Information Notice 1988-19, Questionable Certification of Class Ie Components

From kanterella
Jump to navigation Jump to search
Questionable Certification of Class Ie Components
ML031150283
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane
Issue date: 04/26/1988
Revision: 0
From: Rossi C E
Office of Nuclear Reactor Regulation
To:
References
IN-88-019, NUDOCS 8804220217
Download: ML031150283 (5)


UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D.C. ?0555April 26, 1988NRC INFORMATION NOTICE NO. 88-19: QUESTIONAELE CERTIFICATION OFCLASS lE COMPONENTS

Addressees

All holders of operating licenses or construction permits for nuclear powerreactors.

Purpose

This information notice Is being provided to alert addressees to a possibleproblem with the certification of Class lE components furnished by PlannedMaintenance Systems (PMS) of Mt. Vernon, Illinois. It is expected thatrecipients will review the information for applicability to their facilitiesand consider actions, as appropriate, to avoid similar problems. However,suggestions contained in this information notice do not constitute NRCrequirements; therefore, no specific action or written response is required.

Description of Circumstances

On April 1, 1988, Wolf Creek Nuclear Operating Corporation (WCNOC) submitteda written 10 CFR Part 21 Notification to NRC Region IV concerning 60 Class lEfuses that had been procured from PMS. One of the requirements of the purchaseorder (PO) issued to PMS was that the PO Items were to be supplied in accord-ance with the requirements of a specific fuse qualification specification forClass 1E equipment. This specification contained detailed requirements includingmaterials, environmental qualification, seismic qualification, and inspection/test requirements. The PMS Certificate of Compliance supplied with the ordercertified that all of the procurement document requirements had been met andno deviations from the requirements had been identified.The fuses were placed on hold by WCNOC because a required Quality Departmentsurveillance had not been performed. A subsequent WCNOC surveillance revealedthat the records in PMS's possession did not support the statement on the PMSCertificate of Compliance that all PO requirements had been met. Qualificationspecification requirements were not covered by PMS quality assurance recordswith respect to information on environmental qualification, radiation levels,and seismic qualification. In addition, it could not be established that arequired continuity/resistance check of each fuse had been performed beforethe fuses were shippe IN 88-19April 26, 1988Page ? of 2Discussion:The WCNOC 10 CFR Part ?1 notification has brought into question the validityof the Certificate of Compliance issued by PMS for Class IE fuses that theysupplied. Accordingly, licensees may wish to review Class IF component pro-curements from this vendor to ensure that appropriate bases exist for the useof the components.No specific action or written response is required by this Information notice.If you have any questions about this matter, please contact the technicalcontact listed below or the Regional Administrator of the appropriate regionaloffice.Charles E. Rossi, DirectorDivision of Operational Events AssessmentOffice of Nuclear Reactor Regulation

Technical Contact:

Joseph J. Petrosino, NRR(301) 492-0979Attachment-,--ist of-Recently Issued-NRC Information Notices AttachmentIN 88-19April 26, 1988 LIST OF RECENTLY ISSUEDNPC INFORMATION NOTICESInformation Date ofNotice No. Subject Issuance Issued to88-1888-1788-1688-15Malfunction of Lockbox onRadiography DeviceSummary of Responses to NPCBulletin 87-01, "Thinning ofPipe Walls in Nuclear PowerPlants"Identifying Waste Generatorsin Shipments of Low-LevelWaste to Land DisposalFacilitiesAvailability of U.S. Foodand Drug Administration(FDA)-Approved PotassiumIodide for Use in EmergenciesInvolving Radioactive IodinePotential Problems withElectrical RelaysWater Hammer and PossiblePiping Damage Caused byMisapplication of KerotestPackless Metal DiaphragmGlobe ValvesOvergreasing of ElectricMotor Bearings4/25/884/22/884/22/884/18/884/18/884/18/884/12/88All NRC licenseesauthorized tomanufacture, distribute,and/or operate radio-graphic exposuredevices.All holders of OLsor CPs for nuclearpower reactors.Radioactive wastecollection andservice companylicensees handlingprepackaged waste,and licensees operatinglow-level wastedisposal facilities.Medical, Academic,and Commerciallicensees who possessradioactive iodine.All holders of OLsor CPs for nuclearpower reactors.All holders of OLsor CPs for nuclearpower reactors.All holders of OLsor CPs for nuclearpower reactors.88-1488-1388-12OL = Operating LicenseCP = Construction Permit IN 88-19April 26, 1988 Discussion:The WCNOC 10 CFR Part 21 notification has brought into question the validityof the Certificate of Compliance Issued by PMS for Class 1E fuses that theysupplied. Accordingly, licensees may wish to review Class 1E component pro-curements from this vendor to ensure that appropriate bases exist for the useof the components.No specific action or written response is required by this information notice.If you have any questions about this matter, please contact the technicalcontact listed below or the Regional Administrator of the appropriate regionaloffice.Charles E. Rossi, DirectorDivision of Operational Events AssessmentOffice of Nuclear Reactor Regulation

Technical Contact:

Joseph J. Petrosino, NRR(301) 492-0979

Attachment:

List of Recently Issued NRC Information Notices-Transmitted by datedZ::~z /e4z151;,1 'X*SEE PREVIOUS CONCU REE^w RkFX*C/OGCB: DOEA: NRRC ICHBerlinger04/22/88*OGCB:DOEA:NRR *VIB:DRIS:NRR AC/VIB:DRIS:NRRJERamsey JJPetrosino JStone04/22/88 04/22/88 04/22/88*PPMB:ARMTechEd04/22/88*DD/DRIS:NRRBKGrimes04/22/88*D/OI/RIVDDriskill04/22/88*D/DRIS:NRRJGPartlow04/22/88 IN 88-XXApril xx, 1988 Discussion:The WCNOC 10 CFR Part 21 notification has brought into question the validity ofthe Certificate of Compliance issued by PMS for Class 1E fuses that theysupplied. Accordingly, licensees may wish to review Class 1E component pro-curements from this vendor to ensure that appropriate bases exist for the useof the components.No specific action or written response is required by this information notice.If you have any questions about this matter, please contact the technicalcontact listed below or the Regional Administrator of the appropriate regionaloffice.Charles E. Rossi, DirectorDivision of Operational Events AssessmentOffice of Nuclear Reactor Regulation

Technical Contact:

Joseph J. Petrosino, NRR(301) 492-0979

Attachment:

Transmitted tList of Recently Issued NRC Information Noticesby dated*SEE PREVIOUSOG :NRR041-./88CONCURRENCESD/DOEA:NRRCERossi04/ /88VIB:DRJM RRJJPetrM 'no04=/88C/O OB : NRRCHBerlinger04/-r?88AC/VJStone04/%7/88*PPMB:ARMTechEd04/23380j'I/kI/RIV <^owDDriskill04jRW/88D/DRIS:NRFs iJGPartlow04$. /88" Per gV/3/ ray /-1,Fex-"W11/S2/ee*4 Is ,S , -OJMcn= A"ztcAI/V'd~ ) / 2 31g