IR 05000498/1977013

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/77-13 & 50-499/77-08 on 771219-21.No Noncompliance Noted
ML20211F154
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/04/1978
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20150F241 List:
References
FOIA-85-378 NUDOCS 8610310080
Download: ML20211F154 (2)


Text

. .. ... . -- c3 . e5 e

-

- . , .

to b

. ..

pa Mcg d UNITED STATES

o *

NUCLEAR REGULATORY COMMISSION

[

lE R n REGION IV

,1 ,

,j

,

611 RYAN PLAZA DRIVE, SUITE 1000

,. .! AR LINGTON, T E X AS 76011

%,.....-o/

January 4,1978 In Reply Refer To:

RIV Docket No. 50-498/Rpt. 77-13 50-499/Rpt. 77-08

,

Houston Lighting and Power Company ATTN: Mr. G. W. Oprea, J Executive Vice President Post Office Box 1700 Houston, Texas 77001 Gentlemen:

This refers to the inspection conducted by Messrs. R. G. Taylor and L. Gilbert of our staff during the period December 19-21, 1977, of activities authorized by NRC Construction Permit Nos. CPPR-128 and 129 for South Texas Project, Units No.1 and 2, and to the discussion of our findings with M W. N. Phillips and other members of your staff at the conclusion of the inspectio Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examination of procedures and representative records, inter-views with personnel, and observations by the inspector Within the scope of the inspection, no items of noncompliance were identifie We have also examined actions you have taken with regard to a previously identified unresolved item. The status of this item is identified in para-graph 2 of the enclosed repor In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Roo If the report contains any information that you believe to be proprietary, it is necessary that you submit a written application to this effice, within 20 days of the date of this letter, requesting that such information be withheld from public disclosur The application must include a full statement of the reasons why it is claimed that the information is proprietar The application t

b 8610310080 860930 PDR FOIA CARDE85-378 PDR 0 #

'

- - - ~

. _ _ . . _ _ _ . _ .

.

.

.

,

'

, .'

.

'

. .

  • Hous' ton 1.ighting and Power Company -2- January 4,1978 should be prepared so that any proprietary information identified is con-tained in an enclosure to the application, since the application without the enclosure will also be placed in the Public Document Room. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Roo Should you have any questions concerning this inspection, we will be pleased to discuss them with yo

Sincerely,

.- .

,.-

a ff /Nhr

~

W. C. SeiN, Chief Reactor Construction and i Engineering Support Branch Enclosure:

IE Inspection Report No. 50-498/77-13 50-499/77-08 l

l l

!

!

).

i

.__ _ _ ... ___ _

. - . - - - . __