Forwards Application for Amend to License DPR-59,revising Tech Spec Table 3.2-2, Instrumentation That Initiates or Controls Core & Containment Cooling Sys to Change Second Level Undervoltage Trip Setpoint for 1990 Refueling Outage
ML20005G719
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/12/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20005G720 List:
References
JPN-90-003, JPN-90-3, NUDOCS 9001220248
Download: ML20005G719 (2)


Text

-t its an NewWrk10301

[

914 CS1Q40

-i 7 John C. Btons l Exoeutin Vice President  ;

Nucicar Generation j 1

January 12, 1990 l JIW-90-003 l

U.S. Nuclear Regulatory Commission ,

ATTN: Document Control Desk i Mall Station P1137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant l Docket No.50 333 l Proposed Changes to the Technical l Specifications Regarding Second Level  ;

Undervoltage Relay Setpoint (JPTS-89-034)

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical Specifications revises the 4 kV Emergency Bus Undervoltage Relay (Degraded Voltage) l setpoint . The Authority is changing the reserve station transformer tap setting: during l the 1990 refueling outage, and, as a result, these setpoints must also be changed. The changes also remove an operating restriction imposed by the NRC as part of Amendment 120. The NRC imposed a one cycle limitation pending the resolution of certain technical issues associated with the undervoltage protection system. These  !

lasues have been resolved.

The changes revise Table 3.2 2, " Instrumentation that Initiates or Controls the Core '

and Containment Cooling System,' on pages 70c and 71. Table 4.2 2,

  • Minimum Test
  • and Calibration Frequency for Core and Containment Cooling System,' on page 79 and the associated Bases on page 60.

The 1990 refueling outage is currently scheduled to start in March. NRC staff approval of this enange by May 15,1990 is requested to assure that the plant will return to power on schedule.

Enclosed for filing is the signed original of a document entitled " Application for Amendment to Operating Ucense,' with Attachments I and 11 thereto, comprising a statement of the proposed change to the Technical Specifications and the associated ,

Safety Evaluation.

l 0

01 k\

em age P

Y v m , - , , , ~ , , . .-- ,y u , , , , - s e e,,--~,, .~w,-,.,--- -,,n m-, , - - v-- v w~n-- w-- -'*

'. x In accordance with 10 CFR 50.91, a copy of this application and the associated  ;

attachments are being provided to the designated New York State official. l Should you or your staff have any questions regarding the proposed changes, please . l contact Ms. S. M. Toth of my staff.  !

e V truly yours, j 0 uG L ohn C. Brons i

Executive Vice President Nuclear Generation t cc: U.S. Nuclear Regulatory Commission  !

475 Allendale Road .

King of Prussia, PA 19406 Office of the Res: dent inspector i U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. David E. LaBarge Project Directorate 11  !

Division of Reactor Projects l/ll U.S. Nuclear Regulatory Commission Mall Stop 14 B2  !

Washington, DC 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza .

i 16th Floor Albany, NY 12223

_. ,