Falsification of Welder Qualifications for Contractor Employees| ML031190115 |
| Person / Time |
|---|
| Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane |
|---|
| Issue date: |
11/20/1989 |
|---|
| From: |
Rossi C Office of Nuclear Reactor Regulation |
|---|
| To: |
|
|---|
| References |
|---|
| IN-89-075, NUDOCS 8911140073 |
| Download: ML031190115 (6) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane |
|---|
Category:NRC Information Notice
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000000]] OR [[:Zimmer]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] OR [[:Crane]] </code>. |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON. D.C. 20555
November 20, 1989 NRC INFORMATION NOTICE NO. 89-75:
FALSIFICATION OF WELDER QUALIFICATIONS FOR
CONTRACTOR EMPLOYEES
Addressees
All holders of operating licenses or construction permits for nuclear power
reactors.
Purpose
This information notice is intended to alert addressees to potential problems
related to the need to assure that welding personnel hired to perform activi- ties affecting safety are properly qualified in accordance with ASME Code
requirements. It is expected that recipients will review the information
for applicability to their facilities and activities, and consider actions, as appropriate, to avoid similar problems. However, suggestions contained
in this information notice do not constitute NRC requirements; therefore, no specific action or written response is required.
Description of Circumstances
In 1984, Virginia Electric and Power Company (VEPCO) hired Southwestern Engi- neering Company (SECO) to modify and install moisture separator reheater (MSR)
internals at the licensee's North Anna and Surry Nuclear Power Stations in
late 1984 and early 1985. SECO, in turn, formed a joint venture with Power- plant Specialists, Inc. (PSI) for craft labor (boilermakers, welders, etc.)
to perform the work. Welder qualification for the MSR projects was to be
completed in accordance with the specifications set forth in Section IX of
the ASME Boiler and Pressure Vessel Code.
Investigation activities by NRC,
prompted by an allegation, revealed that 16 of the 45 boilermaker/welder
personnel utilized for the VEPCO projects were properly tested and certified
by an authorized, independent testing facility. Although Welder Qualification
Test (WQT) records were completed by PSI for the remaining 29 welder personnel, indicating that the test welds were prepared, welded, and tested in accordance
with the requirements of Section IX of the ASME Code, the investigation revealed
that company officials intentionally falsified the welders' records by certi- fying them without requiring the proficiency tests.
Discussion:
It is important to note that it is the responsibility of each licensee to
assure that welders assigned to nuclear power plant tasks, whether or not
140073Z4
V
IN 89-75 November 20, 1989 the tasks are categorized as safety-related, are qualified to the appropriate
standard. In the specific circumstances cited above, the welder qualification
records were falsified by PSI to the licensee through SECO, and recipients of
this notice should be aware of the potential for this situation at their
facilities.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate NRR project
manager.
tor
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contact:
Gregory C. Cwalina, NRR
(301) 492-3221
Walter P. Haass, NRR
(301) 492-3219 Attachment:
List of Recently Issued NRC Information Notices
a
s.I
Attachment
IN 89-75
November 20, 1989
Page I of I
LIST OF RECENTLY ISSUED
NRC INFORMATION NOTICES
Information
Date of
Notice No.
Subject
Issuance
Issued to
89-74
89-73
89-72
89-71
89-70
89-69
89-68
89-67
89-66 Clarification of Trans- portation Requirements
Applicable to Return of
Spent Radiopharmacy Dosages
from Users to Suppliers
Potential Overpressurization
of Low Pressure Systems
Failure of Licensed Senior
Operators to Classify
Emergency Events Properly
Diversion of the Residual
Heat Removal Pump Seal
Cooling Water Flow During
Recirculation Operation
Following a Loss-of-
Coolant Accident
Possible Indications of
Misrepresented Vendor
Products
Loss of Thermal Margin
Caused by Channel Box
Bow
Evaluation of Instrument
Setpoints During
Modifications
Loss of Residual Heat
Removal Caused by
Accumulator Nitrogen
Injection
Qualification Life of
Solenoid Valves
11/7/89 .
