Text
(
)
326
.
.
.-
.
- I
U. S. NUCLEAR REGULATORY C0!WISSION
-
,
,
0FFICE OF INSPECTION AND ENFORCEMENT
,}'
.}
REGION IV
'
.:
.
E.
Report No. 50-498/78-01; 50-499/78-01
-
3.
'
Docket No. 50-498; 50-499
Category A2
g
t .-
Licensee: Houston Lighting and Power Company
S
Post Office Box 1700
l'
Houston, Texas
77001
Facility flame: South Texas Project, Units 1 & 2
'
Inspection at:
South Texas Project, Matagorda County Texas
Inspection conducted:
January 10-13, 1978
Y.
Mr
,
.
..!// c/
/I&'d',l'
!b
Inspectors:
'
7-
/
.
' I.
"*R.' G.'Taylorf, Reactor Inspector, Projects Section
ETate
.
- 5
(Paragraphs 1, 2, 3 & 6)
,hf
A
llL7f77
, ,-:
Afd. I. Tapia, Reactor Inspector-Intern, Engineering
Date
7'
Support Section (Paragraphs 4 & 5)
b
Other
i
Accompanying
-
Personnel:
W. A. Crossman, Chief, Projects Section~
W. G. Hubacek, Reactor Inspector, Projects Section
'
- .
k. b
a
//17f75
Approved:
'
'
I W. A. Crossman, Chief,pProjects Section
Date
//47
y'
-
R. E. Hall, Chief Engineering Support Section
Da'te /
,
'l
l
.
' l?
.
- .5
II
R
.
!k;
8610310203 860930
. . ,
',
GARDE 85-378
'
-- - - . ~
-- -
-
. ., .
. . .
.,...- , ,-- . ---......... .
.
)
327
'
,
'
,
-
.
'
e
Inspection Summary:
Inspection on January 10-13,1978 (Report No. 50-498/78-01; 50-499/78-01)
Routine, announced inspection involving follow up on status
Areas Inspected:
of structural steel column repair activities; review of material properties in
'
"-
Unit 1 containment liner; observation of concrete placecent activities in Units
~
1 and 2;'and review of records of concrete placements for Unit 1.
The inspection
y
involved fifty-one inspector hours by two NRC inspectors.
.-
'.
Results: Of the five areas inspected, no items of noncompliance or deviations
-l
were identified in four. Two apparent items of noncompliance (two infractions -
-
failure to follow procedures for concrete placements) were. identified.
.
!i
.
g
.,
-
%
- 1
1
.
e
k
a
5
-
.
1
-
e
.
9
- .
. .\\
'
!.
-2-
.
.
y9
, , .
- %=
- c . e m% se
+
w-
===m
m
M
4D
r
..
..
'
'
.
.
'
DETAILS
~
.y
1
1.
Persons Contacted
t
Principal Licensee Personnel
~
..
~ . .}
- W.* N. Phillips, Project Quality Assurance Manager
- S. A. Viaclovsky, Site Quality Assurance Supervisor
ae
- L. D. Wilson, Lead Quality Assurance Specialist
- T. K. Logan, Lead Quality Assurance Engineer
.,
R. A. Frazar, Manager-Quality Assurance
'
'
- F. D. Asbeck, Construction Supervisor
.
D. G. Long, Quality Assurance Engineer
D. Douglas, Quality Assurance Engineer
>
-
- -
Other Personnel
!. .
- C. L. Crane, Brown & Root Construction Project Manager
- T. Schreeder, Jr., Brown & Root Quality Control Supervisor
'
-
- .
T. J. Foley, Pittsburgh-Des Moines Site QA Manager
,
J. G. Munisteri, Brown & Root Senior Vice President
6
T. H. Gammon, Brown & Root Quality Assurance Manager
.
&
- denotes those attending the exit meeting.
.
2.
Containment Liner Materials - Unit 1
.
The IE inspector randomly selected six (6) containment liner plates as
indicated below from the cylindrical portion for examination of certified
.
material test reports and other applicable site documents. The plates
selected were from rings nine through seventeen since randomly selected
,'
platesinphefloorandthefirsteightringshadbeenpreviouslyThe certified mate
"
examined..I.
,
,'
-
and physical properties of each plate complied with the requirements of
1
SA-285 for Grade A material as required by project specification
'
_
2C269SS006F, " Steel Liner Work for Reactor Containcent Structures," and
'
as allowed by ASME,Section III, Division 2 in Table 1-2.2 which in turn
.
i
is referenced in paragraph 3.8.1.2.1 of the PSAR.
,
.
Plate Identification
Material Identification
Mill Heat Number
I706
802W66380
2058-5
.
22510-8
1736
822W50670
24512-11
1767
802X67350
26514-13
1816
802X79290
a
1/ Inspection Report 50-498/77-01; 50-498/77-05
-3-
.-- -- - .-
-
- - -
- - - .
.
.. .
..
. , . . . . . . . . . . . . . . . . . . . . . . . - - ~
<
fl
329
-
.
'
.
-
,
,
'
'
~
28516-8
1827.
802X79290
{
29517-7
6781
802A59730
'
No items of ncncompliance or deviations were identified in this area
i
of the inspection.
Ic
-
'
/
3.
Structural Steel Coluen Repairs - 10 CFR 50.55(e) Item
'
.
C
The inspector reviewed the status of repair work relative to the
structural steel columns fabricated by.LAMCO for use in the steam
.*
generator and reactor coolant pump support systems. The technical
!N
aspects of the repairs were reported in the licensee's letter dated
.
November 11, 1977, to RIV.
IE inspectors reviewed applicable repair
procedures and observed the work during inspections 50-498/77-11 and
e
50-498/77-13.
