Information Notice 1988-26, Falsified Pre-Employment Screening Records

From kanterella
Jump to navigation Jump to search
Falsified Pre-Employment Screening Records
ML031150176
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane
Issue date: 05/16/1988
From: Rossi C
Office of Nuclear Reactor Regulation
To:
References
IN-88-026, NUDOCS 8805100369
Download: ML031150176 (9)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, DC 20555

May 16, 1988 NRC INFORMATION NOTICE'NO. 88-26:

FALSIFIED PRE-EMPLOYMENT SCREENING RECORDS

Addressees

All holders of operating licenses or construction permits for nuclear power

reactors and all major fuel facility licensees.

Purpose

This information notice is being provided to alert addressees to the falsifi- cation of pre-employment screening records at nuclear facilities.

It is

expected that recipients will review the information for applicability to their

facilities and consider actions, as appropriate, to avoid similar problems.

However, suggestions contained in this Information notice do not constitute

NRC requirements; therefore, no specific action or written response is required.

Description of Circumstances

In 1984, individuals working for a contractor at the Surry Nuclear Plant alleged

that the contractor had encouraged them to provide false information on employ- ment applications concerning their length of service in order to avoid the

background checks that are needed to satisfy security screening requirements.

The Nuclear Regulatory Commission's (NRC) Office of Investigations conducted

an investigation of the activities of Powerplant Specialists, Inc. (PSI),

Costa Mesa, California, who in a joint venture with Southwestern Engineering

Company, Los Angeles, California, was modifying moisture separator reheater

internals at both the North Anna Power Station and the Surry Nuclear Plant.

This investigation showed that in order to obtain unescorted access for Its

employees, PSI provided false certifications and supporting documentation, such

as backdated employment applications and W-4 Federal tax forms, to show at least

three years prior employment with PSI.

The false certifications would have led to exemption of these individuals from

the screening requirements of the licensee's NRC-approved physical security plan

implemented in accordance with 10 CFR 50.34(c).

Discussion:

The NRC has issued IE Circular No. 78-17, "Inadequate Guard Training/

Qualification and Falsified Training Records," dated October 13, 1978; IE

Information Notice No. 82-07, "Inadequate Security Screening Programs," dated

IN 88-26 May 16, 1988 March 16, 1982; IE Information Notice No. 83-15, "Falsified Pre-Employment

Screening Records," dated March 23, 1983; and NRC Information Notice 87-64,

"Conviction for Falsification of Security Training Records" dated December 22,.

1987. These documents alerted licensees to the possibility that contractors

might submit falsified security records to meet licensee commitments to the

NRC.

This information notice is intended to alert licensees to the potential prob- lems associated with falsified employment records and the attendant risk to

site security. Audits required by 10 CFR 73.55(g) and associated security plan

commitments are intended to provide assurance that records are accurate and

complete. Licensees currently employing PSI or similar contractors who will

conduct the pre-employment screening should be aware of the potential for

record falsification and the need for appropriate audits.

Licensees are also

encouraged to notify the NRC of any Instances of the use of falsified screening

records they may discover.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the technical

contact listed below or the Regional Administrator of the appropriate regional

office.

Charles E. Rossi, Director

Division of Operational Events Assessment

Office of Nuclear Reactor Regulation

Technical Contact:

Dick Rosano, Office of Enforcement

(301) 492-0740

Attachment: List of Recently Issued NRC Information Notices

Attachment

IN 88-26

May 16, 1988 LIST OF RECENTLY ISSUED

NRC INFORMATION NOTICES

Information

Date of

Notice No.

Subject

Issuance

Issued to

88-25

88-24

88-23

88-22

Minimum Edge Distance for

Expansion Anchor Bolts

Failures of Air-Operated

Valves Affecting Safety-

Related Systems

Potential for Gas Binding

of High-Pressure Safety

Injection Pumps During a

Loss-of-Coolant Accident

Disposal of Sludge from

Onsite Sewage Treatment

Facilities at Nuclear

Power Stations

Inadvertent Criticality

Events at Oskarshamn

and at U.S. Nuclear

Power Plants

Unauthorized Individuals

Manipulating Controls and

Performing Control Room

Activities

Questionable Certification

of Class lE Components

5/16/88

5/13/88

5/12/88

5/12/88

5/9/88

5/5/88

4/26/88

All holders of OLs

or CPs for nuclear

power reactors.

