Forwards Application for Amend to License DPR-59,removing cycle-specific Parameter Limits from Tech Specs & Relocating Limits to Core Operating Limits Rept,Per Generic Ltr 88-16
ML20006A402
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/12/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20006A403 List:
References
GL-88-16, JPN-90-006, JPN-90-6, JPTS-88-020, JPTS-88-20, NUDOCS 9001260223
Download: ML20006A402 (2)


Text

ja -

y ; i70 ._ 123 Main Street White Plains, NewYxk10301 N,' i 914 681.6240:

y V-( $ bMbr- John c. amn.

& Authority fl%%C*"'

January 12,1990 JPN-90-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mall Station P1 137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Regarding Removal of Cycle-Specific Parameter Limits (JPTS-88-020)

Dear Sir:

. Several Technical Specifications address limits associated with reactor physics parameters that generally change with each reload core, requiring changes to the-Specifications each fuel cycle. Since these limits are developed using NRC approved  ;

methodologies, processing the changes is an unnecessary burden on the NRC and n' the Authority. NRC Generic Letter 88-16 provides guidance for removing these cycle- ,

1 specific parameter limits and relocatir,g them into a utility controlled " Core Operating

Umits Report.'

'This application for 'an amendment to _ the James A. FitzPatrick Technical  ;

I- Specifications proposes to remove the cycle-specific parameter limits from the L Technical Specifications and to reference a Core Operating Umits Report (COLR) containing these limits. These changes are made in accordance with the guidance contained in NRC &neric Letter 88-16.

The' Authority does not plan to submit cycle-specific changes _to the Technical Specifications to support Cycle 10 operation. The core will be operated for the remainder of the current operating cycle with the Cycle 9 specific limits contained in the Technical Specifications and will commence Cycle 10 with the Cycle 10 specific ilmits in a PORC and SRC reviewed COLR. At no time will the core be operated without the cycle-specific limits in either the Technical Specifications or the COLR.

Therefore, these changes to the Technical Specifications are required for startup following the 1990 refueling outage. Since this outage is currently scheduled to begin March 30,1990, the Authority requests that this application be approved by May 15, l 1990.

Enclosed for filing is the signed original of a document entitled " Application for Amendment to Operating Ucense," with Attachments I and 11 thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation. The Authority will submit the Cycle 10 Core Operating Umits Report upon issuance, but no later than the startup of Cycle 10.

9001260223 900112 ADOCK 0500o333 7

Ak j PDR P PDC f g f p j/ I p ggg @dek I L

m

p; * - >

e.;

'~

, In accordance with 10 CFR' 50.91, a copy of this application and the associated'-  ;

d attachments are being provided to the designated New York State official. i Should you or your staff have any questions regarding the proposed changes, please contact Ms. S. M. Toth of my staff. -l Very truly yours, s

46h[n C. Bronsb-Executive Vice President -

Nuclear Generation a

ec: Regional Administrator r U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

~ Office of the Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 136 i

Lycoming, NY 13093 Mr. David E. LaBarge

- Project Directorate 11 Division of Reactor Projects l/II U.S. Nuclear Regulatory Commission Mall Stop 14 B2 ,,

Washington, D.C,20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16thFloor '

Albany, NY 12223 1 .

l p-I

  • W- Tu - m-- e e M