11/1/89
10/24/89
10/19/89
10/11/89
9/29/89
9/25/89
9/13/89
9/11/89
All manufacturers
and distributors of
radiopharmaceuticals
for medical use, '
nuclear pharmacies, and medical licensees.
All holders of OLs
or CPs for nuclear
power reactors.
All holders of OLs
or CPs for nuclear
power reactors.
All holders of OLs
or CPs for nuclear
power reactors.
All holders of OLs
or CPs for nuclear
power reactors.
All holders of OLs
or CPs for BWRS.
All holders of OLs
or CPs for nuclear
power reactors.
All holders of OLs
or CPs for PWRs.
All holders of OLs
or CPs for nuclear
power reactors.
OL - Operating License
CP = Construction Permit
-
j;
.
.1
. I
IN 89-75 November 20, 1989 the tasks are categorized as safety-related, are qualified to the appropriate
standard. In the specific circumstances cited above, the welder qualification
records were falsified by PSI to the licensee through SECO, and recipients of
this notice should be aware of the potential for this situation at their
facilities.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate NRR project
manager.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contact:
Gregory C. Cwalina, NRR
(301) 492-3221
Walter P. Haass, NRR
(301) 492-3219 Attachment:
List of Recently Issued NRC Information Notices
VIP:DRIS*
WPHaass
10/03/89 VIB:DRIS*
GCCwalina
10/04/89 VIB:DRIS*
ETBaker
10/25/89 C:VIB:DRIS*
EWBrach
10/25/89 D:DRIS:NRR*
BKGrimes
10/25/89
- with noted changes DOEA:OGCB**
CBerlinger
10/26/89 OI*
BHayes
11/6/89
IN 89-XX
October XX
Page 2 of)
Discussion:
It is Important that licensees be aware of the potential for unq alifled
welders to be assigned to nuclear power plant tasks, whether or/not the tasks
are categorized as safety-related. In the specific circumstanoes cited above, the welder qualification records were falsified by PSI to the icensee through
SECo, and recipients of this notice should be aware of the p ential for this
situation at their facilities.
No specific action or written response is required by this information notice.
If you have any questions regarding this matter, p lease g t in touch with the
technical contact identified below or the Regional Admin strator of the appro- priate regional office.
Charles E. Rossi, Direc or
Division of Operational Events Assessment
Office of Nuclear Reac or Regulation
Technical Contact:
Gregory C. Cwalina
(301) 492-3221
Walter P. Haass
(301) 492-3219 Attachment:
1. List of Recently Issued NRC Information Notli
Document Name:
IN NOTICE -HAASS
VIP:DRIS*
WPHaass
10/03/89 VIB:DRIS*
GCCwalina
10/04/89 VIB:DRIS
ETBaker
1 00l/89 W01
,WegjtsCA-e_
id/u/9 C:
DOEA
CERossi
10/ /89 Uk °fX 7tj
(P7. MY=
IN 89-XX
October XX, 198 Discu ion:
Since th MSR internals are not categorized as safety-related com nents, adherence
the provisions of Appendix B and 50.55a of 10 CFR P t 50, is
not require!
Rather, the provisions of Appendix A (GDC 1) and 0.54(h) of
10 CFR Part 5 are more appropriate since the components are
tegorized as
important to sa ety.
In any event, it is important that licesees be aware of
the potential fo unqualified welders to be assigned to nuc ar power plant
tasks, whether the
be categorized as safety related or no
In the specific
circumstances cited bove, the welder qualification recor s were falsified by
PSI to the licensee trough SECo, and recipients of this notice should be
particularly aware of
e potential for this situation t their facilities when
contracting with these t es of organizations. Prope auditing of a contactors
activities should provide
e necessary assurance of conformance to contractual
and regulatory requirements.
No specific action or written r sponse is requi
by this information notice.
