Insp Repts 50-498/78-01 & 50-499/78-01 on 780110-13. Noncompliance Noted:Failure to Follow Procedures for Concrete Placements
ML20211F578
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/27/1978
From: Crossman W, Randy Hall, Tapia J, Renee Taylor
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20150F241 List:
References
FOIA-85-378 50-498-78-01, 50-498-78-1, 50-499-78-01, 50-499-78-1, NUDOCS 8610310203
Download: ML20211F578 (6)


See also: IR 05000498/1978001

Text

(

)

326

.

.

.-

.

  • I

U. S. NUCLEAR REGULATORY C0!WISSION

-

,

,

0FFICE OF INSPECTION AND ENFORCEMENT

,}'

.}

REGION IV

'

.:

.

E.

Report No. 50-498/78-01; 50-499/78-01

-

3.

'

Docket No. 50-498; 50-499

Category A2

g

t .-

Licensee: Houston Lighting and Power Company

S

Post Office Box 1700

l'

Houston, Texas

77001

Facility flame: South Texas Project, Units 1 & 2

'

Inspection at:

South Texas Project, Matagorda County Texas

Inspection conducted:

January 10-13, 1978

Y.

Mr

,

.

..!// c/

/I&'d',l'

!b

Inspectors:

'

7-

/

.

' I.

"*R.' G.'Taylorf, Reactor Inspector, Projects Section

ETate

.

5

(Paragraphs 1, 2, 3 & 6)

,hf

A

llL7f77

, ,-:

Afd. I. Tapia, Reactor Inspector-Intern, Engineering

Date

7'

Support Section (Paragraphs 4 & 5)

b

Other

i

Accompanying

-

Personnel:

W. A. Crossman, Chief, Projects Section~

W. G. Hubacek, Reactor Inspector, Projects Section

'

  1. .

k. b

a

//17f75

Approved:

'

'

I W. A. Crossman, Chief,pProjects Section

Date

//47

y'

-

R. E. Hall, Chief Engineering Support Section

Da'te /

,

'l

l

.

' l?

.

.5

II

R

.

!k;

8610310203 860930

PDR

FOIA

. . ,

',

GARDE 85-378

PDR

'

-- - - . ~

-- -

-

. ., .

. . .

.,...- , ,-- . ---......... .

.

)

327

'

,

'

,

-

.

'

e

Inspection Summary:

Inspection on January 10-13,1978 (Report No. 50-498/78-01; 50-499/78-01)

Routine, announced inspection involving follow up on status

Areas Inspected:

of structural steel column repair activities; review of material properties in

'

"-

Unit 1 containment liner; observation of concrete placecent activities in Units

~

1 and 2;'and review of records of concrete placements for Unit 1.

The inspection

y

involved fifty-one inspector hours by two NRC inspectors.

.-

'.

Results: Of the five areas inspected, no items of noncompliance or deviations

-l

were identified in four. Two apparent items of noncompliance (two infractions -

-

failure to follow procedures for concrete placements) were. identified.

.

!i

.

g

.,

-

%

  • 1

1

.

e

k

a

5

-

.

1

-

e

.

9

.

. .\\

'

!.

-2-

.

.

y9

, , .

  • %=

- c . e m% se

+

w-

===m

m

M

4D

r

..

..

'

'

.

.

'

DETAILS

~

.y

1

1.

Persons Contacted

t

Principal Licensee Personnel

~

..

~ . .}

  • W.* N. Phillips, Project Quality Assurance Manager
  • S. A. Viaclovsky, Site Quality Assurance Supervisor

ae

  • L. D. Wilson, Lead Quality Assurance Specialist
  • T. K. Logan, Lead Quality Assurance Engineer

.,

R. A. Frazar, Manager-Quality Assurance

'

'

  • F. D. Asbeck, Construction Supervisor

.

D. G. Long, Quality Assurance Engineer

D. Douglas, Quality Assurance Engineer

>

-

- -

Other Personnel

!. .

