Text
UNITE D STATES
h
[@oc
oq
.,
,
b
NUCLEAR REGULATC2Y CCMMISSION
6
,
8'
REGION IV
..I )
).
611 RYAN PLAZA CRIVE, SUITE 1000
.-
Q .p]e$
i
% * *O
January 27,1:;78
"*
- ck
E
In Reply Refer To:
.
RIV
%,
t-
ST-AE-HL-55fo /p
l
Docket No. 50-498/Rpt. 78-01
SFN:
570'
50-499/Rpt. 78-01
g
Op4
. ! .-
.
Houston Lighting and Power Company
l-
ATTN: Mr. G. W. Oprea, Jr.
,
Executive Vice President
Post Office Box 1700
Houston, Texas
77001
Gentlemen:
e
This refers to the inspection conducted by Messrs. R. G. Taylor and J. I.
.
Tapia of our staff during the period January 10-13, 1978, of activities
.
authorized by NRC Construction Pemit Nos. CPPR-128 and 129 for South
Texas Project, Units No.1 and 2, and to the discussion of our findings
with Mr. W. N. Phillips and other members of your staff at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, inter-
,
views with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with Appendix B to 10 CFR 50 o ~
'
'
the NRC Regulations, " Quality Assurance Criteria for Nuclear Power
Pl ants . " These items of noncompliance and references to the pertinent
requirements are identified in the enclosed Notice of Violation.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
within 30 days of your receipt of this, notice, a written statement or
explanation in reply including: (1) corrective steps which have been
taken by you, and the results achieved; ( ; corrective steps which will
be taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
,
/
-
l
L..
(/
'
.
$dO3Mjj4e6093o
GARDE 85-37g
l
R
.
. .
.
.
..
,
,
1
-
-
J.
324
..
-
.
'
.
.
j'
Houston Lighting and Power Company
-2-
January 27, 1978
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
1
l
2 Title 10, Code of Federal Regulations, a copy of this letter and the
l 5,
enclosed inspection report will be placed in the NRC's Public Document
--
If the report contains any information that you believe to be
Room.
proprietary, it is necessary that you submit a written application to
.
this office, within 20 days of the date of this letter, requesting that
- -
The application
such information be withheld from public disclosure.
.
- -
must include a full statement of the reasons why it is claimed that the
'.
.
information is proprietary. The application should be prepared so that
j '.
any proprietary information identified is contained in an enclosure to
'
the application, since the application without the enclosure will also
If we do not hear from you in
be placed in the Public Document Room.
this regard within the specified period, the report will be placed in
,
.
the Public Document Room.
,.;.
Should you have any questions concerning this inspection, we will be
/
pleased to discuss them with you.
Sincerely,
-I
f
[W. C. Seidle, Chief
i
Reactor Construction and
'
Engineering Support Branch
'
Enclosures:
1.
Appendix A, Notice of Violation
e
2.
IE Inspection Report No. 50-498/78-01
.
50-499/78-01
.
,
.
.
i
si
.
-
. . . .
. . . . .
.
. . . . . . . .
.
.,
.-
,