All holders of OLs

or CPs for nuclear

power reactors.

All holders of OLs

or CPs for PWRs.

All holders of OLs

or CPs for nuclear

power reactors.

All holders of Ols

or CPs for nuclear

power reactors.

All holders of OLs

or CPs for nuclear

power, test and

research reactors, and all licensed

operators.

All holders of OLs

or CPs for nuclear

power reactors.

88-21

88-20

88-19

88-18 Malfunction

Radiography

of Lockbox on

Device

4/25/88

All NRC licensees

authorized to

manufacture, distribute, and/or operate radio- graphic exposure

devices.

OL = Operating License

CP = Construction Permit

IN 88-26 May 16, 1988 March 16, 1982; IE Information Notice No. 83-15, "Falsified Pre-Employment

Screening Records," dated March 23, 1983; and NRC Information Notice 87-64,

"Conviction for Falsification of Security Training Records" dated December 22,

1987. These documents alerted licensees to the possibility that contractors

might submit falsified security records to meet licensee commitments to the

NRC.

This information notice is intended to alert licensees to the potential prob- lems associated with falsified employment records and the attendant risk to

site security. Audits required by 10 CFR 73.55(g) and associated security plan

commitments are intended to provide assurance that records are accurate and

complete. Licensees currently employing PSI or similar contractors who will

conduct the pre-employment screening should be aware of the potential for

record falsification and the need for appropriate audits. Licensees are also

encouraged to notify the NRC of any instances of the use of falsified screening

records they may discover.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the technical

contact listed below or the Regional Administrator of the appropriate regional

office.

Charles E. Rossi, Director

Division of Operational Events Assessment

Office of Nuclear Reactor Regulation

Technical Contact:

Dick Rosano, Office of Enforcement

(301) 492-0740

-

Attachment: List of Recently Issued NRC Information Notices

Transmitted by memo to T. Martin from James Lieberman dated April 8, 1988.

  • SEE PREVIOUS CONCURRENCES
  • OGCB:DOEA:NRR

BMann

DRosano

04/18/88

04/18/88

  • C/OGCB:DOEA:NRR

CHBerlinger

05/03/88

  • D/OE

JLieberman

04/18/88

  • PPMB:ARM

TechEd

04/27/88

  • D/DRIS:NRR

JGPartlow

04/2/8RR

  • D/SGTR:NMSS

RBurnett

05/09/88

  • D/OI

BHayes

05/09/88 f. 1

__ _

4_

o

I -

I

,ff.

A

IN 88-XX

May xx, 1988 March 16, 1982; IE Information Notice No. 83-15, "Falsified Pre-Employment

Screening Records," dated March 23, 1983; and NRC Information Notice 87-64,

"Conviction for Falsification of Security Training Records" dated December 22,

1987. These documents alerted licensees to the possibility that contractors

might submit falsified security records to meet licensee commitments to the

NRC.

This information notice is intended to alert licensees to the potential prob- lems associated with falsified employment records and the attendant risk to

site security. Audits required by 10 CFR 73.55(g) and associated security plan

commitments are intended to provide assurance that these certifications are

supported by accurate and complete records.

Licensees currently employing PSI

or similar contractors who will conduct the pre-employment screening should be

aware of the potential for record falsification and the need for appropriate

audits. Licensees are also encouraged to notify the NRC of any instances of

the use of falsified screening records they may discover.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the technical

contact listed below or the Regional Administrator of the appropriate regional

office.

Charles E. Rossi, Director

Division of Operational Events Assessment

Office of Nuclear Reactor Regulation

Technical Contact:

Dick Rosano, Office of Enforcement

(301) 492-0740

Attachment:

List of Recently Issued NRC Information Notices

Transmitted by memo to T. Martin from James Lieberman dated April 8, 1988.