  • C. L. Crane, Brown & Root Construction Project Manager
  • T. Schreeder, Jr., Brown & Root Quality Control Supervisor

'

-

.

T. J. Foley, Pittsburgh-Des Moines Site QA Manager

,

J. G. Munisteri, Brown & Root Senior Vice President

6

T. H. Gammon, Brown & Root Quality Assurance Manager

.

&

  • denotes those attending the exit meeting.

.

2.

Containment Liner Materials - Unit 1

.

The IE inspector randomly selected six (6) containment liner plates as

indicated below from the cylindrical portion for examination of certified

.

material test reports and other applicable site documents. The plates

selected were from rings nine through seventeen since randomly selected

,'

platesinphefloorandthefirsteightringshadbeenpreviouslyThe certified mate

"

examined..I.

,

,'

-

and physical properties of each plate complied with the requirements of

1

SA-285 for Grade A material as required by project specification

'

_

2C269SS006F, " Steel Liner Work for Reactor Containcent Structures," and

'

as allowed by ASME,Section III, Division 2 in Table 1-2.2 which in turn

.

i

is referenced in paragraph 3.8.1.2.1 of the PSAR.

,

.

Plate Identification

Material Identification

Mill Heat Number

I706

802W66380

2058-5

.

22510-8

1736

822W50670

24512-11

1767

802X67350

26514-13

1816

802X79290

a

1/ Inspection Report 50-498/77-01; 50-498/77-05

-3-

.-- -- - .-

-

- - -

- - - .

.

.. .

..

. , . . . . . . . . . . . . . . . . . . . . . . . - - ~

<

fl

329

-

.

'

.

-

,

,

'

'

~

28516-8

1827.

802X79290

{

29517-7

6781

802A59730

'

No items of ncncompliance or deviations were identified in this area

i

of the inspection.

Ic

-

'

/

3.

Structural Steel Coluen Repairs - 10 CFR 50.55(e) Item

'

.

C

The inspector reviewed the status of repair work relative to the

structural steel columns fabricated by.LAMCO for use in the steam

.*

generator and reactor coolant pump support systems. The technical

!N

aspects of the repairs were reported in the licensee's letter dated

.

November 11, 1977, to RIV.

IE inspectors reviewed applicable repair

procedures and observed the work during inspections 50-498/77-11 and

e

50-498/77-13.

During this inspection, it was found that weld defects,

4-

incurred in the original fabrication, have been removed from all nine-

teen columns involved.

Repair welding and nondestructive examinations

U

have been completed on fifteen of the columns with fourteen having re-

'

ceived a final post weld stress relief. The inspector had no further

-

[

questions on this matter.

,

c

.

4.

Concrete Placement Activities

h

The inspector observed the consolidation of one lift of' pumped concrete

J

in placements No. FH1-W20 and FH2-W8. Both placements are interior

Y

walls in the respective Unit 1 and Unit 2 Fuel Handling Buildings.

i :

Consolidation of the concrete was being performed by 3 inch diameter

h

internal vibrators with a minimum frequency of 9,000 hertz.

The distance

L

between insertions of the vibrators was observed to be in excess of the

l

2-1/2 feet required by Brown & Root quality control procedure STP-QCp-4.4,

y

April 1,1976, " Concrete Inspection." (This procedure invokes American

c

Concrete Institute Standard ACI-309-72, " Recommended Practice for

l

F

Consolidation of Concrete," which states in section 7.1, " Procedure

J

for Internal Vibration,""that the distance between insertions should

generally be about 1-1/2 times the radius of action." The radius of

~

,

O

action is defined in Table 5.1.4 of ACI-309-72.

For the given vibrator

'

l

diameter and frequency, the radius of action is 20 inches. Therefore,

the recommended distance between insertions is 30 inches or 2-1/2 feet.)

,

During the placement of the first lift of concrete in placement No.

FH2-WS, the Brown & Root quality corttrol inspector indicated that the

acceptance criteria for internal v'ibrator spacing was from 4 to 5 feet.

