MONTHYEARL-2022-048, Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report2022-03-21021 March 2022 Submittal of Refueling Outage SL2-26 Steam Generator Tube Inspection Report L-2021-220, Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1)2021-12-27027 December 2021 Submittal of In-Service Inspection Program ISI Fourth Interval - Third Period SL2-26 Owner'S Activity Report (OAR-1) L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report L-2021-112, In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1)2021-08-13013 August 2021 In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1) L-2020-030, In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1)2020-02-18018 February 2020 In-Service Inspection Program ISI Fifth Interval - First Period SL1-29 Owner'S Activity Report (OAR-1) L-2020-025, Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-42020-02-0707 February 2020 Unit 2 ISI 4th Interval Relief Request 17, Proposed Alternative to Use ASME Code Case N-513-4 L-2018-239, In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1)2018-12-28028 December 2018 In-Service Inspection Program ISI Fourth Interval - Second Period - SL2-24 Refueling Outage Owner'S Activity Report (OAR-1) L-2018-135, In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1)2018-07-0909 July 2018 In-Service Inspection Program, ISI Fourth Interval- Third Period; Fifth Interval- First Period; SL1-28 Owner'S Activity Report (OAR-1) L-2018-110, Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 02018-05-0202 May 2018 Submittal of Fifth Ten-Year Inservice Inspection Interval ISI Program Plan, Revision 0 L-2018-069, Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan2018-03-30030 March 2018 Fifth 10-Year Interval - Inservice Testing (1ST) Program Plan L-2018-042, Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval2018-02-0909 February 2018 Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval L-2017-152, Refueling Outage SL2-23, Steam Generator Tube Inspection Report2017-09-13013 September 2017 Refueling Outage SL2-23, Steam Generator Tube Inspection Report L-2017-070, Refueling Outage SL1-27 Steam Generator Tube Inspection Report2017-04-27027 April 2017 Refueling Outage SL1-27 Steam Generator Tube Inspection Report L-2017-019, Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1)2017-02-0606 February 2017 Submittal of In-Service Inspection Program, ISI Fourth Interval- Third Period- SL1-27, Owner'S Activity Report (OAR-1) L-2017-017, Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 02017-02-0202 February 2017 Inservice Inspection Plan, Fourth Ten-Year Unit 1 Relief Request No. 14, Revision 0 L-2016-088, Report of 10 CFR 50.59 Plant Changes - Docket No. 50-3892016-04-19019 April 2016 Report of 10 CFR 50.59 Plant Changes - Docket No. 50-389 L-2016-089, Refueling Outage SL2-22, Steam Generator Tube Inspection Report2016-04-15015 April 2016 Refueling Outage SL2-22, Steam Generator Tube Inspection Report ML16076A4312016-03-0707 March 2016 St. Lucie, Unit 2, In-Service Inspection Plans Fourth Ten-Year Interval Relief Request 11 L-2016-015, In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1)2016-01-21021 January 2016 In-Service Inspection Program, ISI Fourth Interval - First Period - SL2-22 Refueling Outage, Owner'S Activity Report (OAR-1) L-2015-204, In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1)2015-07-22022 July 2015 In-Service Inspection Program, ISI Fourth Interval - Third Period - SL1-26, Owner'S Activity Report (OAR-1) L-2015-126, License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan2015-05-11011 May 2015 License Renewal One-Time Inspection of Class 1 Small Bore Piping Revised Commitments and Revised Inspection Plan L-2015-063, In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply2015-03-0505 March 2015 In-Service Inspection Plans Fourth Ten-Year Interval Unit 2 Relief Request 2 RAI Reply L-2014-360, Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 02014-12-0303 December 2014 Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 0 L-2014-339, Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 142014-11-0303 November 2014 Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-331, TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements2014-10-23023 October 2014 TS Correction for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements L-2014-277, Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 172014-08-28028 August 2014 Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-224, In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l)2014-07-17017 July 2014 