  • SEE PREVIOUS CONCURRENCES

D/DOEA:NRR

CERossi

05/ /88

  • OGCB:DOEA:NRR
  • OE

BMann

DRosano

04/18/88

04/18/88 C(*'h

  • C/OGCB:DOEA:NRR

CHBerlinger

05/03/88

  • D/OE

JLieberman

04/18/88

  • PPMB:ARM

TechEd

04/27/88

  • D/DRIS:NRR

JGPartlow

04/22/88 D/SGTR:NMSS

RBurnett6 G

M

o ;.. kg2

05A? /88 byplhost

  • D/OI

BHayes

04/ /88

IN 88-XX

April xx, 1988 No. 82-07, "Inadequate Security Screening Programs," dated March 16, 1982;

IE Information Notice No. 83-15, "Falsified Pre-Employment Screening Records,"

dated March 23, 1983; and NRC Information Notice 87-64, "Conviction for Falsi- fication of Security Training Records" dated December 22, 1987.

These docu- ments alerted licensees to the possibility that contractors might submit

falsified security records to meet their commitments to the NRC.

This information notice is intended to alert licensees to the potential prob- lems associated with falsified employment records and the attendant risk to

site security. Audits required by 10 CFR 73.55(g) and associated security plan

commitments are intended to provide assurance that these certifications are

supported by accurate and complete records. Licensees currently employing PSI

or similar contractors who will conduct the pre-employment screening should be

aware of the potential for record falsification and the need for appropriate

audits.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the technical

contact listed below or the Regional Administrator of the appropriate regional

office.

Charles E. Rossi, Director

Division of Operational Events Assessment

Office of Nuclear Reactor Regulation

Technical Contact:

Dick Rosano, Office of Enforcement

(301) 492-0740

Attachment:

List of Rpcentlv Issued NRr Tnfnrmatinn Nnt4irc

Transmitted by memo to T. MO kftfrom T6 "< -e4 L-ft,'-

dated

t-j/

1 /

_

,

-

_,

.

,

A

  • SEE PREVIOUS CONCURRENCES
  • OGCB:DOEA:NRR

BMann

04/18/88

  • OE

DRosano

04/18/88 D/DOEA:NRR

CERossi

04/ /88

  • D/OE

JLMebernman

04/18/88 C/O49 EA: NRR

CHijerl inger

Qg&3/88

  • D/DRIS:NRR

I

JGPartlow

04/22/88

  • PPMB:ARM

TechEd

04/97/88 XID/OI

BHayes

04/ /88 NUM S

F

  • -

)PA e7

IN 88-XX

April xx, 1988 Discussion:

The NRC has previously issued IE Circular No. 78-17, dated October 13, 1978, titled, "Inadequate Guard Training/Qualification and Falsified Training

Records,' IE Information Notice No. 82-07, dated March 16, 1982, titled,

"Inadequate Security Screening Programs," IE Information Notice No. 83-15, dated March 23, 1983, titled, "Falsified Pre-Employment Screening Records", and

NRC Information Notice 87-64, dated December 22, 1987, titled "Conviction for

Falsification of Security Training Records". These NRC notifications served to

alert licensees to the possibility that contractors might submit falsified

security records to meet their commitments to the NRC.

This information notice is intended to alert licensees to the potential prob- lems associated with falsified employment records and the attendant risk to

site security. Audits required by 10 CFR 73.55(g) and associated security plan

commitments are intended to provide assurance that these certifications are

supported by accurate and complete records. Licensees currently employing PSI

or similar contractors to conduct preemployment screening should be aware of

the potential for record falsification and the need for appropriate audits.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the technical

contact listed below or the Regional Administrator of the appropriate regional

office.

