ML20211F096

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/78-04 & 50-499/78-04 on 780321-23 & Notice of Violation.Certain Activities in Noncompliance W/ 10CFR50,App B.Corrective Actions Completed Prior to Conclusion of Insp
ML20211F096
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/11/1978
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20150F241 List:
References
FOIA-85-378 NUDOCS 8610310052
Download: ML20211F096 (2)


See also: IR 05000498/1978004

Text

. _ - ,

-

_ _ _ . . ..

s

,

. 984C0 . UNITED STATES

.

s, , 9'o,, NUCLE AR REGULATORY COMMISSION

    • $ ', * ~^

o REGION IV

~{ c '- .$

611 RYAN PLAZA DRIVE, SUITE 1000 C ,

o1 AR LINGTON, TEX AS 76011 dd

,

%"*** p[ m

April 11, 1978

In Reply Refer To: 36

RIV

Docket No. 50-498/Rpt. 78-04

50-499/Rpt. 78-04

Houston Lighting and Power Company

ATTN: Mr. G. W. Oprea, Jr.

Executive Vice President

Post Office Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr. W. G. Hubacek and other

members of our staff during the period March 21-23, 1978, of activities

authorized by NRC Construction Permit Nos. CPPR-128 and 129 for South

Texas Project, Units No. I and 2, and to the discussion of our findings

with Mr. W. N. Phillips and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

During this inspection, it was found that certain activities under your

license appear to be in noncompliance with Appendix B to 10 CFR 50 of

the NRC Regulations, " Quality Assurance- Criteria for Nuclear Power

Plants." The item of noncompliance and references to the pertinent

requirements are identified in the enclosed Notice of Violation.

Corrective actions to prevent recurrence were completed prior to the

conclusion of this inspection; therefore, a reply to the Notice of

Violation is not requested.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified

in paragraph 2 of the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room. If the report contains any information that you believe to be

proprietary, it is necessary that you submit a written application 'to

8610310052 860930

PDR F4C//p

hDE 7g

)-

- -_

_.

O

.'

'

37

'

'

,

Houston Lighting and Power Co. -2- April 11, 1978

.

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure.- The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room. If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Docwnent Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

.

] 4 < dc'c ,

W. C. Se'#1e, t Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A, Notice of Violation

2. IE Inspection Report No. 50-498/78-04

50-499/78-04

.

l

l

l

t

.

-- _ - - - - -

7 , . - - , , . - - - . - - - - _ _ . - -. --. . - - - _