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-21 Refueling Outage Owner'S Activity Report (OAR-l) L-2014-206, Third Ten-Year Interval Unit 2 Relief Request No. 142014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 14 L-2014-208, Third Ten-Year Interval Unit 2 Relief Request No. 172014-06-30030 June 2014 Third Ten-Year Interval Unit 2 Relief Request No. 17 L-2014-113, Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report2014-04-29029 April 2014 Refueling Outage SL 1-25, Steam Generator Tube Inspection Special Report L-2014-039, Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I)2014-02-0606 February 2014 Submittal of In-Service Inspection Program ISI Fourth Interval - Second Period - SLI-25 Owner'S Activity Report (OAR-I) L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2013-240, Fourth Ten-Year Interval, Relief Request No. 7, Rev. 02013-08-0505 August 2013 Fourth Ten-Year Interval, Relief Request No. 7, Rev. 0 L-2013-063, In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1)2013-02-20020 February 2013 In-Service Inspection Program ISI Third Interval - Third Period - Second Outage (SL2-20) Owner'S Activity Report (OAR-1) L-2013-066, Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 02013-02-13013 February 2013 Third Ten-Year Interval Unit 2 Relief Request No. 9, Revision 0 L-2013-044, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 02013-02-0404 February 2013 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 0 L-2012-301, In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1)2012-07-20020 July 2012 In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owner'S Activity Report (OAR-1) L-2010-207, Fourth Ten-Year Interval Relief Request PR-92010-09-14014 September 2010 Fourth Ten-Year Interval Relief Request PR-9 L-2010-202, In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1)2010-09-0101 September 2010 In-Service Inspection Program, ISI Fourth Interval - First Period - Second Outage (SL1-23), Owner'S Activity Report, (OAR-1) L-2009-183, Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1)2009-08-14014 August 2009 Submittal of In-Service Inspection Program, ISI Third Interval - Second Period - Second Outage (SL2-18) Owner'S Activity Report (OAR- 1) L-2009-168, Response to Request for Additional Information, Third Interval Relief Request 312009-07-20020 July 2009 Response to Request for Additional Information, Third Interval Relief Request 31 L-2009-091, Steam Generator Tube Inspection Report2009-04-13013 April 2009 Steam Generator Tube Inspection Report L-2009-036, In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal2009-02-0909 February 2009 In-Service Inspection Program Fourth Interval - First Period Owner'S Activity Report (OAR-1) Submittal L-2008-253, Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 112008-12-0303 December 2008 Inservice Inspection Plans, Unit 1 Fourth Inspection Interval RR 4, and Unit 2 Third Inspection Interval RR 11 L-2008-158, Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages2008-07-21021 July 2008 Submittal of In-Service Inspection Program Third Interval - Third Period Owner'S Activity Report for SL1-20 and SL1-21 Outages L-2008-098, In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 22008-04-29029 April 2008 In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 2 L-2008-067, In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1)2008-03-26026 March 2008 In-Service Inspection Program, Third Interval - Second Period - First Outage (SL2-17) Owner'S Activity Report (OAR-1) L-2008-043, Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 02008-03-13013 March 2008 Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 0 L-2008-014, Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 302008-02-0404 February 2008 Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 30 L-2007-172, In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 102007-10-24024 October 2007 In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 10 2022-03-21
[Table view] Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
June 30, 2014 0
FPL. L-2014-206 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Inservice Inspection Plan Third Ten-Year Interval Unit 2 Relief Request No. 14 In accordance with 10 CFR50.55a(g)(5)(iii), inservice inspection impracticality, Florida Power
& Light (FPL) requests relief from the examination requirements of the ASME Code,Section XI, 1998 Edition with Addenda through 2000, for the subject CEDM welds. The basis for the relief request is provided in the Attachment.
Please contact Ken Frehafer at (772) 467-7748 if there are any questions about this submittal.
Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant Attachment ESK/KWF 4ccr' Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2014-206 Attachment 1 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 Relief Request In Accordance with 10 CFR50.55a(g)(5)(iii)
-- Inservice Inspection Impracticality--
- 1. ASME Code Component(s) Affected Class 1, Category B-0, Item #B14.10, Pressure Retaining Welds in Control Rod Housings.
2. Applicable Code Edition and Addenda
The Code of record for St. Lucie Unit 2 (PSL-2) is the 1998 Edition with 2000 Addenda of the ASME Boiler and Pressure Vessel Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components" as modified by 10CFR50.55a.
3. Applicable Code Requirement
Exam Item No. Examination Requirements Cat.
volumetric or surface examination of 10% peripheral CRD housing welds IWB-2412(b)(2)- When items or welds are added during the second period of an interval, at least 25% of the examinations required by the applicable Examination Category and Item Number for the added items or welds shall be performed during the third period of the interval.
- 4. Impracticality of Compliance
- Removal and disassembly of the CEDM Coil Stack Assembly and Seismic Shroud Assembly Seismic Shroud Assembly to facilitate examination is not possible without significant work, significant radiation exposure, and/or potential damage to the plant.
" Due to the configuration of the control rod drives, it is not practical to meet the examination requirements of the ASME Code, Section Xl, 1998 with addenda through 2000. Relief is requested in accordance with 10 CFR 50.55a(g)(5)(iii).
" When a component has conditions which make it impractical to perform the examination required by the code of record, Florida Power and Light is required to submit the information to the enforcement and regulatory authorities having jurisdiction at the plant site. This Relief Request has been written to address welds that are inaccessible for examination and disassembly to facilitate examination is impractical.
" The PSL-2 replacement reactor vessel head contains ninety-one (91) control element drive mechanisms (CEDM). Each of the thirty-two (32) periphery
L-2014-206 Attachment 2 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 replacement CEDM pressure housing assemblies contain 5 full penetration butt welds that require a surface or volumetric examination. It is not possible to perform the surface or volumetric examinations of 4 of these welds in CEDM housings without significant reactor vessel head disassembly. The 2 upper welds (CEDM 1 &
- 2) and 2 motor housing welds (CEDM 3 & 4) are covered by the shroud assembly which provides seismic support and houses the sensitive rod position indicator coils.
The shroud assembly also serves as the support for the CEDM coil stack assembly.
Only the lower weld (CEDM 5) is accessible for examination.
- Direct Access to the CEDM 1 - 4 welds is not obtainable without extensive disassembly of the CEDM Coil Stack Assembly (drive motor coils) and Seismic Shroud Assembly.
Component Description and Function The internal mechanisms of the CEDM are magnetic jack drives (latch mechanisms) used to vertically position the control element assemblies (CEA) in the core. Each CEDM is capable of withdrawing, inserting, holding, and tripping the CEA from any point within its travel in response to operating signals. Each CEDM is connected to its associated CEA by an extension shaft. Each CEDM housing is surrounded by a seismic shroud on the outside, designed to limit horizontal movement. The seismic shroud completely covers CEDM welds 1 & 2.
Each CEDM has a coil stack assembly, which consists of electromagnetic coils mounted on the outside of the CEDM motor housing assembly. The coils supply magnetic force to actuate the mechanical latches utilized in engaging and driving the notched drive shaft. The electromagnetic coils of the coil stack assembly completely cover CEDM welds 3 & 4.
A reed switch position transmitter (RSPT) assembly is positioned so as to utilize the permanent magnet in the top of each extension shaft. The permanent magnet actuates the reed switches one at a time as it passes by them. This signal, which gives the position of the CEA, is transmitted by the RSPT via cabling. The RSPT is contained in the seismic shroud.
Below are illustrations and descriptions of the key components to show the level of effort required to gain access to CEDM 1-4 welds.
