IR 05000498/1978010

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/78-10 & 50-499/78-10 on 780530-0602.No Noncompliance Noted
ML20211F534
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/20/1978
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20150F241 List:
References
FOIA-85-378 ST-AE-HL-562, NUDOCS 8610310193
Download: ML20211F534 (2)


Text

,

__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

_

r .. .

- r

.

,

, ,

UNirg3 STATES ,

.. * ,ggs mer

  • * tuCLEAn RE1ULAT30Y COMMISSION N, f . e .
  • y e REGION IV

,

S11 RYAN PLAZA ORIVE,SulTE 1000

I 2 ARLINGTON, TEXAS 79011

.

's,***** June 20,1978 l

,,

,

j j In Reply Refer To: ,

, RIV L-562 ..

'

Docket No. 50-498/Rpt. 78-10 SF - C-0570 50-499/Rpt. 78-10

[] .

j.{

t *: *

Houston Lighting and Power Company ATTN: Mr. E. A. Turner, Vice President Power Plant Construction and Technical Services

, Post Office Box 1700

- Houston, Texas 77001 E' Gentlemen:

' *

if" This refers to the inspection conducted by Vessrs. W. G. Hubacek and J. I. Tapia of our staff during the period May 30 - June 2,1978, of

-

>

activities authorized by NRC Construction Permit Nos. CPPR-128 and

- 129 for South Texas Project, Units No.1 and 2 and to the discussian r of our findings with Mr. S. A. Viaclovsky and other members of your

,

staff at the conclusion of the inspectio .

'

Areas examined during the inspection and our findings are discussed

'

in the enclosed inspection report. Within these antas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the inspector .t Within the scope of the inspection, no items of noncompliance were identifie ', We have also examined actions you have taken with regard to previously ,

- identified inspection findings. The status of these items is identified in paragraph 2 of the enclosed repor Two new unresolved items are identified in paragraphs 6 and 8 of the enclosed repor ,

In accordance with Section 2.790 of thh NRC's " Rules of Practice," Part 2 Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If the report contains any infonnation that you believe to be

-

', RECEIVED

-

'

8610310193 860930 A'g ' '

PDR FOIA G f b' JUN 22 E .r:

GARDE 85-378 PDR E.A..UR.iR T

'

g e e pwe e, e ,

E- l (p

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ . _ . _ _ . _ _ _ . _ _ _ . _ _ _ . _

.

I _ _- __ _ _

_

g ,

_ _ .

o

{

,

-
  • '

.

.

C _

Houston Lighting & Power Company -2- June 20, 1978

.$re E- proprietary, it is necessary that you submit a written application to ..

is this office, within 20 days of the date of this letter, requesting that

~

such information be withheld from public disclosure. The application

'

must include a full statement of the reasons why it is claimed that the information is proprietary. The application should be prepared so that any proprietary information identified is contained in an enclosure to i the application, since the application without the enclosure will also be placed in the Public Document Room. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room, a

Should you have any questions concerning this inspection, we will be

, pleased to discuss them with yo Sincerel .

jf _ ' ~, Q -

' W. C. Se le, Chief

- Reactor Construction and Engineering Support Branch e Enclosure:

l ! IE Inspection Report No. 50-498/78-10 50-499/78-10

...

.

. .