If you have any questions regard g this matter please get in touch with the
technical contact identified below r the Regi
al Administrator of the appro- priate regional office.
Charles E.1R
i, Director
Division of Ope tional Events Assessment
Office of Nuclear eactor Regulation
Technical Contact:
Edward T. Baker"/
(301) 492-095 7 Attachment:
1. List of Recently Issued N
Information Notices
DISTRIBUTION:
GCwalina
EWBrach
CBerlinger
Tech Editor
JZwolinski
CERossi
Document Name:
N NOTICE HAASS
t
S
VIB:DRIS
C:VIB:DRIS
D:DRIS:NRR
DOEA
na
ETBaker
EWBrach
BKGrimes
CERossi
5/89
1 / /89
10/
/89
10/
/89
10/
/89
10/
/89
|
|---|
|
| list | - Information Notice 1989-01, Valve Body Erosion (4 January 1989)
- Information Notice 1989-02, Criminal Prosecution of Licensees Former President for Intentional Safety Violations (9 January 1989)
- Information Notice 1989-03, Potential Electrical Equipment Problems (11 January 1989, Topic: Overexposure)
- Information Notice 1989-04, Potential Problems from the Use of Space Heaters (17 January 1989)
- Information Notice 1989-05, Use of Deadly Force by Guards Protecting Nuclear Power Reactors Against Radiological Sabotage (19 January 1989)
- Information Notice 1989-06, Bent Anchor Bolts in Boiling Water Reactor Torus Supports (24 January 1989)
- Information Notice 1989-07, Failures of Small-Diameter Tubing in Control Air, Fuel Oil & Lube Oil Systems Render Emergency Diesel Generators Inoperable (25 January 1989, Topic: Overspeed)
- Information Notice 1989-08, Pump Damage Caused by Low-Flow Operation (26 January 1989, Topic: Integrated leak rate test)
- Information Notice 1989-09, Credit for Control Rods Without Scram Capability in the Calculation of Shutdown Margin (26 January 1989, Topic: Shutdown Margin)
- Information Notice 1989-10, Undetected Installation Errors in Main Steam Line Pipe Tunnel Differential Temperature-Sensing Elements at Boiling Water Reactors (27 January 1989)
- Information Notice 1989-11, Failure of DC Motor-Operated Valves to Develop Rated Torque Because of Improper Cable Sizing (2 February 1989)
- Information Notice 1989-12, Dose Calibrator Quality Control (9 February 1989)
- Information Notice 1989-13, Alternative Waste Management Procedures in Case of Denial of Access to Low-Level Waste Disposal Sites (8 February 1989, Topic: Authorized possession limits)
- Information Notice 1989-15, Second Reactor Coolant Pump Shaft Failure at Crystal River (16 February 1989)
- Information Notice 1989-16, Excessive Voltage Drop in DC Systems (16 February 1989, Topic: Battery sizing)
- Information Notice 1989-17, Contamination and Degradation of Safety-Related Battery Cells (22 February 1989)
- Information Notice 1989-18, Criminal Prosecution of Wrongdoing Committed by Suppliers of Nuclear Products or Services (24 August 1990, Topic: Stress corrosion cracking)
- Information Notice 1989-20, Weld Failures in a Pump of Byron-Jackson Design (24 February 1989)
- Information Notice 1989-21, Changes in Performance Characteristics of Molded-Case Circuit Breakers (27 February 1989)
- Information Notice 1989-23, Environmental Qualification of Litton-Veam Cir Series Electrical Connectors (3 March 1989)
- Information Notice 1989-24, Nuclear Criticality Safety (6 March 1989)
- Information Notice 1989-25, Unauthorized Transfer of Ownership or Control of Licensed Activities (7 March 1989)
- Information Notice 1989-26, Instrument Air Supply to Safety-Related Equipment (7 March 1989)
- Information Notice 1989-27, Limitations on the Use of Waste Forms and High Integrity Containers for the Disposal of Low-Level Radioactive Waste (8 March 1989, Topic: Process Control Program)