He was unaware of the requirement for vibrator spacing contained in the

i

construction and quality control procedures. This confinted the obser-

vation made by the NRC inspector of vibrator spacing of up to four feet.

b

.

N

.,

-4-

1

-

..

.

. . . .

-

-

- .

.-

.

.-

i

_

_

.

)

330

.

..

Y

'

~

-

.

-

..

,

The average daily temperature during placement No. FH2-WD was 40 digrees

.

Fahrenheit. The ambient temperature as observed by the inspector at the

.

commencement of the placement was approximately 35 degrees Fahrenheit.

The Brown & Root construction procedure No. A040KPCCP-4, Revision. 3,

'

requires that if the ambient temperature is from 30 to 45 degrees Fahren-

)-

heit, the minimum temperature of the concrete when delivered to the pour

1

':

location must be at least 50 degrees Fahrenheit. The first Concrete Test

6

Load Ticket No. 03680, indicated a concrete temperature at pour location

--

S

of 46 degrees Fahrenheit. The concrete was placed. Upon notification

%

by the inspector, the licensee issued a Deficiency Report.

These findings

J.

represent noncompliance with the requirements related to the accomplish-

ment of activities affecting quality in accordance with documented proce-

dures. Specifically, these findings represent noncompliance with the

,

.h

conditions of Criterion V of Appendix B to 10 CFR 50.

-

5.

Review of Concrete Records

A review was conducted of quality assurance records relative to place-

'

,

.

ment No. CSI-W7.

This placement is the seventh 10 foot lift in the

?

Unit 1 containment from elevation +47 feet to +57 feet. The following

records were reviewed:

,

f9

a.

Curing Inspection Card

.s

b.

Concrete Inspection Books (4)

, r

.

c.

Special Pre-pour Checklist and Pour Card

,

'y

d.

Post-tensioning Sheathing Inspection Report

e.

Concrete Test Load Tickets (12)

'

,

i

'

.

f.

Daily Batch Plant Operation Report

.

Batch Record Summary

g.

e

i

h.

Moisture Content of Aggregates Reports (6)

I

i.

Moisture Adjustment and Batch Weights Reports (3)

'

.

j.

Batch Plant Equipment Inspection Report

..

'

k.

Field Testing Summary

2

The records reviewed appeared to be consistent with project specifi-

cations 2A01C5001-F, " Concrete Supply," and 2A010CS028-E, " Concrete

Construction."

b

No items of noncompliance or deviations were identified.

..

! 'i

-5-

I

.

.

_ _

_

_. .

. . . .

. .

.. .

. ,

.

e-

--

-

,

.

i

u

331

.,

(

[r. 'C'

-

-

.

,

.!.

', s

i

.

. ,

.

-

J.

.

i

6.

Exit Interview

!?

The inspectors met with licensee representatives (denoted in paragraph

+b:

1) at the conclusion of the inspection on January 13, 1978. The in-

spectors summarized the scope of the inspection and their findings.

The licensee representatives acknowledged understanding the findings

-

but' made no commitments. Mr. W. G. Hubacek was introduced to the

h.

'

licensee representative as the replacement for Mr. Taylor as the

Project Inspector for the South Texas Project effective on January 16,

, . 4

siff

i.-

1978.

It was explained that the assignment changes were being made

].f

in accordance with IE policy governing duration of such assignments.

'

The licensee was requested to direct all infonnal contacts to Mr. Hubacek

.

';

,

-

effective immediately.

l +'

,:

l ? ll.

7;-

-

26

? l

g

.

Y

.'t

r'

%

"-

7.

      • .

' . . f '.-

SS

.i 7

$

'

- t.

-

.e

-i

g.-

.

.

t

.,

di

.

, {

,

-

?.

s

e

.

9

e.

9

t'

.

E

so

6

er.

e

'

-6-

'

,

.

O

4

  • a- r==

-- * * * *

  • "***a

-

v

,w - < = = = . . = -

..-......,--.......,me=-

w

,

.-

?