L-2014-206 Attachment 3 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 CEDM-1 ENTEStM
-FLEXIBE EiLECTROAL UPIF 4-;StrVZ CEDM-2 LO~D 6"K4~o -
M~~fASSEMLY CEDM-3 SA-276 F403 f VW14CTP?-UGM GAf-Rp" ft CEDM-4 SB-166 A690 WIF¶OR *"Ev" PftSRE H--Jft O--*.MNGA LF
L-2014-206 Attachment 4 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 Upper Pressure Housing Assembly -
The upper pressure housing assembly forms the upper portion of the pressure boundary and is designed and built to the ASME Boiler and Pressure Vessel Code Section III requirements for Class 1 Appurtenance for 2500 psia and 6501F. The height of the upper pressure housing is designed to allow for the complete withdrawal of the extension shaft assembly without striking the top closure plug. This is accomplished by providing clearance between the top of the pressure housing and the top of the extension shaft assembly when the latch (latch (gripper))s are engaged with the lowest lobe on the drive shaft. The upper end of the housing is designed to allow venting (if required) of the mechanism after filling the system and prior to a hydrostatic test or system operation. The seal utilizes a 440 stainless steel ball seating on a 316 stainless steel seat. A housing nut is installed to act as a closure plug.
The housing nut has an Omega seal that can be welded in the event of seat leakage through the mechanical seal or the EPR O-Ring.
I
L-2014-206 Attachment 5 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 Seismic Shroud Assembly - A stainless steel shroud extends from the top of the coil stack assembly to the top of the upper pressure housing. The shroud acts as a lift rig for the removal and installation of the coil stack from the upper end of the mechanism. Two shoulder eyebolts are installed in the top plate of this assembly to facilitate removal. The shroud is bolted to the coil stack.
L-2014-206 Attachment 6 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 Cooling Shroud Assembly - The coil stack is surrounded by a sheet metal cooling shroud producing an annulus through which air can flow through. Air flowing from top to bottom of the coil stack will remove operating coil heat and some internal CEDM heat to maintain the coils at a temperature of less than 350°. The cooling shroud, an integral part of the CEDM, seals its lower end against the plenum flow plate by a spring-loaded rubber collar.
L-2014-206 Attachment 7 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 The CEDM Motor Housing Assembly - The motor housing assembly is designed and built to the ASME Boiler and Pressure Vessel Code Section III requirements for Class 1 Appurtenances operating at 2500 psia and 6501F. The motor housing along with the upper pressure housing are NPT stamped as an assembly. The motor housing assembly contains the motor assembly and forms the lower portion of the CEDM pressure boundary. The motor housing assembly is fabricated from Type 403 stainless steel with upper end fittings of 348 stainless steel and lower end fittings of Alloy 690. The 403 stainless steel section is required for both its magnetic and strength properties. A lower ledge supports and positions the coil stack assembly and the shroud assembly. The end fittings use Acme threads for strength and Omega seals to provide the water pressure boundary.
L-2014-206 Attachment 8 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0
- 5. Burden Caused by Compliance
- Unlike piping weld inspections that only require insulation removal, inspection of CEDM welds 1 through 4 requires significant disassembly of permanent plant equipment
- Direct Access to the CEDM 1 - 4 welds is not obtainable without extensive disassembly of the CEDM Coil Stack Assembly and Seismic Shroud Assembly that covers the CEDM pressure and motor housings. These activities would be considered a High Risk since they involve disassembly of sensitive electrical components that position control rods that function to control reactivity and also have a safe shutdown function. There is also the risk of damage to components during disassembly and restoration as well as alignment and post maintenance testing that could severely impact the plant with an extended off-line condition to properly obtain long lead replacement parts, if required.
- Access inside the Reactor Vessel Head (RVH) service structure that surrounds all 91 CEDMs and acts as part of the seismic supported RVH duct work, is required to perform inspections on CEDM welds 2, 3 & 4. To gain access to these welds would require service structure modifications, a significant level of service structure disassembly or removal entirely. Any modification would be a significant level of effort as the service structure is an engineered structure.
