservice examination and testing, and the service life monitoring of Dynamic Restraints (Snubbers) in light-water reactor nuclear power plants.
The snubbers included are those classified as ASME Code Class 1, 2 or 3 and those required to support the systems and components that are required in shutting down a reactor to the safe shutdown condition, in maintaining the safe shutdown condition, or in mitigating the consequences of an accident, or to ensure the integrity of the reactor coolant pressure boundary.
1.3 Discussion
In order to ensure the required operability of all safety related and quality related snubbers for the St. Lucie Plant during seismic or other events that may initiate dynamic loads, the examination, testing and service life monitoring of these snubbers shall be implemented and performed in accordance with the requirements of the station Snubber Testing Program Requirements.
The examination boundaries for the Snubber Program shall include the snubber assembly from pin to pin inclusive. Integral and nonintegral structural attachments for snubbers, when examined, shall be examined in accordance with the requirements of the ASME Code Section XI, Article IWF-2500(a), (b), (c) and (d), in accordance with the ISI program requirements.
The Snubber Program described in OSP-73.01 and ER-AA-119 adheres to the requirements of the ASME OM Code, Subsection ISTD, 2004 Edition with 2005 and 2006 Addenda, as required by 10CFR50.55a(b)(3)(v)(B).
2.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING REQUIREMENTS:
2/1/2018 Rev 0 Page 4 of 6
Florida Power & Light Company Attachment 1 St. Lucie Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 2.1 Visual Examinations, Functional Testing, and Service Life requirements shall be performed to the extent specified within OSP-73.01, and ER-AA-119 and referenced Surveillance Test Procedures.
2.2 Snubbers are grouped into Defined Test Plan Groups (DTPGs) in accordance with ISTD-5252.
Each DTPG will be tested using the 10% sample plan per ISTD-5300. Large equipment snubbers attached to the Steam Generators or Reactor Coolant Pumps will each comprise separate DTPGs.
2.3 The service life of all snubbers shall be monitored and snubbers evaluated, replaced, or reconditioned in accordance with OSP-73.01, ER-AA-119 and ISTD-6200 to ensure that the service life is not exceeded between surveillance inspections. The replacement or reconditioning of snubbers shall be documented and records retained in accordance with St.
Lucie Plant procedures.
3.0 EXAMINATION and TESTING METHODS:
3.1 Visual examinations shall be performed by individuals qualified in accordance with St. Lucie Plant or vendor procedures. These examinations are conducted to ensure the mechanical and structural condition of the snubber support location and to observe conditions that could affect functional adequacy. Visual examinations and functional testing shall be performed to verify the requirements specified within OSP-73.01 and ER-AA-119 are met in accordance with Subsection ISTD.
4.0 EXAMINATION and TESTING FREQUENCY:
4.1 Visual Examinations and Functional Testing shall be performed at the frequency specified within OSP-73.01, ER-AA-119 and ISTD-4250 and ISTD-5240. Snubbers are categorized as inaccessible or accessible during reactor operation for visual examination and may be examined independently according to the schedule determined by Table ISTD 4252-1.
4.2 Code Case OMN-13, which allows the extension of the visual examination interval, has been implemented for snubber inspections scheduled during this interval. Code Case OMN-13 is approved for use in Regulatory Guide 1.192 (June 2003).
4.3 Post installation visual Examinations shall be performed whenever new snubbers are installed, reinstallation of existing or swapped snubbers that were functionally tested, or after repairs, replacements or modifications.
4.4 Functional testing requirements for new installations or spares shall be equal to or more stringent than that specified within OSP-73.01 and ER-AA-119.
2/1/2018 Rev 0 Page 5 of 6
Florida Power & Light Company Attachment 1 St. Lucie Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 5.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING EVAUATION:
5.1 Snubbers that do not appear to conform to the Visual Examination requirements of OSP-73.01 and ER-AA-119, shall be reported for evaluation and appropriate corrective action.
5.2 Snubbers that do not appear to conform to the visual examination acceptance requirements and are later confirmed as operable as a result of functional testing may be declared operable for the purpose of establishing the next visual inspection interval, providing that the unacceptable condition did not affect operational readiness for the snubber location.
5.3 Snubbers that do not meet the functional testing acceptance criteria in OSP-73.01 and ER-AA-119 shall be evaluated to determine the cause of the failure and appropriate corrective action shall be taken.
5.4 The service life of a snubber will be evaluated once each fuel cycle using manufacturers input and contemporary information gained through consideration of the snubber service conditions and inservice functional test results. Service life monitoring program requirements are included in OSP-73.01 and ER-AA-119.
6.0 REPAIR, REPLACEMENT, AND MODIFICATION REQUIREMENTS:
6.1 Repairs, Replacements and Modifications performed on snubbers under this program shall conform, as applicable, to the requirements specified within the ASME Code,Section XI 2007 Edition through 2008 Addenda.
7.0 SCHEDULING
7.1 Schedules for snubber Visual Examinations, Functional Testing, and Service Life Replacements will be established, tracked and maintained in accordance with OSP-73.01, ER-AA-119 and Subsection ISTD by the Snubber Engineer.
7.2 A controlled listing of snubbers included in this program is maintained and is controlled within the NAMS Equipment Data Base.
7.3 The Snubber Engineer shall identify and track expanded or additional testing and/or examinations as required by OSP-73.01, ER-AA-119 and Subsection ISTD.
8.0 REPORTS and RECORDS:
8.1 Reports and records for the Visual Examinations and Functional Testing shall be maintained for all snubbers included within the Snubber Program in accordance with QI-17-PSL-1, Quality Assurance Records.
8.2 Applicable records and reports, as required for Repair and Replacements, shall be maintained.
8.3 Records of the service life of all snubbers listed in this program, including the date at which the service life commences or expires, and associated installation and maintenance records shall also be maintained in accordance with QI-17-PSL-1 and ER-AA-119.
2/1/2018 Rev 0 Page 6 of 6