- Information Notice 1989-28, Weight and Center of Gravity Discrepancies for Copes-Vulcan Air-Operated Valves (14 March 1989)
- Information Notice 1989-29, Potential Failure of Asea Brown Boveri Circuit Breakers During Seismic Event (15 March 1989, Topic: Commercial Grade)
- Information Notice 1989-30, High Temperature Environments at Nuclear Power Plants (1 November 1990)
- Information Notice 1989-31, Swelling and Cracking of Hafnium Control Rods (22 March 1989)
- Information Notice 1989-32, Surveillance Testing of Low-Temperature Overpressure-Protection Systems (23 March 1989, Topic: Stroke time)
- Information Notice 1989-33, Potential Failure of Westinghouse Steam Generator Tube Mechanical Plugs (23 March 1989)
- Information Notice 1989-34, Disposal of Americium Well-Logging Sources (30 March 1989)
- Information Notice 1989-35, Loss & Theft of Unsecured Licensed Material, Attachment 1 to NRC Information Notice 1990-014: Accidental Disposal of Radioactive Materials. (Also includes Attachments 2 & 3) (30 March 1989)
- Information Notice 1989-35, Loss & Theft of Unsecured Licensed Material, Attachment 1 to NRC Information Notice 1990-014: Accidental Disposal of Radioactive Materials. (Also Includes Attachments 2 & 3) (30 March 1989, Topic: Moisture-Density Gauge, Uranium Hexafluoride)
- Information Notice 1989-36, Excessive Temperatures in Emergency Core Cooling System Piping Located Outside Containment (4 April 1989)
- Information Notice 1989-37, Proposed Amendments to 40 CFR Part 61, Air Emission Standards for Radionuclides (4 April 1989)
- Information Notice 1989-38, Atmospheric Dump Valve Failures at Palo Verde Units 1, 2, and 3 (5 April 1989, Topic: Emergency Lighting)
- Information Notice 1989-39, List of Parties Excluded from Federal Procurement or Non-Procurement Programs (5 April 1989)
- Information Notice 1989-40, Unsatisfactory Operator Test Results and Their Effect on the Requalification Program (14 April 1989)
- Information Notice 1989-41, Operator Response to Pressurization of Low-Pressure Interfacing Systems (20 April 1989)
- Information Notice 1989-42, Failure of Rosemount Models 1153 and 1154 Transmitters (21 April 1989)
- Information Notice 1989-43, Permanent Deformation of Torque Switch Helical Springs in Limitorque SMA-Type Motor Operators (1 May 1989)
- Information Notice 1989-44, Hydrogen Storage on the Roof of the Control Room (27 April 1989, Topic: Coatings)
- Information Notice 1989-45, Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts (8 May 1989, Topic: Commercial Grade Dedication, Coatings, Commercial Grade)
- Information Notice 1989-46, Confidentiality of Exercise Scenarios (11 May 1989, Topic: Coatings)
- Information Notice 1989-47, Potential Problems with Worn or Distorted Hose Clamps on Self-Contained Breathing Apparatus (18 May 1989, Topic: Coatings, Fatality)
- Information Notice 1989-48, Design Deficiency in the Turbine-Driven Auxiliary Feedwater Pump Cooling Water Systems (22 May 1989, Topic: Coatings, Temporary Modification)
- Information Notice 1989-49, Failure to Close Service Water Cross-Connect Isolation Valves (22 May 1989, Topic: Coatings, Loss of Offsite Power)
- Information Notice 1989-50, Inadequate Emergency Diesel Generator Fuel Supply (30 May 1989)
- Information Notice 1989-51, Potential Loss of Required Shutdown Margin During Refueling Operations (31 May 1989, Topic: Shutdown Margin, Coatings)
- Information Notice 1989-52, Potential Fire Damper Operational Problems (8 June 1989, Topic: Safe Shutdown, Shutdown Margin, Fire Barrier, Fire Protection Program)
... further results |
|---|