" Removal and reinstallation of the CEDM coil stacks and sensitive control rod position indicators would also require post maintenance testing (PMT) that could not be performed until reactor vessel reassembly. Although testing of the CEDM assembly is a normal part of start up testing, the possibility of a PMT failure is increased as a result of handling these sensitive components.
- 6. Proposed Alternative and Basis for Use Proposed Alternative The subject welds will continue to receive VT-2 examination with the Reactor Coolant Pressure Boundary (RCPB) system leakage test conducted prior to startup from each refueling outage.
Because the replacement head was installed during the 2nd period of the 3rd ISI interval, FPL performed examinations of the lower weld (CEDM 5) on 2 accessible periphery CRD housings during the 3rd period to satisfy the IWB-2412(b)(2) requirement.
The lower weld (CEDM 5) of 2 CEDM periphery penetrations were examined in accordance with the code requirements of the 1998 Edition with Addenda through 2000.
For the remaining welds in each CEDM assembly, the configuration completely precluded accessibility for examination.
L-2014-206 Attachment 9 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 Basis for Use 10 CFR 50.55a(g)(4) recognizes that throughout the service life of a nuclear power facility, components which are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements set forth in the ASME Code to the extent practical within the limitations of design, geometry and materials of construction of the components.
FPL replaced the complete Reactor Vessel Head (RVH) assembly including CEDMs during the SL2-17 (2007) refueling outage. The purpose of the replacement of the component was to replace those materials that have been proven to have high susceptibility to primary water stress corrosion cracking (PWSCC). Replacement of the RV head and CEDMs provided all new material and components that form the RCS pressure boundary.
The replacement motor housing assembly welds (CEDM 3 & 4) use a modern narrow groove weld joint geometry so that less weld material is present. The replacement weld joint designs are in compliance with the design, fabrication, inspection, and testing requirements of the ASME B&PV Code,Section III, 1998 Edition through the 2000 Addenda for Class 1 appurtenances.
The replacement occurred during the 2nd period of the 3rd ISI interval for PSL-2. The PSL-2 replacement reactor vessel head contains ninety-one (91) control element drive (CEDM) mechanisms. The periphery consists of thirty-two (32) CEDMs. Prior to assembly, preservice surface examinations of all 5 welds on the thirty-two (32) periphery CEDMs was performed. In addition a volumetric preservice examination was performed of the CEDM welds prior to the assembly utilizing equipment, procedures, and personnel qualified in accordance with ASME Section X1, Appendix VIII. No indications were identified.
Combustion Engineering designed latch driven CEDMs with butt welds have had excellent service performance history. A review of operational experience in the INPO database did not identify failures of CEDM butt welds of the design described above.
Although some failures were noted in the thin ligament specially designed seal welds (NB-4360) that are used on the threaded joints, they do not receive the same level of NDE that the affected CEDM butt welds receive. In addition the seal welds have a unique configuration of trapped or occluded water chemistry that is not applicable to the conditions that the CEDM butt weld RCS environment.
Because the replacement head was installed during the 2nd period of the 3rd ISI interval, FPL performed surface examinations of the lower weld (CEDM 5) on 2 accessible periphery CRD housings during the 3rd period to satisfy the IWB-2412(b)(2) requirement.
FPL performed examinations of the accessible welds. Personnel and system engineers perform walk downs of the reactor head after shutdown and during startup looking for leakage or other abnormal conditions.
L-2014-206 Attachment 10 of 10 St. Lucie Unit 2 THIRD INSPECTION INTERVAL RELIEF REQUEST NUMBER 14, REVISION 0 Therefore, examination of the accessible welds (CEDM 5) on the periphery CEDMs combined with the periodic system leakage tests provides an acceptable level of qualify and safety for identifying degradation.
- 7. Duration of Proposed Alternative This relief request is applicable to the St. Lucie unit 2 Third Inservice Inspection Interval which began August 8, 2003 and ended August 7, 2013.