Forwards Installation Procedure ML-86-024 Re Limitorque Valve Actuator Qualification Insp/Upgrades & Summary of Limitorque Control Wire Insp Performed in Response to IE Info Notice 86-003
ML20206F151
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/02/1986
From: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Anderson C, Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20206F156 List:
References
IEIN-86-003, IEIN-86-3, JAFP-86-0474, JAFP-86-474, NUDOCS 8606240274
Download: ML20206F151 (2)


Text

I

~

James A. FitaPatrick Cuclear Power Plant

  • Po. Bon 41 o Lycoming. New York 13093 315 342.3840 Radford J. Converse
  1. > NewYorkPbwer 4# Authority June 2, 1986 JAFP 86-0474 Dr. Thomas Murley, Regional Administrator U.S. Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Mr. Cliff Anderson, Chief Plant Systems Section Division of Reactor Safety

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 NRC IE Notice 86-03, Limitorque Operator Internal Wiring; Response to Phone Survey of Licensee Action

Enclosures:

(1) JAFNPP Installation Procedure M1-86-024 (IPfl) - Limitorque Valve Actuator Qualifica-tion Inspection / Upgrades (uncontrolled copy)

(2) Summary of Limitorque Control Wire Inspec-tions Performed in Response to IE Notice 86-03 (3) Schedule for Inspection of Limitorque Opera-tors Outside Containment

Dear Sir:

Enclosures (1) through (3) are provided in response to your phone survey conducted on April 24, 1986. The survey addressed the Authority's actions regarding NRC IE Information Notice 86-03 for the James A. Fitzpatrick Plant. This Notice had discussed potential deficiencies in environmental qualification of Limitorque motor valve operator wiring.

Enclosure 1 describes the procedure used in conducting an inspec-tion of the Limitorque actuators located inside containment.

Enclosure 2 provides a summary of the results of the inspection.

Of the seventeen valve actuators which were inspected, wires were replaced in twelve. As discussed in Enclosure 2, the replaced wires were not necessarily deficient, but were replaced to eliminate all possibility of doubt as to their qualification.

8606240274 860602 PDR ADOCK 05000333 ff 1 G PDR ~<

l \

I U.S.-Nuclear Regulatory Commission June 2, 1986 Attention: Mr. Cliff Anderson . -

JAFP 86-0474

SUBJECT:

JAFNPP DOCKET NO. 50-333 Page NRC.IE NO.TICE 86-03, LIMITORQUE OPERATOR INTERNAL WIRING: RESPONSE TO PHONE SURVEY OF LICENSEE ACTIONS Enclosure 3 provides the Authority's schedule for inspecting the actuators outside containment. It also presents a justification for the schedule.

Should you or your staff have any further questions regarding this matter, please contact Mr. V. Walz (ext. 261) of my staff.

. cx40 css - l RADFORD J. CONVERSE RESIDENT MANAGER RJC:VMW: lad CC: A. Luptak Office'of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 J. Linville U.S. Nuclear Regulatory Commission (Region I)