ML20211F096
| ML20211F096 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/11/1978 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Oprea G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20150F241 | List:
|
| References | |
| FOIA-85-378 NUDOCS 8610310052 | |
| Download: ML20211F096 (2) | |
See also: IR 05000498/1978004
Text
-
_ _ _ . .
..
. _ - ,
s
984C0
9'o,,
.
UNITED STATES
.
,
NUCLE AR REGULATORY COMMISSION
.
s,
,
$ ', *
~^o
REGION IV
.$
611 RYAN PLAZA DRIVE, SUITE 1000
C
~{ c '-
,
dd
p[
o1
m
,
% " * * *
April 11, 1978
In Reply Refer To:
36
RIV
Docket No. 50-498/Rpt. 78-04
50-499/Rpt. 78-04
Houston Lighting and Power Company
ATTN: Mr. G. W. Oprea, Jr.
Executive Vice President
Post Office Box 1700
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Mr. W. G. Hubacek and other
members of our staff during the period March 21-23, 1978, of activities
authorized by NRC Construction Permit Nos. CPPR-128 and 129 for South
Texas Project, Units No. I and 2, and to the discussion of our findings
with Mr. W. N. Phillips and other members of your staff at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During this inspection, it was found that certain activities under your
license appear to be in noncompliance with Appendix B to 10 CFR 50 of
the NRC Regulations, " Quality Assurance- Criteria for Nuclear Power
Plants." The item of noncompliance and references to the pertinent
requirements are identified in the enclosed Notice of Violation.
Corrective actions to prevent recurrence were completed prior to the
conclusion of this inspection; therefore, a reply to the Notice of
Violation is not requested.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified
in paragraph 2 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application 'to
8610310052 860930
7g
F4C//p
hDE
)-
_.
-
-_
.'
O
'
Houston Lighting and Power Co.
-2-
April 11, 1978
37
'
'
,
.
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure.- The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Docwnent Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
]
4
< dc'c
.
,
W. C. Se'#1e, Chief
t
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-498/78-04
50-499/78-04
.
l
l
l
t
.
--
7
_ -
- - - -
,
. - - , , . - - - . - - - - _ _ . -
-. --.
. - - -