During this inspection, it was found that weld defects,
4-
incurred in the original fabrication, have been removed from all nine-
teen columns involved.
Repair welding and nondestructive examinations
U
have been completed on fifteen of the columns with fourteen having re-
'
ceived a final post weld stress relief. The inspector had no further
-
[
questions on this matter.
,
c
- .
4.
Concrete Placement Activities
h
The inspector observed the consolidation of one lift of' pumped concrete
J
in placements No. FH1-W20 and FH2-W8. Both placements are interior
Y
walls in the respective Unit 1 and Unit 2 Fuel Handling Buildings.
i :
Consolidation of the concrete was being performed by 3 inch diameter
h
internal vibrators with a minimum frequency of 9,000 hertz.
The distance
L
between insertions of the vibrators was observed to be in excess of the
l
2-1/2 feet required by Brown & Root quality control procedure STP-QCp-4.4,
y
April 1,1976, " Concrete Inspection." (This procedure invokes American
c
Concrete Institute Standard ACI-309-72, " Recommended Practice for
l
F
Consolidation of Concrete," which states in section 7.1, " Procedure
J
for Internal Vibration,""that the distance between insertions should
generally be about 1-1/2 times the radius of action." The radius of
~
,
O
action is defined in Table 5.1.4 of ACI-309-72.
For the given vibrator
'
l
diameter and frequency, the radius of action is 20 inches. Therefore,
the recommended distance between insertions is 30 inches or 2-1/2 feet.)
,
During the placement of the first lift of concrete in placement No.
FH2-WS, the Brown & Root quality corttrol inspector indicated that the
acceptance criteria for internal v'ibrator spacing was from 4 to 5 feet.
He was unaware of the requirement for vibrator spacing contained in the
i
construction and quality control procedures. This confinted the obser-
vation made by the NRC inspector of vibrator spacing of up to four feet.
b
.
N
- .,
-4-
1
-
..
.
. . . .
-
-
- .
.-
.
.-
i
_
_
.
)
330
.
..
Y
'
~
-
.
-
..
,
The average daily temperature during placement No. FH2-WD was 40 digrees
.
Fahrenheit. The ambient temperature as observed by the inspector at the
.
commencement of the placement was approximately 35 degrees Fahrenheit.
The Brown & Root construction procedure No. A040KPCCP-4, Revision. 3,
'
requires that if the ambient temperature is from 30 to 45 degrees Fahren-
- )-
heit, the minimum temperature of the concrete when delivered to the pour
1
':
location must be at least 50 degrees Fahrenheit. The first Concrete Test
6
Load Ticket No. 03680, indicated a concrete temperature at pour location
--
S
of 46 degrees Fahrenheit. The concrete was placed. Upon notification
%
by the inspector, the licensee issued a Deficiency Report.
These findings
J.
represent noncompliance with the requirements related to the accomplish-
ment of activities affecting quality in accordance with documented proce-
dures. Specifically, these findings represent noncompliance with the
,
.h
conditions of Criterion V of Appendix B to 10 CFR 50.
-
5.
Review of Concrete Records
A review was conducted of quality assurance records relative to place-
'
,
.
ment No. CSI-W7.
This placement is the seventh 10 foot lift in the
?
Unit 1 containment from elevation +47 feet to +57 feet. The following
records were reviewed:
,
f9
a.
Curing Inspection Card
.s
b.
Concrete Inspection Books (4)
, r
.
c.
Special Pre-pour Checklist and Pour Card
,
'y
d.
Post-tensioning Sheathing Inspection Report
e.
Concrete Test Load Tickets (12)
'
,
i
'
.
f.
Daily Batch Plant Operation Report
.
Batch Record Summary
g.
e
i
h.
Moisture Content of Aggregates Reports (6)
I
i.
Moisture Adjustment and Batch Weights Reports (3)
'
.
j.
Batch Plant Equipment Inspection Report
..
'
k.
Field Testing Summary
2
The records reviewed appeared to be consistent with project specifi-
cations 2A01C5001-F, " Concrete Supply," and 2A010CS028-E, " Concrete
Construction."
b
No items of noncompliance or deviations were identified.
..
! 'i
-5-
I
.
.
_ _
_
_. .
. . . .
. .
.. .
. ,
.
e-
--
-
,
.
i
u
331
.,
(
[r. 'C'
-
-
.
,
.!.
', s
i
.
. ,
.
-
J.
.
i
6.
Exit Interview
!?
The inspectors met with licensee representatives (denoted in paragraph
+b:
1) at the conclusion of the inspection on January 13, 1978. The in-
spectors summarized the scope of the inspection and their findings.
The licensee representatives acknowledged understanding the findings
-
but' made no commitments. Mr. W. G. Hubacek was introduced to the
h.
'
licensee representative as the replacement for Mr. Taylor as the
Project Inspector for the South Texas Project effective on January 16,
, . 4
siff
i.-
1978.
It was explained that the assignment changes were being made
].f
in accordance with IE policy governing duration of such assignments.
'
The licensee was requested to direct all infonnal contacts to Mr. Hubacek
.
';
- ,
-
effective immediately.
l +'
,:
- l ? ll.
7;-
-
26
? l
g
.
Y
.'t
r'
%
"-
7.
- .
' . . f '.-
.i 7
$
'
- t.
-
.e
-i
g.-
.
.
t
.,
di
.
, {
,
-
?.
s
e
.
9
e.
9
t'
.
E
so
6
er.
e
'
-6-
'
,
.
O
4
- a- r==
-- * * * *
- "***a
-
v
,w - < = = = . . = -
..-......,--.......,me=-
w
,
.-
?