Charles E. Rossi, Director

Division of Operational Events Assessment

Office of Nuclear Reactor Regulation

Technical Contact:

Dick Rosano, OE

(301) 492-0740

Attachment: List of Recently Issued NRC Information Notices

Transmitted by memo to

_

from

dated

  • SEE PREVIOUS CONCURRENCES

D/DOEA:NRR

C/OGCB:DOEA:NRR PPMB:ARM

CERossi

CHBerlinger

TechEd A*"e

04/ /88

04/ /88

04/A7/88

  • OGCB:DOEA:NRR
  • OE
  • D/OE

D/DRIS:NRR

X 0D/0f

BMann

DRosano

JLieberman

JGPanlow

BHayes

04/18/88

04/18/88

04/18/88

0A4C 88

04/ /88 P11.~

IN 88-XX

April xx, 1988 Discussion:

The NRC has previously issued IE Circular No. 78-17, dated October 13, 1978, titled, "Inadequate Guard Training/Qualification and Falsified Training

Records," IE Information Notice No. 82-07, dated March 16, 1982, titled,

"Inadequate Security Screening Programs," IE Information Notice No. 83-15, dated March 23, 1983, titled, "Falsified Pre-Employment Screening Records", and

NRC Information Notice 87-64, dated December 22, 1987, titled "Conviction for

Falsification of Security Training Records". These NRC notifications served to

alert licensees to the possibility that contractors might submit falsified

security records to meet their commitments to the NRC.

This information notice is intended to alert licensees to the potential prob- lems associated with falsified employment records and the attendant risk to

site security. Audits required by 10 CFR 73.55(g) and associated security plan

commitments are intended to provide assurance that these certifications are

supported by accurate and complete records. Licensees currently employing PSI

or similar contractors to conduct preemployment screening should be aware of

the potential for record falsification and the need for appropriate audits.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the technical

contact listed below or t the Regional Administrator of the appropriate

regional office.

Charles E. Rossi, Director

Division of Operational Events Assessment

Office of Nuclear Reactor Regulation

Technical Contact:

Pick Rosano,:BE

f,,.--7(301) 492-0740

bi#( 6 EI~arcoax

Attachment: List of Recently Issued NRC Information Notices

Transmitted by memo to

from

dated

D/DOEA:NRR C/OGCB:DOEA:NRR

CERossi

CHBerlinger

FA N

04/ /88

04/ /88 OGCB:DO

a:NRR

OE

'

t/

r

D/OI

PPMR:ARM

BMann 7t.q

DRosano

eberman

BHayes

TechEd

04//P/88

04//T/88

04/if/88

04/ /88

04/ /88

01 0

S*tr

IN 88-XX

April xx, 1988 No. 82-07, "Inadequate Security Screening Programs," dated March 16, 1982;

IE Information Notice No. 83-15, "Falsified Pre-Employment Screening Records,"

dated March 23, 1983; and NRC Information Notice 87-64, "Conviction for Falsi- fication of Security Training Records' dated December 22, 1987. These docu- ments alerted licensees to the possibility that contractors might submit

falsified security records to meet their commitments to the NRC.

This information notice is intended to alert licensees to the potential prob- lems associated with falsified employment records and the attendant risk to

site security. Audits required by 10 CFR 73.55(g) and associated security plan

coumitments are intended to provide assurance that these certifications are

supported by accurate and complete records. Licensees currently employing PSI

or similar contractors who will conduct the pre-employment screening should be

aware of the potential for record falsification and the need for appropriate

audits.

No specific action or written response is required by this information notice.

If you have any questions about this matter, please contact the technical

contact listed below or the Regional Administrator of the appropriate regional

office.

Charles E. Rossi, Director

Division of Operational Events Assessment

Office of Nuclear Reactor Regulation

Technical Contact:

Dick Rosano, Office of Enforcement

(301) 492-0740

Attachment: List of Recently Issued NRC Information Notices

Transmitted by memo to T.MO W'f'lfrom Ta

14"-

datedE P If

J

f U

  • SEE PREVIOUS CONCURRENCES

?h

5 D/DOEA:NRR

CERossi

04/ /88

  • D/OE

JLieberman

04/18/88 C/O'TCV:OfiEA:NRR

CHDerlinger

Q§V3/88

  • D/DRIS:NRR

JGPartlow

04/22/88

  • OGCB:DOEA:NRR

BMann

04/18/88

  • OE

DRosano

04/18/88

  • PPMB:ARM

TechFd

04/27/FS

BHayes

Nr

0flls (/%